Changeover and setup adjustment on grinding mill

Setup and adjustmentsAvailabilityMilling and grinding

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 54 % of the line's lost time. Reported by 2 of the 43 studies that could observe it (limited evidence).

What happens

Production stops while the grinding mill is reconfigured between runs: changing grinding plates, screens or rollers, resetting gaps and feed parameters, and fine-tuning the machine until it reaches stable operating conditions for the new product or specification. This elapsed time between the last good unit of the previous run and the first good unit of the next run is non-productive by nature.

What is done about it

Standardize and document the setup procedure with pre-set gap and feed references per product, use quick-change tooling for plates/screens, and prepare parts and adjustments offline (SMED approach) to shorten the changeover window.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.3% [0.2–3.7%]
Expected share of lost time
0.7% [0.1–1.9%]
Share of lost time when present
54% [42–64%]
Studies / units
43 / 48
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.4% [0.1–5.3%]5 studies
  • Soft drinks, bottled water and juices
    1.5% [0.1–5.9%]1 study
  • Brewing, wine and spirits
    1.5% [0.1–6.0%]0 studies
  • Bakery and pasta
    1.5% [0.1–5.6%]0 studies
  • Meat, poultry and seafood
    1.5% [0.2–6.0%]0 studies
  • Fruit and vegetable processing
    1.4% [0.2–5.3%]2 studies
  • Grain and oilseed milling
    1.4% [0.1–5.5%]7 studies
  • Sugar and confectionery
    1.9% [0.2–6.3%]10 studies
  • Snacks, coffee, tea and other foods
    1.3% [0.1–4.9%]5 studies
  • Animal feed and pet food
    2.0% [0.2–7.4%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.4% [0.2–5.1%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Production stops while the grinding mill is reconfigured between runs: changing grinding plates, screens or rollers, resetting gaps and feed parameters, and fine-tuning the machine until it reaches stable operating conditions for the new product or specification. This elapsed time between the last good unit of the previous run and the first good unit of the next run is non-productive by nature.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows the mill in a changeover or setup machine-state with the line otherwise idle or starved downstream, bracketed by order or recipe change events; motor running at low or no load with no material throughput logged, followed by a ramp-up period before stable speed and load are reached.

Countermeasure

Engineering guidance

Standardize and document the setup procedure with pre-set gap and feed references per product, use quick-change tooling for plates/screens, and prepare parts and adjustments offline (SMED approach) to shorten the changeover window.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of planned time: 7.35 % · as reported: “Setup and Adjustment Losses”
    Show verbatim quote
    = 750 10200 𝑥 100% = 7,353
  2. Share of lost time: 1.82 % · as reported: “Setup and adjusment losses”
    Show verbatim quote
    Setup and adjusment losses 6,00 1,82 99,21
  3. Lost time: 6.00 jam · as reported: “Setup and adjusment losses”
    Show verbatim quote
    Setup and adjusment losses 6,00 1,82 99,21
  4. Share of lost time: 0.159 % · as reported: “setup and adjustment losses”
    Show verbatim quote
    Rata-rata kerugian yang terjadi pada setiap mesin yaitu breakdown losses 0,048%, setup and adjustment losses 0,159%, idle and minor stoppages 12,127%, dan reduced speed losses 11,749%.
  5. Share of planned time: 4.00 % · as reported: “set up and adjustment”
    Show verbatim quote
    Rata-rata waktu set up & adjustment losses pada mesin grinding yaitu sebesar 4%.
  6. Lost time: 22.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  7. Lost time: 35.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  8. Lost time: 12.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  9. Lost time: 18.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  10. Lost time: 42.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  11. Lost time: 17.0 jam · as reported: “setup and adjustment”
    Show verbatim quote
    Setup and adjustment (jam) 22 35 12 18 42 17
  12. Lost time: 210 minute · as reported: “setup time (total)”
    Show verbatim quote
    Time to set up minute 303.54 195 210.02 -30.81%
  13. Lost time: 304 minute · as reported: “setup time (total)”
    Show verbatim quote
    Time to set up minute 303.54 195 210.02 -30.81%
  14. Number of events: 175 times · as reported: “faults”
    Show verbatim quote
    Number of faults times 243 120 175 -27.98%
  15. Number of events: 243 times · as reported: “faults”
    Show verbatim quote
    Number of faults times 243 120 175 -27.98%
  16. Lost time: 301 minutes · as reported: “setup time (total)”
    Show verbatim quote
    As a result, the total setup time decreased from 301.28 minutes to 210.02 minutes, representing a 30.81% improvement.
  17. Lost time: 301 minutes · as reported: “internal setup activities”
    Show verbatim quote
    The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly.
  18. Share of lost time: 25.0 % · as reported: “frequent operator failures”
    Show verbatim quote
    At Level 1 of the analysis, the primary causes were identified as high unproductive times (75%) and frequent operator failures (25%).
  19. Share of lost time: 29.0 % · as reported: “frequent setup stops”
    Show verbatim quote
    At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%).
  20. Lost time: 225 minutes · as reported: “internal setup activities”
    Show verbatim quote
    The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly.
  21. Share of lost time: 0.730 % · as reported: “setup & adjustment losses”
    Show verbatim quote
    Sementara itu, breakdown losses sebesar 3,33%, setup & adjustment losses sebesar 0,73%, dan process defect losses sebesar 2,5% tergolong rendah, sehingga tidak menjadi faktor dominan dalam penurunan kinerja mesin.