Included study
Lean Six Sigma 4.0 Application in the Food and Beverage Industry: A Case Study
1Bibliographic record
- Authors
- Wasley de Jesus Santos, Olivia McDermott, Anna Trubetskaya
- Year
- 2025
- Venue
- IEEE Engineering Management Review
- Country
- Ireland
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 90 days
- Data collection
- automatic_monitoring
- Intervention
Show the setting as described by the study
This approach was tested in a case study conducted at a multinational food and beverage company that manufactures concentrates sent to bottling plants worldwide.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Automatic line monitoring, or systematic logs covering every stop in the period. | 2 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
size changeoversShow verbatim quote (Section 4.1 Define / Figure 3)Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%. | Setup and adjustments | Share of lost time | 8.90 % | Both extractors agreed |
changeoversShow verbatim quote (Section 4.1 Define / Figure 3)A notable finding is that changeovers contribute to 40% of the total losses,emphasising the impact of equipment and process adjustments on operational performance. | Setup and adjustments | Share of lost time | 40.0 % | Both extractors agreed |
label changeoversShow verbatim quote (Section 4.1 Define / Figure 3)Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%. | Setup and adjustments | Share of lost time | 16.0 % | Both extractors agreed |
—Show verbatim quote (Abstract)This leads to the improvement of OEE from 44.4% to 50%,which is partially supported by the integration of inline specific gravity meters and conductivity meters. | none | OEE | 50.0 % | Both extractors agreed |
—Show verbatim quote (Section 4.1 Define)The current OEE of the Ireland Plant was 44.4%,which is noticeably below the established target. | none | OEE | 44.4 % | Both extractors agreed |
CIP conductivity meter - operational congestionconductivity meterShow verbatim quote (Section 4.4 Improve)This enhancement reduced the overall CIP cycle time and decreased operational congestion by 2.6 h per week,showcasing a substantial increase in efficiency. | Setup and adjustments | Lost time | 2.60 h | Both extractors agreed |
CIP processesShow verbatim quote (Section 4.1 Define / Figure 3)Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%. | Setup and adjustments | Share of lost time | 15.0 % | Both extractors agreed |
specific gravity meter (L-Dens 7400) implementationinline specific gravity meter L-Dens 7400Show verbatim quote (Section 4.4 Improve)Adopting the L-Dens 7400 significantly reduced changeover times,shaving approximately 10 min off each transition. | Setup and adjustments | Lost time | 10.0 min | Both extractors agreed |
SMED and related improvementsShow verbatim quote (Section 4.4 Improve)Therefore,the total reduction in changeover time due to SMED and related improvements was 16 min. | Setup and adjustments | Lost time | 16.0 min | Both extractors agreed |
conductivity/temperature transmitters (CIP rinse)conductivity meterShow verbatim quote (Section 4.4 Improve)This strategic placement allows for real-time,accurate measurements that speed up adjusting cleaning solutions,leading to a reduction of approximately 4 min per wash cycle. | Setup and adjustments | Lost time | 4.00 min | Both extractors agreed |
changeovers during liquid filling operations (2017)Show verbatim quote (Section 4.1 Define / Figure 4)Starting from 7121 changeovers in 2017,there was a steady annual increase,culminating in 15 388 changeovers projected for 2023. | Setup and adjustments | Number of events | 7,121 events | Single extractor |
changeovers during liquid filling operations (2023, projected)Show verbatim quote (Section 4.1 Define / Figure 4)Starting from 7121 changeovers in 2017,there was a steady annual increase,culminating in 15 388 changeovers projected for 2023. | Setup and adjustments | Number of events | 15,388 events | Single extractor |
5S tooling managementShow verbatim quote (Section 4.4 Improve)This organized approach has profoundly impacted changeover times,notably decreasing them by 6 min. | Setup and adjustments | Lost time | 6.00 min | Single extractor |
Observation units
- Ireland Plant - liquid filling line · Filling · Baseline
- Ireland Plant - liquid filling line · Filling · After intervention