foratvise
Get Started
Included study

Optimizing Beverage Manufacturing: Integrating Lean Manufacturing and Machine Learning to Enhance Efficiency and Reduce Waste

Open source

1Bibliographic record

Authors
Raul Mendoza-Sotomayor, Jose Antonio Sabogal-Arias, Juan Carlos Quiroz-Flores
Year
2024
Venue
International Journal of Engineering Trends and Technology
Country
Peru
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 5 machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
As observed in Figure 4, the company lacks an adequate demand forecast and experiences high changeover time and a high percentage of defects during the labeling process.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—mixing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 315 SEC TCP= 30 MIN TF= 100% PNC= 8% TD= 25200 SEC/DAY
Setup and adjustmentsLost time30.0 minSingle extractor
—mixing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 315 SEC TCP= 30 MIN TF= 100% PNC= 8% TD= 25200 SEC/DAY
Process defects (scrap and rework)Defect rate8.00 %Single extractor
—mixing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 315 SEC TCP= 30 MIN TF= 100% PNC= 8% TD= 25200 SEC/DAY
noneAvailability100 %Single extractor
—filling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 293 SEC TCP= 10 MIN TF= 75% PNC= 12% TD= 25200 SEC/DAY
Setup and adjustmentsLost time10.0 minSingle extractor
—filling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 293 SEC TCP= 10 MIN TF= 75% PNC= 12% TD= 25200 SEC/DAY
Process defects (scrap and rework)Defect rate12.0 %Single extractor
—filling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 293 SEC TCP= 10 MIN TF= 75% PNC= 12% TD= 25200 SEC/DAY
noneAvailability75.0 %Single extractor
—capping machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 376 SEC TCP= 10 MIN TF= 90% PNC= 15% TD= 25200 SEC/DAY
Setup and adjustmentsLost time10.0 minSingle extractor
—capping machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 376 SEC TCP= 10 MIN TF= 90% PNC= 15% TD= 25200 SEC/DAY
Process defects (scrap and rework)Defect rate15.0 %Single extractor
—capping machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 376 SEC TCP= 10 MIN TF= 90% PNC= 15% TD= 25200 SEC/DAY
noneAvailability90.0 %Single extractor
improperly sealed bottlescapping machine
Show verbatim quote (Section 5.1 Value Stream Mapping)
The main issues concerning the product process include 25% of incorrectly labeled bottles, 18% of improperly sealed bottles, and 12% of reprocessing in the current alcoholic beverage production process.
Process defects (scrap and rework)Defect rate18.0 %Single extractor
—labeling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 336 SEC TCP= 10 MIN TF= 80% PNC= 20% TD= 25200 SEC/DAY
Setup and adjustmentsLost time10.0 minSingle extractor
—labeling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 336 SEC TCP= 10 MIN TF= 80% PNC= 20% TD= 25200 SEC/DAY
Process defects (scrap and rework)Defect rate20.0 %Single extractor
—labeling machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 336 SEC TCP= 10 MIN TF= 80% PNC= 20% TD= 25200 SEC/DAY
noneAvailability80.0 %Single extractor
incorrectly labeled bottleslabeling machine
Show verbatim quote (Section 5.1 Value Stream Mapping)
The main issues concerning the product process include 25% of incorrectly labeled bottles, 18% of improperly sealed bottles, and 12% of reprocessing in the current alcoholic beverage production process.
Process defects (scrap and rework)Defect rate25.0 %Single extractor
—packing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 420 SEC TCP= 1 MIN TF= 100% PNC= 0% TD= 25200 SEC/DAY
Setup and adjustmentsLost time1.00 minSingle extractor
—packing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 420 SEC TCP= 1 MIN TF= 100% PNC= 0% TD= 25200 SEC/DAY
Process defects (scrap and rework)Defect rate0 %Single extractor
—packing machine
Show verbatim quote (Fig. 4 VSM of the company)
TC= 420 SEC TCP= 1 MIN TF= 100% PNC= 0% TD= 25200 SEC/DAY
noneAvailability100 %Single extractor
reprocessing
Show verbatim quote (Section 5.1 Value Stream Mapping)
The main issues concerning the product process include 25% of incorrectly labeled bottles, 18% of improperly sealed bottles, and 12% of reprocessing in the current alcoholic beverage production process.
Process defects (scrap and rework)Defect rate12.0 %Single extractor

Observation units

  • Mixing station · Mixing and blending · Baseline
  • Filling · Filling · Baseline
  • Capping · Capping and seaming · Baseline
  • Labeling · Labeling and coding · Baseline
  • Packing · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Whole production line · Whole line or unspecified equipment · Baseline