Implementação de metodologias Lean numa linha de enchimento de bebidas

Open source

1Bibliographic record

Authors
Graça Maria Soares Pereira
Year
2018
Venue
Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT)
Country
Portugal
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
1,095 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
A linha nº 5 é a de maior dimensão e tem uma capacidade homologada de produção de aproximadamente 80000 garrafas/hora, valor esse que corresponde à soma das capacidades de cada enchedora.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 3.1 / Figure 9)
descida de OEE (Overall Equipment Efficency), de 72,41% para 61,92%;
noneOEE72.4 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
descida de OEE (Overall Equipment Efficency), de 72,41% para 61,92%;
noneOEE61.9 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TD (tempo degradado), de 5,44% para 12,71%;
Not classifiable from the reportShare of planned time5.44 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TD (tempo degradado), de 5,44% para 12,71%;
Not classifiable from the reportShare of planned time12.7 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TAV (tempo de avarias), de 8,8% para 12,85%;
Equipment failure (breakdowns)Share of planned time8.80 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TAV (tempo de avarias), de 8,8% para 12,85%;
Equipment failure (breakdowns)Share of planned time12.9 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TMP (tempo de mudança de produto), de 1,40% para 3.01%;
Setup and adjustmentsShare of planned time1.40 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento do TMP (tempo de mudança de produto), de 1,40% para 3.01%;
Setup and adjustmentsShare of planned time3.01 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento de REX (razões externas), de 2,75% para 4,60%.
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time2.75 %Single extractor
—
Show verbatim quote (Section 3.1 / Figure 9)
aumento de REX (razões externas), de 2,75% para 4,60%.
Organizational or external stops (material or personnel shortage, utilities outage)Share of planned time4.60 %Single extractor
Mudar e transportar peças de formatoenchedora
Show verbatim quote (Table 5)
7, 8, 11, 12 Mudar e transportar peças de formato 38 20
Setup and adjustmentsLost time38.0 minSingle extractor
Instruções ao operador B
Show verbatim quote (Table 5)
9 Instruções ao operador B 2 0
Setup and adjustmentsLost time2.00 minSingle extractor
Empurrar garrafas no pasteurizadorpasteurizador
Show verbatim quote (Table 5)
10 Empurrar garrafas no pasteurizador 6 0
Setup and adjustmentsLost time6.00 minSingle extractor
Ajustesenchedora
Show verbatim quote (Table 5)
16 Ajustes 14 4
Setup and adjustmentsLost time14.0 minSingle extractor
Procurar ferramenta
Show verbatim quote (Table 5)
18 Procurar ferramenta 13 0
Setup and adjustmentsLost time13.0 minSingle extractor
Apertar fixação da capsuladoracapsuladora
Show verbatim quote (Table 5)
19 Apertar fixação da capsuladora 3 1
Setup and adjustmentsLost time3.00 minSingle extractor
Esperar por garrafas
Show verbatim quote (Table 5)
20 Esperar por garrafas 10 0
Setup and adjustmentsLost time10.0 minSingle extractor
Testar enchimentoenchedora
Show verbatim quote (Table 5)
21 Testar enchimento 5 0
Setup and adjustmentsLost time5.00 minSingle extractor
—
Show verbatim quote (Table 5)
Tempo total (min) 91 25
Setup and adjustmentsLost time91.0 minSingle extractor
Mudar e transportar guias da capsuladoracapsuladora
Show verbatim quote (Table 10)
8, 15, 19 Mudar e transportar guias da capsuladora 15 6
Setup and adjustmentsLost time15.0 minSingle extractor
Mudar e transportar pistões de capsulagemcapsuladora
Show verbatim quote (Table 10)
9, 12 Mudar e transportar pistões de capsulagem 43 20
Setup and adjustmentsLost time43.0 minSingle extractor
Trazer a mangueira para junto da enchedoraenchedora
Show verbatim quote (Table 10)
10 Trazer a mangueira para junto da enchedora 1 0
Setup and adjustmentsLost time1.00 minSingle extractor
Trazer carro para mais junto das enchedoras
Show verbatim quote (Table 10)
11, 13 Trazer carro para mais junto das enchedoras 13 1
Setup and adjustmentsLost time13.0 minSingle extractor
Resolução de parafuso moído no pistãocapsuladora
Show verbatim quote (Table 10)
14, 16 Resolução de parafuso moído no pistão 57 0
Setup and adjustmentsLost time57.0 minSingle extractor
Retirar pistão que o operador B se enganou a montarcapsuladora
Show verbatim quote (Table 10)
17 Retirar pistão que o operador B se enganou a montar 2 0
Setup and adjustmentsLost time2.00 minSingle extractor
—
Show verbatim quote (Table 10)
Tempo total (min) 131 27
Setup and adjustmentsLost time131 minSingle extractor
Mudança de taraenchedora
Show verbatim quote (Table 12)
Mudança de tara 102,5 min 42 min 60,5 min 1,07%
Setup and adjustmentsMean event duration103 minSingle extractor
Mudança de cápsulaenchedora
Show verbatim quote (Table 12)
Mudança de cápsula 118,4 min 55 min 63,4 min
Setup and adjustmentsMean event duration118 minSingle extractor
Mudança de tara e cápsulaenchedora
Show verbatim quote (Table 12)
Mudança de tara e cápsula 151,8 min 84 min 67,8 min
Setup and adjustmentsMean event duration152 minSingle extractor
Mudança de tara (trabalho interno)enchedora
Show verbatim quote (Section 4.5.1)
A média da duração de trabalho interno das mudanças de tara observadas é de 115 minutos.
Setup and adjustmentsMean event duration115 minSingle extractor
Mudança de cápsula (trabalho interno)enchedora
Show verbatim quote (Section 4.5.2)
A média da duração de trabalho interno das mudanças de cápsula observadas é de 100 minutos.
Setup and adjustmentsMean event duration100 minSingle extractor
Mudar e transportar peças de formatoenchedora
Show verbatim quote (Table 5)
7, 8, 11, 12 Mudar e transportar peças de formato 38 20
Setup and adjustmentsLost time20.0 minSingle extractor
Instruções ao operador B
Show verbatim quote (Table 5)
9 Instruções ao operador B 2 0
Setup and adjustmentsLost time0 minSingle extractor
Empurrar garrafas no pasteurizadorpasteurizador
Show verbatim quote (Table 5)
10 Empurrar garrafas no pasteurizador 6 0
Setup and adjustmentsLost time0 minSingle extractor
Ajustesenchedora
Show verbatim quote (Table 5)
16 Ajustes 14 4
Setup and adjustmentsLost time4.00 minSingle extractor
Procurar ferramenta
Show verbatim quote (Table 5)
18 Procurar ferramenta 13 0
Setup and adjustmentsLost time0 minSingle extractor
Apertar fixação da capsuladoracapsuladora
Show verbatim quote (Table 5)
19 Apertar fixação da capsuladora 3 1
Setup and adjustmentsLost time1.00 minSingle extractor
Esperar por garrafas
Show verbatim quote (Table 5)
20 Esperar por garrafas 10 0
Setup and adjustmentsLost time0 minSingle extractor
Testar enchimentoenchedora
Show verbatim quote (Table 5)
21 Testar enchimento 5 0
Setup and adjustmentsLost time0 minSingle extractor
—
Show verbatim quote (Table 5)
Tempo total (min) 91 25
Setup and adjustmentsLost time25.0 minSingle extractor
Mudar e transportar guias da capsuladoracapsuladora
Show verbatim quote (Table 10)
8, 15, 19 Mudar e transportar guias da capsuladora 15 6
Setup and adjustmentsLost time6.00 minSingle extractor
Mudar e transportar pistões de capsulagemcapsuladora
Show verbatim quote (Table 10)
9, 12 Mudar e transportar pistões de capsulagem 43 20
Setup and adjustmentsLost time20.0 minSingle extractor
Trazer a mangueira para junto da enchedoraenchedora
Show verbatim quote (Table 10)
10 Trazer a mangueira para junto da enchedora 1 0
Setup and adjustmentsLost time0 minSingle extractor
Trazer carro para mais junto das enchedoras
Show verbatim quote (Table 10)
11, 13 Trazer carro para mais junto das enchedoras 13 1
Setup and adjustmentsLost time1.00 minSingle extractor
Resolução de parafuso moído no pistãocapsuladora
Show verbatim quote (Table 10)
14, 16 Resolução de parafuso moído no pistão 57 0
Setup and adjustmentsLost time0 minSingle extractor
Retirar pistão que o operador B se enganou a montarcapsuladora
Show verbatim quote (Table 10)
17 Retirar pistão que o operador B se enganou a montar 2 0
Setup and adjustmentsLost time0 minSingle extractor
—
Show verbatim quote (Table 10)
Tempo total (min) 131 27
Setup and adjustmentsLost time27.0 minSingle extractor
Mudança de taraenchedora
Show verbatim quote (Table 12)
Mudança de tara 102,5 min 42 min 60,5 min 1,07%
Setup and adjustmentsMean event duration42.0 minSingle extractor
Mudança de cápsulaenchedora
Show verbatim quote (Table 12)
Mudança de cápsula 118,4 min 55 min 63,4 min
Setup and adjustmentsMean event duration55.0 minSingle extractor
Mudança de tara e cápsulaenchedora
Show verbatim quote (Table 12)
Mudança de tara e cápsula 151,8 min 84 min 67,8 min
Setup and adjustmentsMean event duration84.0 minSingle extractor
Mudança de tara (trabalho interno)enchedora
Show verbatim quote (Section 4.5.1)
O diagrama de Gantt (Anexo E) indica que o trabalho interno de uma mudança de tara pode ser executado em 30 minutos e que, no total, o tempo requerido para a mudança de tara são 42 minutos.
Setup and adjustmentsMean event duration30.0 minSingle extractor
Mudança de cápsula (trabalho interno)enchedora
Show verbatim quote (Section 4.5.2)
O diagrama indica que o trabalho interno de uma mudança de cápsula pode ser executado em 44 minutos e que, no total, o tempo requerido para a mudança de tara são 55 minutos.
Setup and adjustmentsMean event duration44.0 minSingle extractor
Mudança de tara e cápsula (trabalho interno)enchedora
Show verbatim quote (Section 4.5.3)
O diagrama indica que o trabalho interno de uma mudança de tara e cápsula pode ser executado em 69 minutos e que, no total, o tempo requerido para a mudança de tara e cápsula são 84 minutos
Setup and adjustmentsMean event duration69.0 minSingle extractor
Bottle size changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Entre 2015 e 2017, a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula duravam em média 102,5 minutos, 119,4 minutos e 151,8 minutos respetivamente
Setup and adjustmentsLost time103 minSingle extractor
Capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Entre 2015 e 2017, a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula duravam em média 102,5 minutos, 119,4 minutos e 151,8 minutos respetivamente
Setup and adjustmentsLost time119 minSingle extractor
Bottle size and capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Entre 2015 e 2017, a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula duravam em média 102,5 minutos, 119,4 minutos e 151,8 minutos respetivamente
Setup and adjustmentsLost time152 minSingle extractor
Bottle size changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.1, Identificação dos tipos de mudança críticos, page 23)
as mudanças que resultam na maior percentagem de tempo improdutivo são as mudanças de tara, de cápsula e de ambas em simultâneo, sem que haja mudança de cerveja, representando um peso percentual de 23,8%, 23,7% e 16,7% respetivamente
Setup and adjustmentsShare of lost time23.8 %Single extractor
Capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.1, Identificação dos tipos de mudança críticos, page 23)
as mudanças que resultam na maior percentagem de tempo improdutivo são as mudanças de tara, de cápsula e de ambas em simultâneo, sem que haja mudança de cerveja, representando um peso percentual de 23,8%, 23,7% e 16,7% respetivamente
Setup and adjustmentsShare of lost time23.7 %Single extractor
Bottle size and capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.1, Identificação dos tipos de mudança críticos, page 23)
as mudanças que resultam na maior percentagem de tempo improdutivo são as mudanças de tara, de cápsula e de ambas em simultâneo, sem que haja mudança de cerveja, representando um peso percentual de 23,8%, 23,7% e 16,7% respetivamente
Setup and adjustmentsShare of lost time16.7 %Single extractor
Bottle size changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Considera-se que a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula, após as melhorias desenvolvidas no projeto, passam a durar em média 42, 55 e 84 minutos (ver secção 4.6)
Setup and adjustmentsLost time42.0 minSingle extractor
Capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Considera-se que a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula, após as melhorias desenvolvidas no projeto, passam a durar em média 42, 55 e 84 minutos (ver secção 4.6)
Setup and adjustmentsLost time55.0 minSingle extractor
Bottle size and capsule type changeoverEnchedoras (Fillers)
Show verbatim quote (Section 4.7, Quantificação das melhorias desenvolvidas, page 44)
Considera-se que a mudança de tara, a mudança de cápsula e a mudança de tara e cápsula, após as melhorias desenvolvidas no projeto, passam a durar em média 42, 55 e 84 minutos (ver secção 4.6)
Setup and adjustmentsLost time84.0 minSingle extractor

Observation units

  • Linha 5 (whole filling line) · Whole line or unspecified equipment · Baseline
  • Enchedoras (two fillers, Line 5) · Filling · Baseline
  • Enchedoras (two fillers, Line 5) · Filling · After intervention
  • Line 5 - Fillers (Enchedoras) · Filling · Baseline
  • Line 5 - Fillers (Enchedoras) · Filling · After intervention