In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 2 of the 31 studies that could observe it (limited evidence).

What happens

Between successive syrup batches the mixing tank must be emptied, cleaned if required, recharged with water and ingredients, and brought to the target concentration, temperature and homogeneity before the batch is released to the filling line. This preparation sequence, together with recipe selection and verification, consumes time during which no usable syrup is produced.

What is done about it

Standardize and pre-stage ingredient quantities, automate recipe loading and parameter checks in the batch control system, and overlap tank cleaning or charging with upstream or downstream line activities so that the preparation sequence runs in parallel rather than in series with filling demand.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.3% [0.3–3.8%]
Expected share of lost time
0.7% [0.1–2.1%]
Share of lost time when present
57% [45–67%]
Studies / units
31 / 40
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.5% [0.1–5.7%]6 studies
  • Soft drinks, bottled water and juices
    2.2% [0.2–7.8%]2 studies
  • Brewing, wine and spirits
    1.5% [0.2–5.7%]0 studies
  • Bakery and pasta
    2.1% [0.2–7.3%]2 studies
  • Meat, poultry and seafood
    1.6% [0.1–5.9%]1 study
  • Fruit and vegetable processing
    1.5% [0.1–6.0%]2 studies
  • Grain and oilseed milling
    1.6% [0.1–6.1%]0 studies
  • Sugar and confectionery
    1.5% [0.1–5.8%]3 studies
  • Snacks, coffee, tea and other foods
    1.5% [0.1–5.1%]3 studies
  • Animal feed and pet food
    1.4% [0.2–5.3%]5 studies
  • Food manufacturing (unspecified or mixed)
    1.5% [0.1–5.4%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Between successive syrup batches the mixing tank must be emptied, cleaned if required, recharged with water and ingredients, and brought to the target concentration, temperature and homogeneity before the batch is released to the filling line. This preparation sequence, together with recipe selection and verification, consumes time during which no usable syrup is produced.

How it looks in SCADA data

Engineering guidance

MES/SCADA shows an extended batch or setup state between the end of discharge of the previous batch and the start of stable mixing, with recipe-load and ingredient-charging events clustered in this window; total batch lead time recorded by the system is dominated by this non-productive segment rather than by active mixing time.

Countermeasure

Engineering guidance

Standardize and pre-stage ingredient quantities, automate recipe loading and parameter checks in the batch control system, and overlap tank cleaning or charging with upstream or downstream line activities so that the preparation sequence runs in parallel rather than in series with filling demand.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 140 min · as reported: “total leading time of syrup batching process”
    Show verbatim quote
    Total leading time of recently batching syrup process for new product is 140 minutes.
  2. Lost time: 98.0 min · as reported: “total leading time of syrup batching process”
    Show verbatim quote
    The project results obtained that the total time in the syrup batching process was reduced from 140 minutes to 98 minutes - a dramatic decrease of 42 minutes (equivalent to a 30% reduction) as shown on Figure 11.
  3. Mean event duration: 27.3 min · as reported: “Total Time”
    Show verbatim quote
    Total Time 27.25 18.22 9.04
  4. Mean event duration: 18.2 min · as reported: “Total Time”
    Show verbatim quote
    Total Time 27.25 18.22 9.04