Minor stoppages on forming machines
In short
It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 52 % of the line's lost time. Reported by 5 of the 76 studies that could observe it (good evidence).
What happens
Forming equipment such as presses, manual moulding machines and blow moulders experience frequent brief stops caused by material misfeeds, mould or die sticking, blocked sensors, or parts that fail to eject or advance correctly. These interruptions are cleared quickly by the operator through manual intervention, resetting or clearing the obstruction, without requiring maintenance.
What is done about it
Apply autonomous maintenance routines with operator checklists for mould cleaning and feed guide adjustment, improve material feed and part ejection mechanisms, and standardise quick-clearance procedures to shorten each stoppage. Root-cause the most frequent fault codes to redesign the feed path or sensor placement and reduce recurrence.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 2.2% [0.6–5.1%]
- Expected share of lost time
- 1.1% [0.3–2.6%]
- Share of lost time when present
- 52% [40–62%]
- Studies / units
- 76 / 96
- Evidence grade
- B
Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.
2Probability by segment
- Dairy products2.4% [0.4–8.0%]5 studies
- Soft drinks, bottled water and juices3.9% [0.7–10.9%]11 studies
- Brewing, wine and spirits2.6% [0.4–8.6%]0 studies
- Bakery and pasta2.4% [0.5–6.6%]25 studies
- Meat, poultry and seafood3.7% [0.6–12.7%]3 studies
- Fruit and vegetable processing2.5% [0.3–7.8%]3 studies
- Grain and oilseed milling2.6% [0.4–8.8%]0 studies
- Sugar and confectionery2.2% [0.3–7.0%]8 studies
- Snacks, coffee, tea and other foods2.2% [0.3–6.9%]7 studies
- Animal feed and pet food2.3% [0.3–7.5%]6 studies
- Food manufacturing (unspecified or mixed)3.3% [0.5–10.3%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceForming equipment such as presses, manual moulding machines and blow moulders experience frequent brief stops caused by material misfeeds, mould or die sticking, blocked sensors, or parts that fail to eject or advance correctly. These interruptions are cleared quickly by the operator through manual intervention, resetting or clearing the obstruction, without requiring maintenance.
How it looks in SCADA data
Engineering guidanceMES/SCADA logs show numerous short transitions to a stopped or idle machine state interspersed within otherwise running periods, with cycle or stroke counters showing gaps rather than continuous increments. Alarm history reveals repeated low-severity faults (feed, mould, sensor) that are acknowledged and cleared rapidly by the operator without a maintenance work order being generated.
Countermeasure
Engineering guidanceApply autonomous maintenance routines with operator checklists for mould cleaning and feed guide adjustment, improve material feed and part ejection mechanisms, and standardise quick-clearance procedures to shorten each stoppage. Root-cause the most frequent fault codes to redesign the feed path or sensor placement and reduce recurrence.
4Sources
- USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN) (2014)Open sourceShare of planned time: 0.573 % · as reported: “Idle and Minor Stoppage Losses”
Show verbatim quote
= (240000−235754)𝑥 0,015 10200 = 0,573%
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceShare of lost time: 2.50 % · as reported: “Idling & minor stoppages losses”
Show verbatim quote
Idling & minor stoppages losses 8,30 2,50 97,39
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceLost time: 8.30 jam · as reported: “Idling & minor stoppages losses”
Show verbatim quote
Idling & minor stoppages losses 8,30 2,50 97,39
- ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY (2020)Open sourceShare of lost time: 10.6 % · as reported: “Minor stoppage”
Show verbatim quote
Minor stoppage 6.30% 10.40% 15.00% 10.56%
- Share of lost time: 24.6 % · as reported: “idling & minor stoppages losses”
Show verbatim quote
the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
- Measuring the Efficiency of Contiform Machines with the Overall Equipment Effectiveness Method at PT Tirta Investama Pandaan (2025)Open sourceShare of lost time: 29.8 % · as reported: “Idle Minor Stoppage”
Show verbatim quote
The Six Big Losses analysis identified the two most dominant major losses, namely idle minor stoppage of 29.82% and reduce speed of 13.53%.
- Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing (2025)Open sourceShare of lost time: 11.5 % · as reported: “Idling & Minor Stoppage Losses”
Show verbatim quote
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21
- Improving press machine efficiency using a TPM approach and Six Big Losses analysis (2025)Open sourceShare of lost time: 48.0 % · as reported: “idling and minor stoppages”
Show verbatim quote
The primary causes of low efficiency are idling and minor stoppages (48%) and equipment failures (28%), both of which are influenced by a lack of preventive maintenance and errors in machine settings.