Application of OEE Coefficient for Manufacturing Lines Reliability Improvement

Open source

1Bibliographic record

Authors
Arkadiusz Gola, Aleksander Nieoczym
Year
2017
Venue
International Conference on Management Science and Management Innovation (MSMI)
Country
Poland
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 11 machines
Observation period
28 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The focus of the analysis was a filling line for the production of high-proof alcoholic beverages.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table I, Week 1)
Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023
Equipment failure (breakdowns)Mean event duration720 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 4)
Availability coefficient kg, [%] 88,46 80,55 82,33 87,83
noneAvailability87.8 %Both extractors agreed
—
Show verbatim quote (Table I, Week 1)
Mean operating time between . failures Trm [s] 5520 4190 5354 7378
Equipment failure (breakdowns)Time between events5,520 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 4)
Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023
Equipment failure (breakdowns)Mean event duration1,023 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 3)
Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023
Equipment failure (breakdowns)Mean event duration1,150 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 2)
Mean stop time of a line due to failures Tpm [s] 720 1013 1150 1023
Equipment failure (breakdowns)Mean event duration1,013 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 3)
Mean operating time between . failures Trm [s] 5520 4190 5354 7378
Equipment failure (breakdowns)Time between events5,354 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 4)
Mean operating time between . failures Trm [s] 5520 4190 5354 7378
Equipment failure (breakdowns)Time between events7,378 sBoth extractors agreed
—
Show verbatim quote (Table I, Week 2)
Mean operating time between . failures Trm [s] 5520 4190 5354 7378
Equipment failure (breakdowns)Time between events4,190 sBoth extractors agreed
downtime caused by the packaging machinepackaging machine
Show verbatim quote (Section III)
The downtime caused by the packaging machine during the four-week analysis was as long as 6 h 49 min which represented 25.43% of the overall downtime.
Not classifiable from the reportShare of lost time25.4 %Adjudicated
—
Show verbatim quote (Table I, Week 1)
Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17
Equipment failure (breakdowns)Share of lost time11.5 %Single extractor
—
Show verbatim quote (Table I, Week 2)
Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17
Equipment failure (breakdowns)Share of lost time19.5 %Single extractor
—
Show verbatim quote (Table I, Week 3)
Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17
Equipment failure (breakdowns)Share of lost time17.7 %Single extractor
—
Show verbatim quote (Table I, Week 4)
Line downtime coefficient kp, [%] 11,54 19,45 17,67 12,17
Equipment failure (breakdowns)Share of lost time12.2 %Single extractor
—
Show verbatim quote (Table I, Week 1)
Availability coefficient kg, [%] 88,46 80,55 82,33 87,83
noneAvailability88.5 %Single extractor
—
Show verbatim quote (Table I, Week 2)
Availability coefficient kg, [%] 88,46 80,55 82,33 87,83
noneAvailability80.6 %Single extractor
—
Show verbatim quote (Table I, Week 3)
Availability coefficient kg, [%] 88,46 80,55 82,33 87,83
noneAvailability82.3 %Single extractor
—
Show verbatim quote (Table II, Week 1 Day 1)
Day 1 82 59 60 83
noneOEE82.0 %Single extractor
—
Show verbatim quote (Table II, Week 2 Day 1)
Day 1 82 59 60 83
noneOEE59.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 1)
Day 1 82 59 60 83
noneOEE60.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 1)
Day 1 82 59 60 83
noneOEE83.0 %Single extractor
—
Show verbatim quote (Table II, Week 2 Day 2)
Day 2 82 51 71 81
noneOEE51.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 2)
Day 2 82 51 71 81
noneOEE71.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 2)
Day 2 82 51 71 81
noneOEE81.0 %Single extractor
—
Show verbatim quote (Table II, Week 1 Day 3)
Day 3 84 62 64 77
noneOEE84.0 %Single extractor
—
Show verbatim quote (Table II, Week 2 Day 3)
Day 3 84 62 64 77
noneOEE62.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 3)
Day 3 84 62 64 77
noneOEE64.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 3)
Day 3 84 62 64 77
noneOEE77.0 %Single extractor
—
Show verbatim quote (Table II, Week 2 Day 4)
Day 4 71 66 48 92
noneOEE66.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 4)
Day 4 71 66 48 92
noneOEE48.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 4)
Day 4 71 66 48 92
noneOEE92.0 %Single extractor
—
Show verbatim quote (Table II, Week 1 Day 5)
Day 5 76 67 70 79
noneOEE76.0 %Single extractor
—
Show verbatim quote (Table II, Week 2 Day 5)
Day 5 76 67 70 79
noneOEE67.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 5)
Day 5 76 67 70 79
noneOEE70.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 5)
Day 5 76 67 70 79
noneOEE79.0 %Single extractor
—
Show verbatim quote (Table II, Week 1 Day 6)
Day 6 65 60 49 68
noneOEE65.0 %Single extractor
—
Show verbatim quote (Table II, Week 3 Day 6)
Day 6 65 60 49 68
noneOEE49.0 %Single extractor
—
Show verbatim quote (Table II, Week 4 Day 6)
Day 6 65 60 49 68
noneOEE68.0 %Single extractor
—
Show verbatim quote (Table II, Week 1 Day 7)
Day 7 72 71 70 77
noneOEE72.0 %Single extractor
failures or adjustments
Show verbatim quote (Section III)
The total number of failures or adjustments of all machines was 117 h, of which 23.93% were failures or adjustments of the packaging machine.
Not classifiable from the reportLost time117 hSingle extractor
failures or adjustments of the packaging machinepackaging machine
Show verbatim quote (Section III)
The total number of failures or adjustments of all machines was 117 h, of which 23.93% were failures or adjustments of the packaging machine.
Not classifiable from the reportShare of lost time23.9 %Single extractor
adjustmentpackaging machine
Show verbatim quote (Section III)
During the four-week study, the largest number of events involved adjustment (23 events) and five were associated with a failure of the packaging machine.
Setup and adjustmentsNumber of events23.0 eventsSingle extractor
—
Show verbatim quote (Table I, Week 1)
Line downtime coefficient kp, [%]: 11.54
noneShare of planned time11.5 %Single extractor
—
Show verbatim quote (Table I, Week 2)
Line downtime coefficient kp, [%]: 19.45
noneShare of planned time19.5 %Single extractor
—
Show verbatim quote (Table I, Week 4)
Line downtime coefficient kp, [%]: 12.17
noneShare of planned time12.2 %Single extractor
—
Show verbatim quote (Table I, Week 1)
Failure intensity ω: 1.5
Equipment failure (breakdowns)Share of loss events1.50 events per weekSingle extractor

Observation units

  • Filling line for alcoholic beverages · Whole line or unspecified equipment · Baseline