Die or tooling retrieval delay during changeover
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 55 % of the line's lost time. Reported by 1 of the 120 studies that could observe it (sparse evidence).
What happens
During a format changeover the correct die or format-specific tooling for the filler is not available at the point of use, so operators must leave the line to locate it in storage or request it from another area. This searching time extends the external setup time because the die is needed before the machine can resume production, even though it could in principle be prepared in advance.
What is done about it
Apply SMED principles by converting this internal, line-stopping search into external preparation: stage and label all dies and format parts for the upcoming changeover at the point of use before the line stops, using shadow boards, kitting carts or a dedicated tooling storage system with clear location coding. Maintain a changeover parts checklist and assign retrieval tasks to a support operator in parallel with other preparation activities.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 55% [41–65%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.5% [0.1–1.9%]18 studies
- Soft drinks, bottled water and juices0.5% [0.1–1.5%]44 studies
- Brewing, wine and spirits0.8% [0.1–2.9%]16 studies
- Bakery and pasta0.6% [0.1–2.5%]0 studies
- Meat, poultry and seafood0.6% [0.1–2.2%]6 studies
- Fruit and vegetable processing0.6% [0.1–2.3%]4 studies
- Grain and oilseed milling0.6% [0.1–2.3%]6 studies
- Sugar and confectionery0.6% [0.1–2.3%]3 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.1%]6 studies
- Animal feed and pet food0.6% [0.1–2.3%]4 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.1%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceDuring a format changeover the correct die or format-specific tooling for the filler is not available at the point of use, so operators must leave the line to locate it in storage or request it from another area. This searching time extends the external setup time because the die is needed before the machine can resume production, even though it could in principle be prepared in advance.
How it looks in SCADA data
Engineering guidanceThe line or filler remains in a changeover or setup state for an unusually long period with no fault alarms active, and no material or cycle counts are recorded. Operator or MES event logs may show a changeover step held open or a manual pause without any corresponding mechanical adjustment activity, and downstream stations show starvation during this interval.
Countermeasure
Engineering guidanceApply SMED principles by converting this internal, line-stopping search into external preparation: stage and label all dies and format parts for the upcoming changeover at the point of use before the line stops, using shadow boards, kitting carts or a dedicated tooling storage system with clear location coding. Maintain a changeover parts checklist and assign retrieval tasks to a support operator in parallel with other preparation activities.
4Sources
- Lost time: 13.0 min · as reported: “Procurar ferramenta”
Show verbatim quote
18 Procurar ferramenta 13 0
- Lost time: 0 min · as reported: “Procurar ferramenta”
Show verbatim quote
18 Procurar ferramenta 13 0
- Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt (2024)Open sourceLost time: 2.00 min · as reported: “Search for new die”
Show verbatim quote
Search for new die 2 min 2 min External
- Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt (2024)Open sourceLost time: 2.00 min · as reported: “Search for new die”
Show verbatim quote
Search for new die | 2 min | 2 min | External