USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN)

Open source

1Bibliographic record

Authors
Delia Fitri Rahmadhani, Harsono Taroepratjeka, Lisye Fitria
Year
2014
Venue
REKA INTEGRA
DOI
—
Country
Indonesia
Segment
Snacks, coffee, tea and other foods
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
30 days
Data collection
not_reported
Intervention
Show the setting as described by the study
Perusahaan Kerupuk TTN adalah salah satu perusahaan kerupuk di Kota Bandung.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—mesin cetak manual
Show verbatim quote (Table 3)
Total 240000 4246 98,231
noneQuality98.2 %Both extractors agreed
—mesin cetak manual
Show verbatim quote (Table 2)
Total 4050 235754 85.604
nonePerformance85.6 %Both extractors agreed
—mesin cetak manual
Show verbatim quote (Table 1)
Total 10800 600 10200 1942 750 7508 73,608
noneAvailability73.6 %Both extractors agreed
—mesin cetak manual
Show verbatim quote (Section 5 Analisis / Table 4)
Dari hasil perhitungan yang telah dilakukan, didapatkan rata-rata nilai OEE untuk bulan April 2014 adalah sebesar 61,920%.
noneOEE61.9 %Both extractors agreed
Equipment Failure Lossesmesin cetak manual
Show verbatim quote (Section 4.5, point 1)
= 1942 10200 𝑥 100% = 19,039%
Equipment failure (breakdowns)Share of planned time19.0 %Single extractor
Setup and Adjustment Lossesmesin cetak manual
Show verbatim quote (Section 4.5, point 2)
= 750 10200 𝑥 100% = 7,353
Setup and adjustmentsShare of planned time7.35 %Single extractor
Idle and Minor Stoppage Lossesmesin cetak manual
Show verbatim quote (Section 4.5, point 3)
= (240000−235754)𝑥 0,015 10200 = 0,573%
Idling and minor stops (micro-stops)Share of planned time0.573 %Single extractor
Reduce Speed Lossesmesin cetak manual
Show verbatim quote (Section 4.5, point 4)
= (0,032 −0,015)𝑥 235754 10200 𝑥 100% = 39,292%
Reduced speedShare of planned time39.3 %Single extractor
Defect Lossesmesin cetak manual
Show verbatim quote (Section 4.5, point 5)
= 4246 𝑥 0,015 10200 𝑥 100% = 0,624%
Process defects (scrap and rework)Share of planned time0.624 %Single extractor
—mesin cetak manual
Show verbatim quote (Table 1)
Total 10800 600 10200 1942 750 7508 73,608
Equipment failure (breakdowns)Lost time1,942 minSingle extractor
—mesin cetak manual
Show verbatim quote (Table 1)
Total 10800 600 10200 1942 750 7508 73,608
Setup and adjustmentsLost time750 minSingle extractor
—mesin cetak manual
Show verbatim quote (Table 1)
Total 10800 600 10200 1942 750 7508 73,608
Planned downtime (scheduled maintenance, breaks, no demand)Lost time600 minSingle extractor

Observation units

  • Mesin Cetak Manual · Forming, moulding and depositing · Baseline