Losses analysis of nuggets production on the forming line machine at PT XYZ

Open source

1Bibliographic record

Authors
Nita Kuswardhani, Bambang Herry Purnomo, Nanda Sintya Fitri Salsabila
Year
2024
Venue
AIP conference proceedings
Country
—
Segment
Meat, poultry and seafood
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Abstract only
Size
1 plants · 1 lines · 1 machines
Observation period
365 days
Data collection
not_reported
Intervention
Show the setting as described by the study
The nugget production process in the forming line uses a semi automation machine that runs continuously.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
reduced speed lossesforming line machine
Show verbatim quote (Abstract)
the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
Reduced speedShare of lost time23.8 %Both extractors agreed
yield lossesforming line machine
Show verbatim quote (Abstract)
the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
Start-up losses (reduced yield)Share of lost time24.4 %Both extractors agreed
idling & minor stoppages lossesforming line machine
Show verbatim quote (Abstract)
the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
Idling and minor stops (micro-stops)Share of lost time24.6 %Both extractors agreed

Observation units

  • Forming line · Forming, moulding and depositing · Baseline