Included study
Application of OEE Coefficient for Manufacturing Lines Reliability Improvement
1Bibliographic record
- Authors
- Arkadiusz Gola, Aleksander Nieoczym
- Year
- 2017
- Venue
- International Conference on Management Science and Management Innovation (MSMI)
- Country
- Poland
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 11 machines
- Observation period
- 28 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The focus of the analysis was a filling line for the production of high-proof alcoholic beverages.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table I, Week 1)Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023 | Equipment failure (breakdowns) | Mean event duration | 720 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 4)Availability coefficient kg, [%] 88,46 80,55 82,33 87,83 | none | Availability | 87.8 % | Both extractors agreed |
—Show verbatim quote (Table I, Week 1)Mean operating time between . failures Trm [s] 5520 4190 5354 7378 | Equipment failure (breakdowns) | Time between events | 5,520 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 4)Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023 | Equipment failure (breakdowns) | Mean event duration | 1,023 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 3)Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023 | Equipment failure (breakdowns) | Mean event duration | 1,150 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 2)Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023 | Equipment failure (breakdowns) | Mean event duration | 1,013 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 3)Mean operating time between . failures Trm [s] 5520 4190 5354 7378 | Equipment failure (breakdowns) | Time between events | 5,354 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 4)Mean operating time between . failures Trm [s] 5520 4190 5354 7378 | Equipment failure (breakdowns) | Time between events | 7,378 s | Both extractors agreed |
—Show verbatim quote (Table I, Week 2)Mean operating time between . failures Trm [s] 5520 4190 5354 7378 | Equipment failure (breakdowns) | Time between events | 4,190 s | Both extractors agreed |
downtime caused by the packaging machinepackaging machineShow verbatim quote (Section III)The downtime caused by the packaging machine during the four-week analysis was as long as 6 h 49 min which represented 25.43% of the overall downtime. | Not classifiable from the report | Share of lost time | 25.4 % | Adjudicated |
—Show verbatim quote (Table I, Week 1)Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17 | Equipment failure (breakdowns) | Share of lost time | 11.5 % | Single extractor |
—Show verbatim quote (Table I, Week 2)Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17 | Equipment failure (breakdowns) | Share of lost time | 19.5 % | Single extractor |
—Show verbatim quote (Table I, Week 3)Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17 | Equipment failure (breakdowns) | Share of lost time | 17.7 % | Single extractor |
—Show verbatim quote (Table I, Week 4)Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17 | Equipment failure (breakdowns) | Share of lost time | 12.2 % | Single extractor |
—Show verbatim quote (Table I, Week 1)Availability coefficient kg, [%] 88,46 80,55 82,33 87,83 | none | Availability | 88.5 % | Single extractor |
—Show verbatim quote (Table I, Week 2)Availability coefficient kg, [%] 88,46 80,55 82,33 87,83 | none | Availability | 80.6 % | Single extractor |
—Show verbatim quote (Table I, Week 3)Availability coefficient kg, [%] 88,46 80,55 82,33 87,83 | none | Availability | 82.3 % | Single extractor |
—Show verbatim quote (Table II, Week 1 Day 1)Day 1 82 59 60 83 | none | OEE | 82.0 % | Single extractor |
—Show verbatim quote (Table II, Week 2 Day 1)Day 1 82 59 60 83 | none | OEE | 59.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 1)Day 1 82 59 60 83 | none | OEE | 60.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 1)Day 1 82 59 60 83 | none | OEE | 83.0 % | Single extractor |
—Show verbatim quote (Table II, Week 2 Day 2)Day 2 82 51 71 81 | none | OEE | 51.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 2)Day 2 82 51 71 81 | none | OEE | 71.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 2)Day 2 82 51 71 81 | none | OEE | 81.0 % | Single extractor |
—Show verbatim quote (Table II, Week 1 Day 3)Day 3 84 62 64 77 | none | OEE | 84.0 % | Single extractor |
—Show verbatim quote (Table II, Week 2 Day 3)Day 3 84 62 64 77 | none | OEE | 62.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 3)Day 3 84 62 64 77 | none | OEE | 64.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 3)Day 3 84 62 64 77 | none | OEE | 77.0 % | Single extractor |
—Show verbatim quote (Table II, Week 2 Day 4)Day 4 71 66 48 92 | none | OEE | 66.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 4)Day 4 71 66 48 92 | none | OEE | 48.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 4)Day 4 71 66 48 92 | none | OEE | 92.0 % | Single extractor |
—Show verbatim quote (Table II, Week 1 Day 5)Day 5 76 67 70 79 | none | OEE | 76.0 % | Single extractor |
—Show verbatim quote (Table II, Week 2 Day 5)Day 5 76 67 70 79 | none | OEE | 67.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 5)Day 5 76 67 70 79 | none | OEE | 70.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 5)Day 5 76 67 70 79 | none | OEE | 79.0 % | Single extractor |
—Show verbatim quote (Table II, Week 1 Day 6)Day 6 65 60 49 68 | none | OEE | 65.0 % | Single extractor |
—Show verbatim quote (Table II, Week 3 Day 6)Day 6 65 60 49 68 | none | OEE | 49.0 % | Single extractor |
—Show verbatim quote (Table II, Week 4 Day 6)Day 6 65 60 49 68 | none | OEE | 68.0 % | Single extractor |
—Show verbatim quote (Table II, Week 1 Day 7)Day 7 72 71 70 77 | none | OEE | 72.0 % | Single extractor |
failures or adjustmentsShow verbatim quote (Section III)The total number of failures or adjustments of all machines was 117 h, of which 23.93% were failures or adjustments of the packaging machine. | Not classifiable from the report | Lost time | 117 h | Single extractor |
failures or adjustments of the packaging machinepackaging machineShow verbatim quote (Section III)The total number of failures or adjustments of all machines was 117 h, of which 23.93% were failures or adjustments of the packaging machine. | Not classifiable from the report | Share of lost time | 23.9 % | Single extractor |
adjustmentpackaging machineShow verbatim quote (Section III)During the four-week study, the largest number of events involved adjustment (23 events) and five were associated with a failure of the packaging machine. | Setup and adjustments | Number of events | 23.0 events | Single extractor |
—Show verbatim quote (Table I, Week 1)Line downtime coefficient kp, [%]: 11.54 | none | Share of planned time | 11.5 % | Single extractor |
—Show verbatim quote (Table I, Week 2)Line downtime coefficient kp, [%]: 19.45 | none | Share of planned time | 19.5 % | Single extractor |
—Show verbatim quote (Table I, Week 4)Line downtime coefficient kp, [%]: 12.17 | none | Share of planned time | 12.2 % | Single extractor |
—Show verbatim quote (Table I, Week 1)Failure intensity ω: 1.5 | Equipment failure (breakdowns) | Share of loss events | 1.50 events per week | Single extractor |
Observation units
- Filling line for alcoholic beverages · Whole line or unspecified equipment · Baseline
- Filling line · Whole line or unspecified equipment · Baseline