Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies

Open source

1Bibliographic record

Authors
Sair Castañeda, Sharon Rodriguez, Orkun Yıldız, Duilio Aranda, José C. Álvarez
Year
2024
Venue
International Journal of Engineering Trends and Technology
Country
Peru
Segment
Sugar and confectionery
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
60 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The company under study belongs to the food industry in Lima, Peru. It has five production lines: Chocolate Line, Confectionery, Instant Products, Cereals and Milling.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Discussion)
availability increases by 12.10%; initially, this parameter presented a percentage of 79.06%, and after the implementation, a value equal to 89.37% was obtained.
noneAvailability89.4 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%)
noneQuality95.2 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%)
nonePerformance94.9 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%)
noneAvailability78.1 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%)
noneOEE70.5 %Both extractors agreed
—
Show verbatim quote (Table 1)
OEE 78.05% 90.00% 11.95 pp
noneOEE78.1 %Single extractor
—
Show verbatim quote (Section 4.1)
a gap in machinery availability has been identified, with the company under study reporting a value of 79.06%; however, the industry reflects that the value is acceptable greater than 90%.
noneAvailability79.1 %Single extractor
—Doser/Cutter and Packer
Show verbatim quote (Conclusion)
The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance).
Equipment failure (breakdowns)Time between events29.2 hSingle extractor
—Doser/Cutter and Packer
Show verbatim quote (Conclusion)
The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance).
Equipment failure (breakdowns)Mean event duration7.72 hSingle extractor
—Doser/Cutter and Packer
Show verbatim quote (Conclusion)
The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance).
Equipment failure (breakdowns)Time between events34.9 hSingle extractor
—Doser/Cutter and Packer
Show verbatim quote (Conclusion)
The number of stops due to machinery breakdowns and human errors was reduced, resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance).
Equipment failure (breakdowns)Mean event duration8.72 hSingle extractor
—
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time148 minSingle extractor
Internal activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsNumber of events15.0 eventsSingle extractor
External activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsNumber of events23.0 eventsSingle extractor
Internal activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time63.2 minSingle extractor
External activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time84.3 minSingle extractor
—
Show verbatim quote (Table 5)
138.14 9 29 40.72 97.42
Setup and adjustmentsLost time138 minSingle extractor
Internal activities
Show verbatim quote (Table 5)
138.14 9 29 40.72 97.42
Setup and adjustmentsNumber of events9.00 eventsSingle extractor
External activities
Show verbatim quote (Table 5)
138.14 9 29 40.72 97.42
Setup and adjustmentsNumber of events29.0 eventsSingle extractor
Internal activities
Show verbatim quote (Table 5)
138.14 9 29 40.72 97.42
Setup and adjustmentsLost time40.7 minSingle extractor
External activities
Show verbatim quote (Table 5)
138.14 9 29 40.72 97.42
Setup and adjustmentsLost time97.4 minSingle extractor
—
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time106 minSingle extractor
External activities
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsNumber of events25.0 eventsSingle extractor
Internal activities
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time25.6 minSingle extractor
External activities
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time80.1 minSingle extractor
Hours of factual preventive maintenance - Month 1
Show verbatim quote (Table 7)
Month 1 14.00 25.00 11.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time25.0 hSingle extractor
Extra hours - Month 1
Show verbatim quote (Table 7)
Month 1 14.00 25.00 11.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time11.0 hSingle extractor
Hours of factual preventive maintenance - Month 2
Show verbatim quote (Table 7)
Month 2 12.00 20.00 8.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time20.0 hSingle extractor
Extra hours - Month 2
Show verbatim quote (Table 7)
Month 2 12.00 20.00 8.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time8.00 hSingle extractor
—
Show verbatim quote (Section 3.3.3)
performance (94.86%) and quality (95.19%)
nonePerformance94.9 %Single extractor
—
Show verbatim quote (Section 3.3.3)
quality (95.19%)
noneQuality95.2 %Single extractor
Breakdowns in the MachineryPacker, Doser/Cutter
Show verbatim quote (Table 9, Pilot test on the leading causes of unplanned shutdowns)
Breakdowns in the Machinery 12.20%
Equipment failure (breakdowns)Share of loss events12.2 %Single extractor
Breakdowns due to human errors in calibration or operation
Show verbatim quote (Table 9, Pilot test on the leading causes of unplanned shutdowns)
Breakdowns due to human errors in calibration or operation 8.47%
Equipment failure (breakdowns)Share of loss events8.47 %Single extractor

Observation units

  • Confectionery line · Whole line or unspecified equipment · After intervention
  • Confectionery line · Whole line or unspecified equipment · Baseline
  • Critical machines (Doser/Cutter and Packer) · Whole line or unspecified equipment · Baseline
  • Critical machines (Doser/Cutter and Packer) · Whole line or unspecified equipment · After intervention
  • Confectionery line (SMED setup activities) · Whole line or unspecified equipment · Baseline
  • Confectionery line (SMED setup activities) · Whole line or unspecified equipment · After intervention
  • Confectionery line (preventive maintenance, pilot test) · Whole line or unspecified equipment · After intervention