Setup and adjustments

Labeling machine changeover and setup

Setup and adjustmentsAvailabilityLabeling and coding

In short

It appears in about 2 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 8 of the 85 studies that could observe it (good evidence).

What happens

Switching product, bottle shape or label format on the labeling machine requires mechanical adjustments such as changing label reels, resetting guide rails and star wheels, and recalibrating sensors and print/apply heads before stable operation is reached. Part of this work is done as internal setup with the line fully stopped, while other tasks could be performed externally while the previous run is still producing, so poor preparation extends the stoppage. The resulting dead time between the last good unit of the previous run and the first good unit of the new run is recorded as changeover loss.

What is done about it

Apply SMED analysis to separate internal from external setup tasks, pre-staging label reels, tooling and format parts so they are ready before the line stops, and standardizing guide and sensor settings with quick-adjust mechanisms or format recipes stored in the control system. Training operators on a documented changeover sequence and using quick-release fixtures further reduces the internal setup time.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
2.3% [0.8–5.1%]
Expected share of lost time
1.3% [0.4–2.9%]
Share of lost time when present
56% [45–66%]
Studies / units
85 / 113
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    2.4% [0.4–6.8%]11 studies
  • Soft drinks, bottled water and juices
    3.5% [1.0–8.3%]29 studies
  • Brewing, wine and spirits
    7.1% [1.8–17.2%]13 studies
  • Bakery and pasta
    2.8% [0.4–9.0%]1 study
  • Meat, poultry and seafood
    2.6% [0.4–7.7%]4 studies
  • Fruit and vegetable processing
    2.6% [0.4–8.3%]4 studies
  • Grain and oilseed milling
    2.6% [0.4–8.0%]3 studies
  • Sugar and confectionery
    2.7% [0.4–8.4%]3 studies
  • Snacks, coffee, tea and other foods
    2.5% [0.4–8.0%]4 studies
  • Animal feed and pet food
    2.6% [0.4–7.9%]4 studies
  • Food manufacturing (unspecified or mixed)
    2.4% [0.4–7.1%]9 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Switching product, bottle shape or label format on the labeling machine requires mechanical adjustments such as changing label reels, resetting guide rails and star wheels, and recalibrating sensors and print/apply heads before stable operation is reached. Part of this work is done as internal setup with the line fully stopped, while other tasks could be performed externally while the previous run is still producing, so poor preparation extends the stoppage. The resulting dead time between the last good unit of the previous run and the first good unit of the new run is recorded as changeover loss.

How it looks in SCADA data

Engineering guidance

The labeler machine state switches to setup, changeover or stopped mode for an extended duration between the end-of-batch event of one SKU and the start-of-production event of the next, often correlated with operator login or changeover job logs in the MES. Upstream and downstream conveyor accumulation and starvation states appear around the same window, and minor idle events may cluster immediately after restart while the machine stabilizes.

Countermeasure

Engineering guidance

Apply SMED analysis to separate internal from external setup tasks, pre-staging label reels, tooling and format parts so they are ready before the line stops, and standardizing guide and sensor settings with quick-adjust mechanisms or format recipes stored in the control system. Training operators on a documented changeover sequence and using quick-release fixtures further reduces the internal setup time.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Number of events: 8.00 Boxes x 12 · as reported: “Mislabeling”
    Show verbatim quote
    Mislabeling Average 15 8
  2. Number of events: 15.0 Boxes x 12 · as reported: “Mislabeling”
    Show verbatim quote
    Mislabeling Average 15 8
  3. Mean event duration: 42.0 min · as reported: “Line change time”
    Show verbatim quote
    Line change time Average 42 16
  4. Mean event duration: 16.0 min · as reported: “Line change time”
    Show verbatim quote
    Line change time Average 42 16
  5. Lost time: 2.00 min · as reported: “Adjustment of tulip height”
    Show verbatim quote
    Regulagem da altura das tulipas 2
  6. Lost time: 3.00 min · as reported: “Adjustment of gluing units”
    Show verbatim quote
    Regulagem dos grupos coladores 3
  7. Lost time: 1.00 min · as reported: “Adjustment of label sensors”
    Show verbatim quote
    Regulagem dos sensores dos rótulos 1
  8. Lost time: 1.00 min · as reported: “Adjustment of tulip height”
    Show verbatim quote
    Regulagem da altura das tulipas 1
  9. Lost time: 3.00 min · as reported: “Adjustment of gluing units”
    Show verbatim quote
    Regulagem dos grupos coladores 3
  10. Lost time: 1.00 min · as reported: “Adjustment of label sensors”
    Show verbatim quote
    Regulagem dos sensores dos rótulos 1
  11. Lost time: 31.1 min:s · as reported: “external setup”
    Show verbatim quote
    Verificação da rotulagem 00:10 TOTAL 16:34 31:06
  12. Lost time: 450 min · as reported: “LM”
    Show verbatim quote
    Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
  13. Number of events: 17.0 events · as reported: “LM”
    Show verbatim quote
    Total 61 21 24 22 17 7 11 10 8 181
  14. Mean event duration: 148 min · as reported: “Setup time”
    Show verbatim quote
    Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
  15. Mean event duration: 0 min · as reported: “Idle time”
    Show verbatim quote
    Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
  16. Mean event duration: 148 min · as reported: “equipment setup”
    Show verbatim quote
    In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4).
  17. Mean event duration: 19.0 min · as reported: “equipment setup”
    Show verbatim quote
    In short, our results showed that before the method made its mark, the equipment setup averaged 148 minutes, and after the implementation, the setup time decreased to two digits, approximately 19 minutes (Fig. 4).
  18. Defect rate: 25.0 % · as reported: “incorrectly labeled bottles”
    Show verbatim quote
    The main issues concerning the product process include 25% of incorrectly labeled bottles, 18% of improperly sealed bottles, and 12% of reprocessing in the current alcoholic beverage production process.
  19. Lost time: 900 s · as reported: “Bottle labeling (per bag)”
    Show verbatim quote
    3 Bottle labeling (per bag) 900 - 900
  20. Lost time: 600 s · as reported: “Bottle labeling (per bag)”
    Show verbatim quote
    2 Bottle labeling (per bag) 600 - 600