USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN)
1Bibliographic record
- Authors
- Delia Fitri Rahmadhani, Harsono Taroepratjeka, Lisye Fitria
- Year
- 2014
- Venue
- REKA INTEGRA
- DOI
- —
- Country
- Indonesia
- Segment
- Snacks, coffee, tea and other foods
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 30 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
Perusahaan Kerupuk TTN adalah salah satu perusahaan kerupuk di Kota Bandung.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—mesin cetak manualShow verbatim quote (Table 3)Total 240000 4246 98,231 | none | Quality | 98.2 % | Both extractors agreed |
—mesin cetak manualShow verbatim quote (Table 2)Total 4050 235754 85.604 | none | Performance | 85.6 % | Both extractors agreed |
—mesin cetak manualShow verbatim quote (Table 1)Total 10800 600 10200 1942 750 7508 73,608 | none | Availability | 73.6 % | Both extractors agreed |
—mesin cetak manualShow verbatim quote (Section 5 Analisis / Table 4)Dari hasil perhitungan yang telah dilakukan, didapatkan rata-rata nilai OEE untuk bulan April 2014 adalah sebesar 61,920%. | none | OEE | 61.9 % | Both extractors agreed |
Equipment Failure Lossesmesin cetak manualShow verbatim quote (Section 4.5, point 1)= 1942 10200 𝑥 100% = 19,039% | Equipment failure (breakdowns) | Share of planned time | 19.0 % | Single extractor |
Setup and Adjustment Lossesmesin cetak manualShow verbatim quote (Section 4.5, point 2)= 750 10200 𝑥 100% = 7,353 | Setup and adjustments | Share of planned time | 7.35 % | Single extractor |
Idle and Minor Stoppage Lossesmesin cetak manualShow verbatim quote (Section 4.5, point 3)= (240000−235754)𝑥 0,015 10200 = 0,573% | Idling and minor stops (micro-stops) | Share of planned time | 0.573 % | Single extractor |
Reduce Speed Lossesmesin cetak manualShow verbatim quote (Section 4.5, point 4)= (0,032 −0,015)𝑥 235754 10200 𝑥 100% = 39,292% | Reduced speed | Share of planned time | 39.3 % | Single extractor |
Defect Lossesmesin cetak manualShow verbatim quote (Section 4.5, point 5)= 4246 𝑥 0,015 10200 𝑥 100% = 0,624% | Process defects (scrap and rework) | Share of planned time | 0.624 % | Single extractor |
—mesin cetak manualShow verbatim quote (Table 1)Total 10800 600 10200 1942 750 7508 73,608 | Equipment failure (breakdowns) | Lost time | 1,942 min | Single extractor |
—mesin cetak manualShow verbatim quote (Table 1)Total 10800 600 10200 1942 750 7508 73,608 | Setup and adjustments | Lost time | 750 min | Single extractor |
—mesin cetak manualShow verbatim quote (Table 1)Total 10800 600 10200 1942 750 7508 73,608 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 600 min | Single extractor |
Observation units
- Mesin Cetak Manual · Forming, moulding and depositing · Baseline