Increased equipment performance in agro-industrial companies through a maintenance model based on the TPM approach
1Bibliographic record
- Authors
- Renzo Alfredo Condo Palomino, Leandro Raul Cruz Barreto, Juan Carlos Quiroz
- Year
- 2022
- Venue
- LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI)
- Country
- Peru
- Segment
- Meat, poultry and seafood
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
El presente estudio tiene como desarrollo la mejora continua a través de herramientas planteadas y propuestas que se realizaran en una empresa pyme de conservas de pollo con el objetivo de tener resultados en un escenario real.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table II)Calidad 88.25% 94.27% | none | Quality | 88.3 % | Both extractors agreed |
—Show verbatim quote (Table II)Rendimiento 77.11% 89.44% | none | Performance | 77.1 % | Both extractors agreed |
—Show verbatim quote (Table II)Disponibilidad 95.02% 94.51% | none | Availability | 95.0 % | Both extractors agreed |
—Show verbatim quote (Table II)OEE Sistema 64.66% 79.69% | none | OEE | 64.7 % | Both extractors agreed |
—cerradoraShow verbatim quote (Section III.3.b SMED)la velocidad es de 15 latas por minuto y sólo llega a 9.76 latas por minuto | none | Throughput | 9.76 latas/minuto | Both extractors agreed |
—cerradoraShow verbatim quote (Table II)Calidad 91.53% 97.37% | none | Quality | 91.5 % | Both extractors agreed |
—cerradoraShow verbatim quote (Table II)Rendimiento 65.07% 91.67% | none | Performance | 65.1 % | Both extractors agreed |
—cerradoraShow verbatim quote (Table II)Disponibilidad 81.32% 97.85% | none | Availability | 81.3 % | Both extractors agreed |
—cerradoraShow verbatim quote (Table II)OEE de Cerradora 48.43% 87.34% | none | OEE | 48.4 % | Both extractors agreed |
mantenimiento correctivo (MTTR general)Show verbatim quote (Table II)MTTR General 2.5 h 2.61 h | Equipment failure (breakdowns) | Mean event duration | 2.50 h | Both extractors agreed |
mantenimiento correctivo (MTBF general)Show verbatim quote (Table II)MTBF General 12.71 h 27.81 h | Equipment failure (breakdowns) | Time between events | 12.7 h | Both extractors agreed |
mantenimiento correctivo (MC)cerradoraShow verbatim quote (Section IV Validación)La frecuencia de MC es de 122 para el proceso actual y 61 para el proceso propuesto. | Equipment failure (breakdowns) | Number of events | 122 events | Both extractors agreed |
mantenimiento correctivo (MTTR)cerradoraShow verbatim quote (Table II)MTTR Cerradora 2.72 h 3.75 h | Equipment failure (breakdowns) | Mean event duration | 2.72 h | Both extractors agreed |
mantenimiento correctivo (MTBF)cerradoraShow verbatim quote (Table II)MTBF Cerradora 21.43 h 94.06 h | Equipment failure (breakdowns) | Time between events | 21.4 h | Both extractors agreed |
productos no conformes (PNC) de la máquina cerradoracerradoraShow verbatim quote (Section IV Validación)para la identificación de la máquina que realiza mayor cantidad de PNC es la máquina cerradora equivalente al 7.56% estando encima del margen establecido por la empresa de un 3% | Process defects (scrap and rework) | Defect rate | 7.56 % | Single extractor |
mantenimientos correctivos (mandril defectuoso y desconfiguración)cerradoraShow verbatim quote (Section V Conclusiones)teniendo varios mantenimientos correctivos con un total de 220.38 horas, donde el programa es de 12h/año | Equipment failure (breakdowns) | Lost time | 220 h | Single extractor |
proceso de ejecución de mantenimiento correctivocerradoraShow verbatim quote (Section III.3.a Estandarización de trabajo)Teniendo un total de 11.15 horas en el proceso de ejecución para la máquina cerradora. | Equipment failure (breakdowns) | Mean event duration | 11.2 h | Single extractor |
proceso completo de gestión de mantenimiento correctivocerradoraShow verbatim quote (Section III.3.a Estandarización de trabajo)la recepción de requerimientos de MC, diagnóstico, elaboración de informa, compras, pruebas de equipos y entrega de equipos de 12.21 horas a 4.66 horas | Equipment failure (breakdowns) | Mean event duration | 12.2 h | Single extractor |
productos no conformes (PNC)Show verbatim quote (Section IV Validación)se cuenta con una línea de producción donde se obtuvo 98746 latas como productos no conformes teniendo en un índice de 11.75% de la producción planeada comparado con el margen establecido mundial | Process defects (scrap and rework) | Defect rate | 11.8 % | Single extractor |
—Show verbatim quote (Table II (TABLA II), page 8)MTBF General 27.81 h | Equipment failure (breakdowns) | Time between events | 27.8 h | Single extractor |
—CerradoraShow verbatim quote (Page 5-6)el tiempo de MC es de 12.21 horas | Equipment failure (breakdowns) | Lost time | 12.2 h | Single extractor |
—CerradoraShow verbatim quote (Table II (TABLA II), page 8)OEE de Cerradora 87.34% | none | OEE | 87.3 % | Single extractor |
—CerradoraShow verbatim quote (Table II (TABLA II), page 8)MTTR Cerradora 3.75 h | Equipment failure (breakdowns) | Mean event duration | 3.75 h | Single extractor |
—CerradoraShow verbatim quote (Page 5-6)después de la mejora el tiempo de 4.66 horas | Equipment failure (breakdowns) | Lost time | 4.66 h | Single extractor |
—CerradoraShow verbatim quote (Page 5)se incrementa la velocidad a 13.75 latas/minuto | none | Throughput | 13.8 cans/min | Single extractor |
Observation units
- Sistema (línea de producción) · Whole line or unspecified equipment · Baseline
- Cerradora (seamer) · Capping and seaming · Baseline
- Production line (system) · Whole line or unspecified equipment · After intervention
- Cerradora (sealing machine) · Capping and seaming · Baseline
- Cerradora (sealing machine) · Capping and seaming · After intervention