Included study
Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies
1Bibliographic record
- Authors
- Sair Castañeda, Sharon Rodriguez, Orkun Yıldız, Duilio Aranda, José C. Álvarez
- Year
- 2024
- Venue
- International Journal of Engineering Trends and Technology
- Country
- Peru
- Segment
- Sugar and confectionery
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 2 machines
- Observation period
- 60 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The company under study belongs to the food industry in Lima, Peru. It has five production lines: Chocolate Line, Confectionery, Instant Products, Cereals and Milling.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Discussion)availability increases by 12.10%; initially, this parameter presented a percentage of 79.06%, and after the implementation, a value equal to 89.37% was obtained. | none | Availability | 89.4 % | Both extractors agreed |
—Show verbatim quote (Section 3.3.3)Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%) | none | Quality | 95.2 % | Both extractors agreed |
—Show verbatim quote (Section 3.3.3)Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%) | none | Performance | 94.9 % | Both extractors agreed |
—Show verbatim quote (Section 3.3.3)Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%) | none | Availability | 78.1 % | Both extractors agreed |
—Show verbatim quote (Section 3.3.3)Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%) | none | OEE | 70.5 % | Both extractors agreed |
—Show verbatim quote (Table 1)OEE 78.05% 90.00% 11.95 pp | none | OEE | 78.1 % | Single extractor |
—Show verbatim quote (Section 4.1)a gap in machinery availability has been identified, with the company under study reporting a value of 79.06%; however, the industry reflects that the value is acceptable greater than 90%. | none | Availability | 79.1 % | Single extractor |
—Doser/Cutter and PackerShow verbatim quote (Conclusion)The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance). | Equipment failure (breakdowns) | Time between events | 29.2 h | Single extractor |
—Doser/Cutter and PackerShow verbatim quote (Conclusion)The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance). | Equipment failure (breakdowns) | Mean event duration | 7.72 h | Single extractor |
—Doser/Cutter and PackerShow verbatim quote (Conclusion)The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance). | Equipment failure (breakdowns) | Time between events | 34.9 h | Single extractor |
—Doser/Cutter and PackerShow verbatim quote (Conclusion)The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance). | Equipment failure (breakdowns) | Mean event duration | 8.72 h | Single extractor |
—Show verbatim quote (Table 4)147.54 15 23 63.22 84.32 | Setup and adjustments | Lost time | 148 min | Single extractor |
Internal activitiesShow verbatim quote (Table 4)147.54 15 23 63.22 84.32 | Setup and adjustments | Number of events | 15.0 events | Single extractor |
External activitiesShow verbatim quote (Table 4)147.54 15 23 63.22 84.32 | Setup and adjustments | Number of events | 23.0 events | Single extractor |
Internal activitiesShow verbatim quote (Table 4)147.54 15 23 63.22 84.32 | Setup and adjustments | Lost time | 63.2 min | Single extractor |
External activitiesShow verbatim quote (Table 4)147.54 15 23 63.22 84.32 | Setup and adjustments | Lost time | 84.3 min | Single extractor |
—Show verbatim quote (Table 5)138.14 9 29 40.72 97.42 | Setup and adjustments | Lost time | 138 min | Single extractor |
Internal activitiesShow verbatim quote (Table 5)138.14 9 29 40.72 97.42 | Setup and adjustments | Number of events | 9.00 events | Single extractor |
External activitiesShow verbatim quote (Table 5)138.14 9 29 40.72 97.42 | Setup and adjustments | Number of events | 29.0 events | Single extractor |
Internal activitiesShow verbatim quote (Table 5)138.14 9 29 40.72 97.42 | Setup and adjustments | Lost time | 40.7 min | Single extractor |
External activitiesShow verbatim quote (Table 5)138.14 9 29 40.72 97.42 | Setup and adjustments | Lost time | 97.4 min | Single extractor |
—Show verbatim quote (Section 4.3.2 Phase 4)At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively. | Setup and adjustments | Lost time | 106 min | Single extractor |
External activitiesShow verbatim quote (Section 4.3.2 Phase 4)At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively. | Setup and adjustments | Number of events | 25.0 events | Single extractor |
Internal activitiesShow verbatim quote (Section 4.3.2 Phase 4)At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively. | Setup and adjustments | Lost time | 25.6 min | Single extractor |
External activitiesShow verbatim quote (Section 4.3.2 Phase 4)At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively. | Setup and adjustments | Lost time | 80.1 min | Single extractor |
Hours of factual preventive maintenance - Month 1Show verbatim quote (Table 7)Month 1 14.00 25.00 11.00 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 25.0 h | Single extractor |
Extra hours - Month 1Show verbatim quote (Table 7)Month 1 14.00 25.00 11.00 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 11.0 h | Single extractor |
Hours of factual preventive maintenance - Month 2Show verbatim quote (Table 7)Month 2 12.00 20.00 8.00 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 20.0 h | Single extractor |
Extra hours - Month 2Show verbatim quote (Table 7)Month 2 12.00 20.00 8.00 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8.00 h | Single extractor |
—Show verbatim quote (Section 3.3.3)performance (94.86%) and quality (95.19%) | none | Performance | 94.9 % | Single extractor |
—Show verbatim quote (Section 3.3.3)quality (95.19%) | none | Quality | 95.2 % | Single extractor |
Breakdowns in the MachineryPacker, Doser/CutterShow verbatim quote (Table 9, Pilot test on the leading causes of unplanned shutdowns)Breakdowns in the Machinery 12.20% | Equipment failure (breakdowns) | Share of loss events | 12.2 % | Single extractor |
Breakdowns due to human errors in calibration or operationShow verbatim quote (Table 9, Pilot test on the leading causes of unplanned shutdowns)Breakdowns due to human errors in calibration or operation 8.47% | Equipment failure (breakdowns) | Share of loss events | 8.47 % | Single extractor |
Observation units
- Confectionery line · Whole line or unspecified equipment · After intervention
- Confectionery line · Whole line or unspecified equipment · Baseline
- Critical machines (Doser/Cutter and Packer) · Whole line or unspecified equipment · Baseline
- Critical machines (Doser/Cutter and Packer) · Whole line or unspecified equipment · After intervention
- Confectionery line (SMED setup activities) · Whole line or unspecified equipment · Baseline
- Confectionery line (SMED setup activities) · Whole line or unspecified equipment · After intervention
- Confectionery line (preventive maintenance, pilot test) · Whole line or unspecified equipment · After intervention