Idling and minor stoppages
In short
It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 55 % of the line's lost time. Reported by 7 of the 127 studies that could observe it (good evidence).
What happens
Short interruptions arise from routine operating disturbances such as jams, misfeeds, blocked sensors, fallen or misaligned containers, and starvation or blocking caused by adjacent equipment on the line. These events are resolved by the operator with a quick manual intervention such as clearing, resetting or re-aligning, without requiring maintenance or spare parts.
What is done about it
Apply autonomous maintenance and quick-clearance procedures, improve sensor reliability and guarding to reduce false trips, and balance line speeds and buffer capacities to limit starvation and blocking between stations. Track and analyze minor-stop frequency by location to target recurring sources for design or procedural fixes.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.9% [0.6–4.1%]
- Expected share of lost time
- 1.0% [0.3–2.2%]
- Share of lost time when present
- 55% [45–64%]
- Studies / units
- 127 / 161
- Evidence grade
- B
Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.
2Probability by segment
- Dairy products3.6% [0.7–10.0%]13 studies
- Soft drinks, bottled water and juices1.5% [0.3–4.1%]26 studies
- Brewing, wine and spirits1.9% [0.3–5.9%]11 studies
- Bakery and pasta2.1% [0.4–5.6%]24 studies
- Meat, poultry and seafood1.9% [0.3–6.1%]9 studies
- Fruit and vegetable processing4.0% [0.8–12.4%]7 studies
- Grain and oilseed milling2.0% [0.3–6.1%]6 studies
- Sugar and confectionery2.0% [0.3–6.2%]9 studies
- Snacks, coffee, tea and other foods2.0% [0.3–6.0%]5 studies
- Animal feed and pet food2.0% [0.3–6.1%]7 studies
- Food manufacturing (unspecified or mixed)2.9% [0.5–8.7%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceShort interruptions arise from routine operating disturbances such as jams, misfeeds, blocked sensors, fallen or misaligned containers, and starvation or blocking caused by adjacent equipment on the line. These events are resolved by the operator with a quick manual intervention such as clearing, resetting or re-aligning, without requiring maintenance or spare parts.
How it looks in SCADA data
Engineering guidanceAppears as a high count of short machine-state transitions to stopped or fault states with durations below the minor-stop threshold, often recurring across shifts without an associated maintenance work order. Upstream or downstream machines may show brief starved or blocked states correlated in time with the event.
Countermeasure
Engineering guidanceApply autonomous maintenance and quick-clearance procedures, improve sensor reliability and guarding to reduce false trips, and balance line speeds and buffer capacities to limit starvation and blocking between stations. Track and analyze minor-stop frequency by location to target recurring sources for design or procedural fixes.
4Sources
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT XYZ Menggunakan Metode Overall Equipment Effectiveness (2019)Open sourceShare of planned time: 30.7 % · as reported: “Idle & Minor Stoppages Losses”
Show verbatim quote
Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT XYZ Menggunakan Metode Overall Equipment Effectiveness (2019)Open sourceShare of lost time: 76.3 % · as reported: “Idle & Minor Stoppages Losses”
Show verbatim quote
Dapat dilihat di grafik bahwa nilai losses terbesar ada pada idle & minor stoppages losses dan setup & adjustment losses yang mewakili 76,34% dan 23,08% dari total losses perusahaan, hal ini tentu saja harus diperbaiki.
- Investigation on a multiscale sustainable manufacturing approach to production changeover complexity reduction and its implementation through smart surfaces and process optimization (2022)Open sourceLost time: 2.00 min · as reported: “TNA Issues”
Show verbatim quote
TNA Issues 2 0 2
- Application of the Concept of Total Productive Maintenance in Automatic Bottle Filling Machines (2019)Open sourceShare of lost time: 0.320 % · as reported: “Idling and Minor Stoppages”
Show verbatim quote
Idling and Minor Stoppages 105,00 0,32 4
- Application of the Concept of Total Productive Maintenance in Automatic Bottle Filling Machines (2019)Open sourceLost time: 105 min · as reported: “Idling and Minor Stoppages”
Show verbatim quote
Idling and Minor Stoppages 105,00 0,32 4
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT. Suryajaya Abadiperkasa Menggunakan Metode Overall Equipment Effectiveness (2020)Open sourceShare of lost time: 30.7 % · as reported: “Idle & Minor Stoppages Losses”
Show verbatim quote
Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
- Analisis Efektivitas Mesin pada Divisi Pengalengan Jamur Di PT. Suryajaya Abadiperkasa Menggunakan Metode Overall Equipment Effectiveness (2020)Open sourceShare of lost time: 76.3 % · as reported: “Idle & Minor Stoppages Losses”
Show verbatim quote
nilai losses terbesar ada pada idle & minor stoppages losses dan setup & adjustment losses yang mewakili 76,34% dan 23,08% dari total losses perusahaan
- Pengukuran Efektivitas Produksi Menggunakan Overall Throughput Effectiveness (ote) Pada Line Produksi Produk X Di Pt Xyz (2020)Open sourceShare of planned time: 49.0 % · as reported: “idling and minor stoppages losses”
Show verbatim quote
Pada mesin E dengan nilai efektivitas mesin terendah diketahui pada perhitungan six big losses terdapat dua losses yang paling dominan yaitu pada idling and minor stoppages losses dan reduced speed losses dengan nilai dari masing – masing losses adalah 48,95% dan 33,55%.
- Pengukuran Efektivitas Produksi Menggunakan Overall Throughput Effectiveness (ote) Pada Line Produksi Produk X Di Pt Xyz (2020)Open sourceShare of lost time: 49.0 % · as reported: “idling and minor stoppages losses”
Show verbatim quote
pada perhitungan six big losses terdapat dua losses yang paling dominan yaitu pada idling and minor stoppages losses dan reduced speed losses dengan nilai dari masing – masing losses adalah 48,95% dan 33,55%
- Analisis Total Productive Maintenance Mesin Wrapping Line 4 Menggunkan Overall Equipment Effectiveness dan Six Big Losses di PT XY, Cirebon - Jawa Barat (2020)Open sourceShare of lost time: 7.42 % · as reported: “Idling and Minor Stoppages Losses”
Show verbatim quote
Idling and Minor Stoppages Losses 28,94% 7,42% 95,8%
- Lost time: 235 min · as reported: “Lecithin Issues”
Show verbatim quote
235 Lecithin Issues
- Peningkatan Overall Equipment Effectiveness (OEE) dengan Pendekatan Total Productive Maintenance (TPM) di Line X PT Kraft Ultrajaya Indonesia (2023)Open sourceShare of lost time: 8.00 % · as reported: “Idling and Minor Stoppage”
Show verbatim quote
the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%.
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 75.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 51.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 50.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 61.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 22.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 49.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 66.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 38.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 62.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 13.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 44.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Reduction of Machine Breakdown in the Brewery Manufacturing Company, A Case Study of Brewery “A” in the Eastern Nigeria (2023)Open sourceLost time: 17.0 min · as reported: “Others (jam, trip, dirt carryover etc)”
Show verbatim quote
Others (jam, trip, dirt carryover etc) 50 44 13 51 62 38 66 75 49 22 61 17
- Share of lost time: 6.08 % · as reported: “Minor Stoppage”
Show verbatim quote
Minor Stoppage 6.08% 3.95% 11.65%
- Share of lost time: 11.7 % · as reported: “Minor Stoppage”
Show verbatim quote
Minor Stoppage 6.08% 3.95% 11.65%
- Analisis Overall Equipment Effectiveness untuk Meningkatkan Efektivitas Mesin Filling Multiline pada PT-XYZ (2023)Open sourceLost time: 1.58 jam · as reported: “Idling and Minor Stoppages Losses”
Show verbatim quote
Idling and Minor Stoppages Losses 1,58 50,51 100,00%
- Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri (2023)Open sourceShare of planned time: 16.9 % · as reported: “Idling stop and minor stoppages”
Show verbatim quote
1 Idling stop and minor stoppages 16,85 53,58 53,58
- Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri (2023)Open sourceShare of lost time: 53.6 % · as reported: “Idling stop and minor stoppages”
Show verbatim quote
1 Idling stop and minor stoppages 16,85 53,58 53,58
- ANALISA PERFORMANCE THRESER DI PABRIK KELAPA SAWIT (PKS) PTPN V SEI GARO DENGAN METODE OVERALL EQUIPMENT EFFECTIVINESS (OEE) DAN 5S (2023)Open sourceShare of lost time: 1.00 % · as reported: “Idling and Minor Stoppage Losses”
Show verbatim quote
Faktor yang memiliki persentase terbesar dari faktor six big losses pada mesin thresher adalah Idling and Minor Stoppage Losses sebesar 1% dan Equipment Failure Losses sebesar 0,37%.
- Share of planned time: 2.35 % · as reported: “Idling minor stoppage losses”
Show verbatim quote
𝐼𝑑𝑙𝑖𝑛𝑔 𝑚𝑖𝑛𝑜𝑟 𝑠𝑡𝑜𝑝𝑎𝑔𝑒 𝑙𝑜𝑠𝑠𝑒𝑠= 2,353 %
- Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ (2025)Open sourceLost time: 0 Minutes · as reported: “Idling and Minor Stopages Losses”
Show verbatim quote
Idling and Minor Stopages Losses 0 40.410 0% 100%
- Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ (2025)Open sourceShare of lost time: 0 % · as reported: “Idling and Minor Stopages Losses”
Show verbatim quote
Idling and Minor Stopages Losses 0 40.410 0% 100%
- Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Packaging Makanan di PT XYZ (2026)Open sourceLost time: 49.2 Jam · as reported: “Idling and Minor Stoppages”
Show verbatim quote
Kegagalan karena Idling and Minor Stoppages 49,21 18,64 Tinggi
- Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Packaging Makanan di PT XYZ (2026)Open sourceShare of lost time: 18.6 % · as reported: “Idling and Minor Stoppages”
Show verbatim quote
diketahui bahwa faktor kegagalan berasal dari Breakdown Losses sebesar 31,45%, Reduced Speed Losses sebesar 24,73%, dan Idling and Minor Stoppages sebesar 18,64%.