Included study
Analisis Total Productive Maintenance Mesin Wrapping Line 4 Menggunkan Overall Equipment Effectiveness dan Six Big Losses di PT XY, Cirebon - Jawa Barat
1Bibliographic record
- Authors
- Ayu Anggraeni Sibarani, Katon Muhammad, April Yanti
- Year
- 2020
- Venue
- Jurnal Rekayasa Sistem & Industri (JRSI)
- Country
- Indonesia
- Segment
- Bakery and pasta
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Mesin yang sering mengalami breakdown tersebut adalah mesin Wrapping Line 4 yang merupakan mesin pengemasan untuk produk cup noodle.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 15Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Wrapping Line 4Show verbatim quote (Kesimpulan / Table 3)Nilai rata-rata OEE pada mesin Wrapping Line 4, yaitu 78,03%, dengan nilai availability sebesar 98,62%, performance efiiciency sebesar 83,17%, serta rate of quality sebesar 95,13%. | none | Quality | 95.1 % | Both extractors agreed |
—Wrapping Line 4Show verbatim quote (Kesimpulan / Table 2)Nilai rata-rata OEE pada mesin Wrapping Line 4, yaitu 78,03%, dengan nilai availability sebesar 98,62%, performance efiiciency sebesar 83,17%, serta rate of quality sebesar 95,13%. | none | Performance | 83.2 % | Both extractors agreed |
—Wrapping Line 4Show verbatim quote (Kesimpulan / Table 1)Nilai rata-rata OEE pada mesin Wrapping Line 4, yaitu 78,03%, dengan nilai availability sebesar 98,62%, performance efiiciency sebesar 83,17%, serta rate of quality sebesar 95,13%. | none | Availability | 98.6 % | Both extractors agreed |
Setup and Adjustment LossesWrapping Line 4Show verbatim quote (Table 5)Setup and Adjustment Losses 0% 0% 100% | Setup and adjustments | Share of lost time | 0 % | Both extractors agreed |
Breakdown LossesWrapping Line 4Show verbatim quote (Table 5)Breakdown Losses 1,38% 0,35% 100% | Equipment failure (breakdowns) | Share of lost time | 0.350 % | Both extractors agreed |
Scrap LossesWrapping Line 4Show verbatim quote (Table 5)Scrap Losses 14,86% 3,81% 99,6% | Process defects (scrap and rework) | Share of lost time | 3.81 % | Adjudicated |
Idling and Minor Stoppages LossesWrapping Line 4Show verbatim quote (Table 5)Idling and Minor Stoppages Losses 28,94% 7,42% 95,8% | Idling and minor stops (micro-stops) | Share of lost time | 7.42 % | Both extractors agreed |
Quality Defect/ReworkWrapping Line 4Show verbatim quote (Table 5)Quality Defect/Rework 247,72% 63,54% 63,5% | Process defects (scrap and rework) | Share of lost time | 63.5 % | Both extractors agreed |
Speed LossesWrapping Line 4Show verbatim quote (Table 5)Speed Losses 96,94% 24,87% 88,4% | Reduced speed | Share of lost time | 24.9 % | Both extractors agreed |
—Wrapping Line 4Show verbatim quote (Kesimpulan / Table 4)Nilai rata-rata OEE pada mesin Wrapping Line 4, yaitu 78,03%, dengan nilai availability sebesar 98,62%, performance efiiciency sebesar 83,17%, serta rate of quality sebesar 95,13%. | none | OEE | 78.0 % | Single extractor |
Observation units
- Wrapping Line 4 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline