Unspecified production stoppage (pelletizing/forming)
In short
It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 4 of the 76 studies that could observe it (limited evidence).
What happens
The pelletizing or forming machine halts for a reason that the primary report does not describe beyond the generic term stoppage; the underlying trigger could be mechanical, material related or organisational but is not documented. Without a specific fault description the event cannot be attributed to a single physical mechanism.
What is done about it
Implement structured stop-reason entry in the SCADA or MES system so operators and technicians select a specific cause code at the moment of the stoppage, and audit records periodically to close gaps in reason logging. Train shift personnel on consistent downtime coding to enable future root cause analysis instead of generic stoppage entries.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.8% [0.5–4.4%]
- Expected share of lost time
- 1.1% [0.3–2.7%]
- Share of lost time when present
- 59% [48–69%]
- Studies / units
- 76 / 96
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products2.1% [0.3–6.3%]5 studies
- Soft drinks, bottled water and juices3.4% [0.6–10.1%]11 studies
- Brewing, wine and spirits2.2% [0.3–7.1%]0 studies
- Bakery and pasta1.6% [0.2–4.6%]25 studies
- Meat, poultry and seafood2.2% [0.3–8.1%]3 studies
- Fruit and vegetable processing2.1% [0.3–6.9%]3 studies
- Grain and oilseed milling2.2% [0.3–7.9%]0 studies
- Sugar and confectionery1.9% [0.3–5.9%]8 studies
- Snacks, coffee, tea and other foods2.7% [0.4–8.8%]7 studies
- Animal feed and pet food2.8% [0.4–9.0%]6 studies
- Food manufacturing (unspecified or mixed)2.0% [0.3–6.6%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe pelletizing or forming machine halts for a reason that the primary report does not describe beyond the generic term stoppage; the underlying trigger could be mechanical, material related or organisational but is not documented. Without a specific fault description the event cannot be attributed to a single physical mechanism.
How it looks in SCADA data
Engineering guidanceThe equipment state log shows a stopped or idle state with no associated fault code, alarm tag or reason description, and the downtime counter increments under a generic or blank category. Neighbouring upstream and downstream stations may show starvation or blocking without further diagnostic detail.
Countermeasure
Engineering guidanceImplement structured stop-reason entry in the SCADA or MES system so operators and technicians select a specific cause code at the moment of the stoppage, and audit records periodically to close gaps in reason logging. Train shift personnel on consistent downtime coding to enable future root cause analysis instead of generic stoppage entries.
4Sources
- USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN) (2014)Open sourceShare of planned time: 19.0 % · as reported: “Equipment Failure Losses”
Show verbatim quote
= 1942 10200 𝑥 100% = 19,039%
- USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN) (2014)Open sourceShare of planned time: 39.3 % · as reported: “Reduce Speed Losses”
Show verbatim quote
= (0,032 −0,015)𝑥 235754 10200 𝑥 100% = 39,292%
- USULAN PENINGKATAN EFEKTIVITAS MESIN CETAK MANUAL MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) (STUDI KASUS DI PERUSAHAAN KERUPUK TTN) (2014)Open sourceShare of planned time: 0.624 % · as reported: “Defect Losses”
Show verbatim quote
= 4246 𝑥 0,015 10200 𝑥 100% = 0,624%
- Penerapan Metode Total Productive Maintenance untuk Mereduksi Downtime pada Lini Produksi Botol 1 di PT. Grahamas Intitirta (2020)Open sourceLost time: 91.4 hours · as reported: “downtime”
Show verbatim quote
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
- Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing (2025)Open sourceLost time: 156 menit · as reported: “Downtime Terencana”
Show verbatim quote
Rata - rata 2207238 2500000 5322 0,0030 156 470,75
- Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing (2025)Open sourceLost time: 471 menit · as reported: “Downtime Tidak Terencana”
Show verbatim quote
Rata - rata 2207238 2500000 5322 0,0030 156 470,75
- Enhancing Operational Efficiency in an Animal Feed Pelleting Line Using Preventive Maintenance and Standard Work (2025)Open sourceShare of lost time: 83.2 % · as reported: “production stoppages”
Show verbatim quote
A diagnostic analysis revealed that 83.2% of the lost productive time is associated with production stoppages, mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%).
- Lost time: 0 min · as reported: “Planned losses”
Show verbatim quote
Planned losses (min) 0 160 0 0 0 160 7
- Lost time: 278 min · as reported: “Operational losses”
Show verbatim quote
Operational losses (min) 278 494 106 53 157 1088 48
- Lost time: 420 min · as reported: “Equipment losses”
Show verbatim quote
Equipment losses (min) 420 364 24 55 152 1015 44.8
- Lost time: 698 min · as reported: “Total Losses”
Show verbatim quote
Total Losses(min) 698 1018 130 108 309 2263
- Share of lost time: 30.8 % · as reported: “Total Losses”
Show verbatim quote
% of Losses 30.8 45 5.8 4.8 13.7