Reduced speed operation of forming equipment
In short
It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 63 % of the line's lost time. Reported by 4 of the 76 studies that could observe it (limited evidence).
What happens
The forming machine (press, blow-moulder, or forming line) runs below its ideal design rate because of deliberate slow-running, degraded mechanical or pneumatic performance, mould or tooling wear, or constraints imposed by upstream or downstream equipment and material properties. The cumulative gap between actual and ideal cycle time over the run constitutes the loss, even though the machine never fully stops.
What is done about it
Perform root cause analysis of the speed gap, including mould or tooling condition, servo or pneumatic drive performance, mechanical wear and material feed consistency, and restore or upgrade the limiting component. Validate performance against the rated speed curve and track the cycle time trend to detect recurring drift.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 2.1% [0.6–5.0%]
- Expected share of lost time
- 1.3% [0.4–3.2%]
- Share of lost time when present
- 63% [51–75%]
- Studies / units
- 76 / 96
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products2.4% [0.3–7.8%]5 studies
- Soft drinks, bottled water and juices2.9% [0.5–8.7%]11 studies
- Brewing, wine and spirits2.5% [0.3–8.6%]0 studies
- Bakery and pasta2.3% [0.4–6.1%]25 studies
- Meat, poultry and seafood3.6% [0.5–12.2%]3 studies
- Fruit and vegetable processing2.4% [0.3–8.3%]3 studies
- Grain and oilseed milling2.6% [0.3–8.9%]0 studies
- Sugar and confectionery2.1% [0.3–6.3%]8 studies
- Snacks, coffee, tea and other foods2.2% [0.3–7.2%]7 studies
- Animal feed and pet food3.2% [0.5–10.0%]6 studies
- Food manufacturing (unspecified or mixed)2.3% [0.3–7.1%]8 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe forming machine (press, blow-moulder, or forming line) runs below its ideal design rate because of deliberate slow-running, degraded mechanical or pneumatic performance, mould or tooling wear, or constraints imposed by upstream or downstream equipment and material properties. The cumulative gap between actual and ideal cycle time over the run constitutes the loss, even though the machine never fully stops.
How it looks in SCADA data
Engineering guidanceMES or SCADA shows the machine continuously in a running state but with actual cycle time, stroke rate or output counter increments persistently above the standard or ideal cycle time, without stop events being logged. Speed setpoint versus actual speed trends diverge, and the OEE performance factor drops while availability remains high.
Countermeasure
Engineering guidancePerform root cause analysis of the speed gap, including mould or tooling condition, servo or pneumatic drive performance, mechanical wear and material feed consistency, and restore or upgrade the limiting component. Validate performance against the rated speed curve and track the cycle time trend to detect recurring drift.
4Sources
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceShare of lost time: 85.4 % · as reported: “Reduced speed losses”
Show verbatim quote
faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40%
- ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG (2017)Open sourceLost time: 283 jam · as reported: “Reduced speed losses”
Show verbatim quote
faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40%
- ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY (2020)Open sourceShare of lost time: 22.8 % · as reported: “Time lost to produce QC rejections”
Show verbatim quote
Time lost to produce QC rejections 19.16% 24.26% 25.135 22.84%
- ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY (2020)Open sourceShare of lost time: 26.2 % · as reported: “Speed loss”
Show verbatim quote
Speed loss 21.55% 29.65% 27.50% 26.23%
- ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY (2020)Open sourceShare of lost time: 11.8 % · as reported: “High FG”
Show verbatim quote
High FG 35.53% 0% 0% 11.84%
- Share of lost time: 23.8 % · as reported: “reduced speed losses”
Show verbatim quote
the three biggest factors that caused the low value of machine effectiveness were idling & minor stoppages losses of 24.61%, yield losses of 24.37%, and reduced speed losses of 23.78%
- Measuring the Efficiency of Contiform Machines with the Overall Equipment Effectiveness Method at PT Tirta Investama Pandaan (2025)Open sourceShare of lost time: 13.5 % · as reported: “Reduce Speed”
Show verbatim quote
The Six Big Losses analysis identified the two most dominant major losses, namely idle minor stoppage of 29.82% and reduce speed of 13.53%.
- Analisis Total Productive Maintenance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Blowing (2025)Open sourceShare of lost time: 0 % · as reported: “Reduce Speed Losses”
Show verbatim quote
Rata - rata 6,10 0,95 11,47 0,00 0,00 0,21