Included study
Peningkatan Overall Equipment Effectiveness (OEE) dengan Pendekatan Total Productive Maintenance (TPM) di Line X PT Kraft Ultrajaya Indonesia
1Bibliographic record
- Authors
- Faizal Agni Akbar, Aviasti
- Year
- 2023
- Venue
- Bandung Conference Series Industrial Engineering Science
- Country
- Indonesia
- Segment
- Dairy products
- Process family
- Whole plant or unspecified
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
PT Kraft Ultrajaya Indonesia is a manufacturing company specializing in cheese processing.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Abstract)increase OEE from 83% to 86%. | none | OEE | 86.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)Quality ratio from 95% to 96% | none | Quality | 96.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)The implementation of CIL and OPL to increase the Performance value from 92% to 95% | none | Performance | 95.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)Quality ratio from 95% to 96% | none | Quality | 95.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)The implementation of CIL and OPL to increase the Performance value from 92% to 95% | none | Performance | 92.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)line X has an average value of Overall Equipment Effectiveness (OEE) of 83%. | none | OEE | 83.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)Based on data for November 2021, Line X has a high downtime of 4,840 minutes. | Not classifiable from the report | Lost time | 4,840 min | Both extractors agreed |
Idling and Minor StoppageShow verbatim quote (Abstract)the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%. | Idling and minor stops (micro-stops) | Share of lost time | 8.00 % | Single extractor |
Setup and AdjustmentShow verbatim quote (Abstract)the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%. | Setup and adjustments | Share of lost time | 5.00 % | Single extractor |
Defect AmountShow verbatim quote (Abstract)the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%. | Process defects (scrap and rework) | Share of lost time | 4.00 % | Single extractor |
—Show verbatim quote (abstract)Idling and Minor Stoppage with a percentage of 8% | Idling and minor stops (micro-stops) | Share of planned time | 8.00 % | Single extractor |
—Show verbatim quote (abstract)Setup and Adjustment with a percentage of 5% | Setup and adjustments | Share of planned time | 5.00 % | Single extractor |
—Show verbatim quote (abstract)Defect Amount with a percentage of 4% | Process defects (scrap and rework) | Share of planned time | 4.00 % | Single extractor |
Observation units
- Line X · Whole line or unspecified equipment · After intervention
- Line X · Whole line or unspecified equipment · Baseline