Reduced speed operation of forming equipment

Reduced speedPerformanceForming, moulding and depositing

In short

It appears in about 2 of every 100 lines studied.

When it appears, it takes on average about 63 % of the line's lost time. Reported by 4 of the 76 studies that could observe it (limited evidence).

What happens

The forming machine (press, blow-moulder, or forming line) runs below its ideal design rate because of deliberate slow-running, degraded mechanical or pneumatic performance, mould or tooling wear, or constraints imposed by upstream or downstream equipment and material properties. The cumulative gap between actual and ideal cycle time over the run constitutes the loss, even though the machine never fully stops.

What is done about it

Perform root cause analysis of the speed gap, including mould or tooling condition, servo or pneumatic drive performance, mechanical wear and material feed consistency, and restore or upgrade the limiting component. Validate performance against the rated speed curve and track the cycle time trend to detect recurring drift.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
2.1% [0.6–5.0%]
Expected share of lost time
1.3% [0.4–3.2%]
Share of lost time when present
63% [51–75%]
Studies / units
76 / 96
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    2.4% [0.3–7.8%]5 studies
  • Soft drinks, bottled water and juices
    2.9% [0.5–8.7%]11 studies
  • Brewing, wine and spirits
    2.5% [0.3–8.6%]0 studies
  • Bakery and pasta
    2.3% [0.4–6.1%]25 studies
  • Meat, poultry and seafood
    3.6% [0.5–12.2%]3 studies
  • Fruit and vegetable processing
    2.4% [0.3–8.3%]3 studies
  • Grain and oilseed milling
    2.6% [0.3–8.9%]0 studies
  • Sugar and confectionery
    2.1% [0.3–6.3%]8 studies
  • Snacks, coffee, tea and other foods
    2.2% [0.3–7.2%]7 studies
  • Animal feed and pet food
    3.2% [0.5–10.0%]6 studies
  • Food manufacturing (unspecified or mixed)
    2.3% [0.3–7.1%]8 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The forming machine (press, blow-moulder, or forming line) runs below its ideal design rate because of deliberate slow-running, degraded mechanical or pneumatic performance, mould or tooling wear, or constraints imposed by upstream or downstream equipment and material properties. The cumulative gap between actual and ideal cycle time over the run constitutes the loss, even though the machine never fully stops.

How it looks in SCADA data

Engineering guidance

MES or SCADA shows the machine continuously in a running state but with actual cycle time, stroke rate or output counter increments persistently above the standard or ideal cycle time, without stop events being logged. Speed setpoint versus actual speed trends diverge, and the OEE performance factor drops while availability remains high.

Countermeasure

Engineering guidance

Perform root cause analysis of the speed gap, including mould or tooling condition, servo or pneumatic drive performance, mechanical wear and material feed consistency, and restore or upgrade the limiting component. Validate performance against the rated speed curve and track the cycle time trend to detect recurring drift.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 85.4 % · as reported: “Reduced speed losses”
    Show verbatim quote
    faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40%
  2. Lost time: 283 jam · as reported: “Reduced speed losses”
    Show verbatim quote
    faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40%
  3. Share of lost time: 22.8 % · as reported: “Time lost to produce QC rejections”
    Show verbatim quote
    Time lost to produce QC rejections 19.16% 24.26% 25.135 22.84%
  4. Share of lost time: 26.2 % · as reported: “Speed loss”
    Show verbatim quote
    Speed loss 21.55% 29.65% 27.50% 26.23%
  5. Share of lost time: 11.8 % · as reported: “High FG”
    Show verbatim quote
    High FG 35.53% 0% 0% 11.84%
  6. Share of lost time: 23.8 % · as reported: “reduced speed losses”
    Show verbatim quote
    the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
  7. Share of lost time: 13.5 % · as reported: “Reduce Speed”
    Show verbatim quote
    The Six Big Losses analysis identified the two most dominant major losses, namely idle minor stoppage of 29.82% and reduce speed of 13.53%.
  8. Share of lost time: 0 % · as reported: “Reduce Speed Losses”