Peningkatan Overall Equipment Effectiveness (OEE) dengan Pendekatan Total Productive Maintenance (TPM) di Line X PT Kraft Ultrajaya Indonesia

Open source

1Bibliographic record

Authors
Faizal Agni Akbar, Aviasti
Year
2023
Venue
Bandung Conference Series Industrial Engineering Science
Country
Indonesia
Segment
Dairy products
Process family
Whole plant or unspecified
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
PT Kraft Ultrajaya Indonesia is a manufacturing company specializing in cheese processing.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Abstract)
increase OEE from 83% to 86%.
noneOEE86.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
Quality ratio from 95% to 96%
noneQuality96.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
The implementation of CIL and OPL to increase the Performance value from 92% to 95%
nonePerformance95.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
Quality ratio from 95% to 96%
noneQuality95.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
The implementation of CIL and OPL to increase the Performance value from 92% to 95%
nonePerformance92.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
line X has an average value of Overall Equipment Effectiveness (OEE) of 83%.
noneOEE83.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
Based on data for November 2021, Line X has a high downtime of 4,840 minutes.
Not classifiable from the reportLost time4,840 minBoth extractors agreed
Idling and Minor Stoppage
Show verbatim quote (Abstract)
the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%.
Idling and minor stops (micro-stops)Share of lost time8.00 %Single extractor
Setup and Adjustment
Show verbatim quote (Abstract)
the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%.
Setup and adjustmentsShare of lost time5.00 %Single extractor
Defect Amount
Show verbatim quote (Abstract)
the loss factors that affect the OEE line X value are Idling and Minor Stoppage with a percentage of 8%, Setup and Adjustment with a percentage of 5%, Defect Amount with a percentage of 4%.
Process defects (scrap and rework)Share of lost time4.00 %Single extractor
—
Show verbatim quote (abstract)
Idling and Minor Stoppage with a percentage of 8%
Idling and minor stops (micro-stops)Share of planned time8.00 %Single extractor
—
Show verbatim quote (abstract)
Setup and Adjustment with a percentage of 5%
Setup and adjustmentsShare of planned time5.00 %Single extractor
—
Show verbatim quote (abstract)
Defect Amount with a percentage of 4%
Process defects (scrap and rework)Share of planned time4.00 %Single extractor

Observation units

  • Line X · Whole line or unspecified equipment · After intervention
  • Line X · Whole line or unspecified equipment · Baseline