Included study
IMPLEMENTASI 5R+1S SEBAGAI UPAYA PENINGKATAN EFEKTIVITAS PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. COCA-COLA BOTTLING INDONESIA
1Bibliographic record
- Authors
- Samsul Huda, Misbach Munir
- Year
- 2018
- Venue
- JKIE (Journal Knowledge Industrial Engineering)
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Penelitian dimulai dengan melakukan perhitungan OEE pada line 4 selama periode Juli – Desmber 2015.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Schedule ShutdownShow verbatim quote (Tabel 6)Juni 992 2.171 6.164 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 2,171 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)Juni 992 2.171 6.164 | Setup and adjustments | Lost time | 992 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 6)Mei 980 6.341 4.452 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 6,341 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)Mei 980 6.341 4.452 | Setup and adjustments | Lost time | 980 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 6)April 1.599 8.680 5.376 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8,680 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)April 1.599 8.680 5.376 | Setup and adjustments | Lost time | 1,599 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 6)Maret 1.957 14.278 1.707 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 14,278 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)Maret 1.957 14.278 1.707 | Setup and adjustments | Lost time | 1,957 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 6)Februari 2.051 10.424 1.098 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 10,424 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)Februari 2.051 10.424 1.098 | Setup and adjustments | Lost time | 2,051 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 6)Januari 1.278 13.731 929 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 13,731 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 6)Januari 1.278 13.731 929 | Setup and adjustments | Lost time | 1,278 menit | Both extractors agreed |
—Show verbatim quote (Tabel 7)Juni 84,60 92,68 99,90 78,33 | none | Quality | 99.9 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Juni 84,60 92,68 99,90 78,33 | none | Performance | 92.7 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Juni 84,60 92,68 99,90 78,33 | none | Availability | 84.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)April 83,67 76,21 99,78 63,62 | none | Quality | 99.8 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)April 83,67 76,21 99,78 63,62 | none | Performance | 76.2 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)April 83,67 76,21 99,78 63,62 | none | Availability | 83.7 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Maret 93,99 63,63 99,72 59,64 | none | Quality | 99.7 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Maret 93,99 63,63 99,72 59,64 | none | Performance | 63.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Maret 93,99 63,63 99,72 59,64 | none | Availability | 94.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Februari 96,25 70,13 99,71 67,30 | none | Quality | 99.7 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Februari 96,25 70,13 99,71 67,30 | none | Performance | 70.1 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Februari 96,25 70,13 99,71 67,30 | none | Availability | 96.3 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Januari 96,86 66,38 99,79 64,16 | none | Quality | 99.8 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Januari 96,86 66,38 99,79 64,16 | none | Performance | 66.4 % | Both extractors agreed |
—Show verbatim quote (Tabel 7)Januari 96,86 66,38 99,79 64,16 | none | Availability | 96.9 % | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 2)Desember 986 9.274 9.307 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 9,274 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 2)Desember 986 9.274 9.307 | Setup and adjustments | Lost time | 986 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 2)Oktober 1.687 8.213 15.131 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8,213 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 2)Oktober 1.687 8.213 15.131 | Setup and adjustments | Lost time | 1,687 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 2)Agustus 1.120 6.057 16.715 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 6,057 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 2)Agustus 1.120 6.057 16.715 | Setup and adjustments | Lost time | 1,120 menit | Both extractors agreed |
Schedule ShutdownShow verbatim quote (Tabel 2)Juli 1.025 8.963 14.174 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 8,963 menit | Both extractors agreed |
Set upShow verbatim quote (Tabel 2)Juli 1.025 8.963 14.174 | Setup and adjustments | Lost time | 1,025 menit | Both extractors agreed |
—Show verbatim quote (Tabel 3)Juli 59,10 77,63 99,60 45,69 | none | OEE | 45.7 % | Both extractors agreed |
—Show verbatim quote (Tabel 3)Juli 59,10 77,63 99,60 45,69 | none | Quality | 99.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 3)Juli 59,10 77,63 99,60 45,69 | none | Performance | 77.6 % | Both extractors agreed |
—Show verbatim quote (Tabel 3)Juli 59,10 77,63 99,60 45,69 | none | Availability | 59.1 % | Both extractors agreed |
—Show verbatim quote (Section 3.3 text)Secara rata-rata pencapaian OEE meningkat setelah penerapan 5R+1S sebesar 67,76% | none | OEE | 67.8 % | Both extractors agreed |
—Show verbatim quote (Tabel 3)Agustus 55,38 83,92 99,73 46,35 | none | Availability | 55.4 % | Single extractor |
—Show verbatim quote (Tabel 3)Agustus 55,38 83,92 99,73 46,35 | none | Performance | 83.9 % | Single extractor |
—Show verbatim quote (Tabel 3)Agustus 55,38 83,92 99,73 46,35 | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 3)Agustus 55,38 83,92 99,73 46,35 | none | OEE | 46.4 % | Single extractor |
—Show verbatim quote (Tabel 3)September 65,74 67,18 99,65 44,01 | none | Availability | 65.7 % | Single extractor |
—Show verbatim quote (Tabel 3)September 65,74 67,18 99,65 44,01 | none | Performance | 67.2 % | Single extractor |
—Show verbatim quote (Tabel 3)September 65,74 67,18 99,65 44,01 | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 3)September 65,74 67,18 99,65 44,01 | none | OEE | 44.0 % | Single extractor |
—Show verbatim quote (Tabel 3)Oktober 56,45 77,82 99,79 43,83 | none | Availability | 56.5 % | Single extractor |
—Show verbatim quote (Tabel 3)Oktober 56,45 77,82 99,79 43,83 | none | Performance | 77.8 % | Single extractor |
—Show verbatim quote (Tabel 3)Oktober 56,45 77,82 99,79 43,83 | none | Quality | 99.8 % | Single extractor |
—Show verbatim quote (Tabel 3)Oktober 56,45 77,82 99,79 43,83 | none | OEE | 43.8 % | Single extractor |
—Show verbatim quote (Tabel 3)November 67,66 69,21 99,73 46,70 | none | Availability | 67.7 % | Single extractor |
—Show verbatim quote (Tabel 3)November 67,66 69,21 99,73 46,70 | none | Performance | 69.2 % | Single extractor |
—Show verbatim quote (Tabel 3)November 67,66 69,21 99,73 46,70 | none | OEE | 46.7 % | Single extractor |
—Show verbatim quote (Tabel 3)Desember 72,93 77,02 99,68 55,98 | none | Availability | 72.9 % | Single extractor |
—Show verbatim quote (Tabel 3)Desember 72,93 77,02 99,68 55,98 | none | Performance | 77.0 % | Single extractor |
—Show verbatim quote (Tabel 3)Desember 72,93 77,02 99,68 55,98 | none | Quality | 99.7 % | Single extractor |
—Show verbatim quote (Tabel 3)Desember 72,93 77,02 99,68 55,98 | none | OEE | 56.0 % | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)Juli 1.025 8.963 14.174 | Not classifiable from the report | Lost time | 14,174 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)Agustus 1.120 6.057 16.715 | Not classifiable from the report | Lost time | 16,715 menit | Single extractor |
Set upShow verbatim quote (Tabel 2)September 1.768 12.412 9.943 | Setup and adjustments | Lost time | 1,768 menit | Single extractor |
Schedule ShutdownShow verbatim quote (Tabel 2)September 1.768 12.412 9.943 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 12,412 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)September 1.768 12.412 9.943 | Not classifiable from the report | Lost time | 9,943 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)Oktober 1.687 8.213 15.131 | Not classifiable from the report | Lost time | 15,131 menit | Single extractor |
Set upShow verbatim quote (Tabel 2)November 788 12.512 9.670 | Setup and adjustments | Lost time | 788 menit | Single extractor |
Schedule ShutdownShow verbatim quote (Tabel 2)November 788 12.512 9.670 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 12,512 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)November 788 12.512 9.670 | Not classifiable from the report | Lost time | 9,670 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 2)Desember 986 9.274 9.307 | Not classifiable from the report | Lost time | 9,307 menit | Single extractor |
—Show verbatim quote (Tabel 7)Mei 88,07 83,60 99,88 73,54 | none | Availability | 88.1 % | Single extractor |
—Show verbatim quote (Tabel 7)Mei 88,07 83,60 99,88 73,54 | none | Performance | 83.6 % | Single extractor |
—Show verbatim quote (Tabel 7)Mei 88,07 83,60 99,88 73,54 | none | Quality | 99.9 % | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)Januari 1.278 13.731 929 | Not classifiable from the report | Lost time | 929 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)Februari 2.051 10.424 1.098 | Not classifiable from the report | Lost time | 1,098 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)Maret 1.957 14.278 1.707 | Not classifiable from the report | Lost time | 1,707 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)April 1.599 8.680 5.376 | Not classifiable from the report | Lost time | 5,376 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)Mei 980 6.341 4.452 | Not classifiable from the report | Lost time | 4,452 menit | Single extractor |
Total DowntimeShow verbatim quote (Tabel 6)Juni 992 2.171 6.164 | Not classifiable from the report | Lost time | 6,164 menit | Single extractor |
—Show verbatim quote (Table 7, page 7)Tabel 7: Nilai OEE line 4 selama periode Januari – Juni 2016 Bulan Availability (%) Performance Rate (%) Quality Rate (%) OEE (%) Januari 96,86 66,38 99,79 64,16 | none | OEE | 64.2 % | Single extractor |
—Show verbatim quote (Table 7, page 7)Tabel 7: Nilai OEE line 4 selama periode Januari – Juni 2016 Bulan Availability (%) Performance Rate (%) Quality Rate (%) OEE (%) Maret 93,99 63,63 99,72 59,64 | none | OEE | 59.6 % | Single extractor |
—Show verbatim quote (Table 7, page 7)Tabel 7: Nilai OEE line 4 selama periode Januari – Juni 2016 Bulan Availability (%) Performance Rate (%) Quality Rate (%) OEE (%) April 83,67 76,21 99,78 63,62 | none | OEE | 63.6 % | Single extractor |
—Show verbatim quote (Table 7, page 7)Tabel 7: Nilai OEE line 4 selama periode Januari – Juni 2016 Bulan Availability (%) Performance Rate (%) Quality Rate (%) OEE (%) Juni 84,60 92,68 99,90 78,33 | none | OEE | 78.3 % | Single extractor |
Observation units
- Line 4 (Januari-Juni 2016, post-intervention) · Whole line or unspecified equipment · After intervention
- Line 4 (Juli-Desember 2015, baseline) · Whole line or unspecified equipment · Baseline
- Line 4 · Whole line or unspecified equipment · After intervention