Improving Overall Equipment Effectiveness in the Packaging Process of Finished Cattle Feed: A Case Study of an Animal Feed Production Facility
1Bibliographic record
- Authors
- Petpoom Nuljan, Jongkol Srithorn
- Year
- 2025
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Thailand
- Segment
- Animal feed and pet food
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 245 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
This study focuses on improving the Overall Equipment Effectiveness (OEE) in the packaging process of cattle feed at an animal feed production facility.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—packaging machineShow verbatim quote (Table 1)June 2024 88% 84% 100% 74% | none | Performance | 84.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 1)July 2024 88% 84% 100% 75% | none | Quality | 100 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 2)November 2024 93% 84% 100% 79% | none | OEE | 79.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 2)December 2024 94% 84% 100% 79% | none | Performance | 84.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 1)August 2024 83% 84% 100% 71% | none | Availability | 83.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 2)October 2024 93% 84% 100% 79% | none | Quality | 100 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 2)December 2024 94% 84% 100% 79% | none | Availability | 94.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 1)August 2024 83% 84% 100% 71% | none | OEE | 71.0 % | Both extractors agreed |
—packaging machineShow verbatim quote (Table 1)May 2024 85% 84% 100% 73% | none | Availability | 85.0 % | Single extractor |
—packaging machineShow verbatim quote (Table 1)May 2024 85% 84% 100% 73% | none | OEE | 73.0 % | Single extractor |
—packaging machineShow verbatim quote (Table 1)June 2024 88% 84% 100% 74% | none | Availability | 88.0 % | Single extractor |
—packaging machineShow verbatim quote (Table 1)June 2024 88% 84% 100% 74% | none | OEE | 74.0 % | Single extractor |
—packaging machineShow verbatim quote (Table 1)July 2024 88% 84% 100% 75% | none | OEE | 75.0 % | Single extractor |
bags stuck on conveyor before packagingconveyorShow verbatim quote (Figure 1)bags stuck on conveyor Before packaging. Bags falling in machinery. Pallet flow issues. lmoroper bag attachment. Frequent stitching adjiustments. Hour 180 40 23 16 11 Cum % 67% 82% 90% 96% 100% 180 40 23 16 11 | Idling and minor stops (micro-stops) | Lost time | 180 h | Single extractor |
Bags falling in machinerypackaging machineShow verbatim quote (Figure 1)bags stuck on conveyor Before packaging. Bags falling in machinery. Pallet flow issues. lmoroper bag attachment. Frequent stitching adjiustments. Hour 180 40 23 16 11 Cum % 67% 82% 90% 96% 100% 180 40 23 16 11 | Idling and minor stops (micro-stops) | Lost time | 40.0 h | Single extractor |
Pallet flow issuesconveyorShow verbatim quote (Figure 1)bags stuck on conveyor Before packaging. Bags falling in machinery. Pallet flow issues. lmoroper bag attachment. Frequent stitching adjiustments. Hour 180 40 23 16 11 Cum % 67% 82% 90% 96% 100% 180 40 23 16 11 | Idling and minor stops (micro-stops) | Lost time | 23.0 h | Single extractor |
Improper bag attachmentShow verbatim quote (Figure 1)bags stuck on conveyor Before packaging. Bags falling in machinery. Pallet flow issues. lmoroper bag attachment. Frequent stitching adjiustments. Hour 180 40 23 16 11 Cum % 67% 82% 90% 96% 100% 180 40 23 16 11 | Idling and minor stops (micro-stops) | Lost time | 16.0 h | Single extractor |
Frequent stitching adjustmentsbag stitching machineShow verbatim quote (Figure 1)bags stuck on conveyor Before packaging. Bags falling in machinery. Pallet flow issues. lmoroper bag attachment. Frequent stitching adjiustments. Hour 180 40 23 16 11 Cum % 67% 82% 90% 96% 100% 180 40 23 16 11 | Setup and adjustments | Lost time | 11.0 h | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 2,650 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 2,570 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 2,580 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 3,000 minute | Single extractor |
—packaging machineShow verbatim quote (Table 2)October 2024 93% 84% 100% 79% | none | Availability | 93.0 % | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 850 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 750 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 660 minute | Single extractor |
feed bags getting stuck on the conveyor before packagingconveyorShow verbatim quote (Figure 4)2650.00 2570.00 2580.00 3000.00 850.00 750.00 660.00 730.00 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 3500.00 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Food bags are attached to each conveyor before packing Before Improvement After Improvement Target 800 minute | Idling and minor stops (micro-stops) | Lost time | 730 minute | Single extractor |
Observation units
- Cattle feed packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Cattle feed packaging machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention