Scheduled overtime / extra production hours
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).
What happens
Management schedules additional working hours beyond the standard shift calendar to recover lost output or meet demand, extending the planned operating time baseline rather than reflecting an equipment or process fault. This extra time is recorded as a distinct planned block in the production schedule, separate from the regular calendar.
What is done about it
Analyze the root causes that drive the need for overtime (chronic losses elsewhere in the six big losses) and address them to recover capacity within standard hours, and improve production planning and demand forecasting so extra shifts become the exception rather than a recurring compensation mechanism.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.1%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 57% [45–68%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.7%]13 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.4%]26 studies
- Brewing, wine and spirits0.4% [0.0–1.8%]11 studies
- Bakery and pasta0.4% [0.0–1.5%]24 studies
- Meat, poultry and seafood0.4% [0.0–1.7%]9 studies
- Fruit and vegetable processing0.4% [0.0–1.7%]7 studies
- Grain and oilseed milling0.4% [0.0–1.8%]6 studies
- Sugar and confectionery0.4% [0.0–1.7%]9 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.8%]5 studies
- Animal feed and pet food0.4% [0.0–1.7%]7 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.7%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceManagement schedules additional working hours beyond the standard shift calendar to recover lost output or meet demand, extending the planned operating time baseline rather than reflecting an equipment or process fault. This extra time is recorded as a distinct planned block in the production schedule, separate from the regular calendar.
How it looks in SCADA data
Engineering guidanceMES/ERP logs show additional run-time blocks tagged as overtime or extra shift outside the normal schedule calendar, with total calendar/available time increasing month to month without corresponding fault, jam or changeover alarms. Equipment state histories during these periods look like normal running or idle states, not failure codes.
Countermeasure
Engineering guidanceAnalyze the root causes that drive the need for overtime (chronic losses elsewhere in the six big losses) and address them to recover capacity within standard hours, and improve production planning and demand forecasting so extra shifts become the exception rather than a recurring compensation mechanism.
4Sources
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 11.0 h · as reported: “Extra hours, Month 1”
Show verbatim quote
Month 1 14.00 25.00 11.00
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 8.00 h · as reported: “Extra hours, Month 2”
Show verbatim quote
Month 2 12.00 20.00 8.00
- Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies (2024)Open sourceLost time: 11.0 h · as reported: “Extra hours - Month 1”
Show verbatim quote
Month 1 14.00 25.00 11.00
- Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies (2024)Open sourceLost time: 8.00 h · as reported: “Extra hours - Month 2”
Show verbatim quote
Month 2 12.00 20.00 8.00