Lean Six Sigma 4.0 Application in the Food and Beverage Industry: A Case Study

Open source

1Bibliographic record

Authors
Wasley de Jesus Santos, Olivia McDermott, Anna Trubetskaya
Year
2025
Venue
IEEE Engineering Management Review
Country
Ireland
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
90 days
Data collection
automatic_monitoring
Intervention
Show the setting as described by the study
This approach was tested in a case study conducted at a multinational food and beverage company that manufactures concentrates sent to bottling plants worldwide.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Automatic line monitoring, or systematic logs covering every stop in the period.2 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
size changeovers
Show verbatim quote (Section 4.1 Define / Figure 3)
Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%.
Setup and adjustmentsShare of lost time8.90 %Both extractors agreed
changeovers
Show verbatim quote (Section 4.1 Define / Figure 3)
A notable finding is that changeovers contribute to 40% of the total losses,emphasising the impact of equipment and process adjustments on operational performance.
Setup and adjustmentsShare of lost time40.0 %Both extractors agreed
label changeovers
Show verbatim quote (Section 4.1 Define / Figure 3)
Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%.
Setup and adjustmentsShare of lost time16.0 %Both extractors agreed
—
Show verbatim quote (Abstract)
This leads to the improvement of OEE from 44.4% to 50%,which is partially supported by the integration of inline specific gravity meters and conductivity meters.
noneOEE50.0 %Both extractors agreed
—
Show verbatim quote (Section 4.1 Define)
The current OEE of the Ireland Plant was 44.4%,which is noticeably below the established target.
noneOEE44.4 %Both extractors agreed
CIP conductivity meter - operational congestionconductivity meter
Show verbatim quote (Section 4.4 Improve)
This enhancement reduced the overall CIP cycle time and decreased operational congestion by 2.6 h per week,showcasing a substantial increase in efficiency.
Setup and adjustmentsLost time2.60 hBoth extractors agreed
CIP processes
Show verbatim quote (Section 4.1 Define / Figure 3)
Specifically,label changeovers account for a 16% loss,followed closely by CIP processes at 15% and size changeovers at 8.9%.
Setup and adjustmentsShare of lost time15.0 %Both extractors agreed
specific gravity meter (L-Dens 7400) implementationinline specific gravity meter L-Dens 7400
Show verbatim quote (Section 4.4 Improve)
Adopting the L-Dens 7400 significantly reduced changeover times,shaving approximately 10 min off each transition.
Setup and adjustmentsLost time10.0 minBoth extractors agreed
SMED and related improvements
Show verbatim quote (Section 4.4 Improve)
Therefore,the total reduction in changeover time due to SMED and related improvements was 16 min.
Setup and adjustmentsLost time16.0 minBoth extractors agreed
conductivity/temperature transmitters (CIP rinse)conductivity meter
Show verbatim quote (Section 4.4 Improve)
This strategic placement allows for real-time,accurate measurements that speed up adjusting cleaning solutions,leading to a reduction of approximately 4 min per wash cycle.
Setup and adjustmentsLost time4.00 minBoth extractors agreed
changeovers during liquid filling operations (2017)
Show verbatim quote (Section 4.1 Define / Figure 4)
Starting from 7121 changeovers in 2017,there was a steady annual increase,culminating in 15 388 changeovers projected for 2023.
Setup and adjustmentsNumber of events7,121 eventsSingle extractor
changeovers during liquid filling operations (2023, projected)
Show verbatim quote (Section 4.1 Define / Figure 4)
Starting from 7121 changeovers in 2017,there was a steady annual increase,culminating in 15 388 changeovers projected for 2023.
Setup and adjustmentsNumber of events15,388 eventsSingle extractor
5S tooling management
Show verbatim quote (Section 4.4 Improve)
This organized approach has profoundly impacted changeover times,notably decreasing them by 6 min.
Setup and adjustmentsLost time6.00 minSingle extractor

Observation units

  • Ireland Plant - liquid filling line · Filling · Baseline
  • Ireland Plant - liquid filling line · Filling · After intervention