foratvise
Get Started
Included study

Analisa Efektifitas Mesin Palletizer Menggunakan Metode OEE Dan Identifikasi Kegagalan Dengan FMEA

Open source

1Bibliographic record

Authors
Junaidi Suprapto, Nuriyanto Nuriyanto
Year
2025
Venue
Jurnal Teknik Industri Terintegrasi
Country
Indonesia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 4 machines
Observation period
30 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Paletizer yng di gunakan di line Produksi adalah Conventional Palletizer yang mana adalah jenis mesin palletizer yang menggunakan sistem mekanis untuk menyusun produk di atas palet secara otomatis.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 3)
3 week 38 124.762 0,043 5989 89,1
nonePerformance89.1 %Both extractors agreed
—
Show verbatim quote (Table 2)
3 38 6720 436 6284 110 6174 98,25
noneAvailability98.3 %Both extractors agreed
—
Show verbatim quote (Table 2)
1 36 4320 210 4110 42 4068 98,98
noneAvailability99.0 %Adjudicated
—
Show verbatim quote (Table 2)
2 37 4320 211 4109 129 3980 96,86
noneAvailability96.9 %Adjudicated
—
Show verbatim quote (Table 2)
4 39 4320 209 4111 81 4030 98,03
noneAvailability98.0 %Adjudicated
—
Show verbatim quote (Table 3)
1 week 36 83.590 0,045 4012 92,9
nonePerformance92.9 %Single extractor
—
Show verbatim quote (Table 3)
2 week 37 80.965 0,043 3886 90,0
nonePerformance90.0 %Single extractor
—
Show verbatim quote (Table 3)
4 week 39 81.965 0,044 3934 91,1
nonePerformance91.1 %Single extractor
—
Show verbatim quote (Table 4)
1 week 36 83.590 515 99,38%
noneQuality99.4 %Single extractor
—
Show verbatim quote (Table 4)
2 week 37 80.965 513 99,37%
noneQuality99.4 %Single extractor
—
Show verbatim quote (Table 4)
3 week 38 124.762 755 99,39%
noneQuality99.4 %Single extractor
—
Show verbatim quote (Table 5)
1 week 36 97,62 92,87 99,38 90,10
noneOEE90.1 %Single extractor
—
Show verbatim quote (Table 5)
2 week 37 94,57 89,95 99,37 84,53
noneOEE84.5 %Single extractor
—
Show verbatim quote (Table 5)
3 week 38 95,31 89,12 99,39 84,42
noneOEE84.4 %Single extractor
—
Show verbatim quote (Table 5)
4 week 39 95,69 91,06 99,38 86,60
noneOEE86.6 %Single extractor
—
Show verbatim quote (Table 6)
1 week 36 35 4110 0,85
Equipment failure (breakdowns)Share of planned time0.850 %Single extractor
—
Show verbatim quote (Table 6)
2 week 37 94 4109 2,29
Equipment failure (breakdowns)Share of planned time2.29 %Single extractor
—
Show verbatim quote (Table 6)
3 week 38 149 6284 2,37
Equipment failure (breakdowns)Share of planned time2.37 %Single extractor
—
Show verbatim quote (Table 6)
4 week 39 61 4111 1,48
Equipment failure (breakdowns)Share of planned time1.48 %Single extractor
—
Show verbatim quote (Table 7)
1 week 36 46 4110 1,12
Setup and adjustmentsShare of planned time1.12 %Single extractor
—
Show verbatim quote (Table 7)
2 week 37 84 4109 2,04
Setup and adjustmentsShare of planned time2.04 %Single extractor
—
Show verbatim quote (Table 7)
3 week 38 75 6284 1,19
Setup and adjustmentsShare of planned time1.19 %Single extractor
—
Show verbatim quote (Table 8)
1 week 36 17 4110 0,41
Idling and minor stops (micro-stops)Share of planned time0.410 %Single extractor
—
Show verbatim quote (Table 8)
2 week 37 70 4109 1,70
Idling and minor stops (micro-stops)Share of planned time1.70 %Single extractor
—
Show verbatim quote (Table 8)
3 week 38 75 6284 1,19
Idling and minor stops (micro-stops)Share of planned time1.19 %Single extractor
—
Show verbatim quote (Table 9)
1 week 36 500 500 0 0
Reduced speedShare of planned time0 %Single extractor
—
Show verbatim quote (Table 10)
1 week 36 4110 0,045 515 0,6
Process defects (scrap and rework)Share of planned time0.600 %Single extractor
—
Show verbatim quote (Table 10)
2 week 37 4109 0,043 513 0,8
Process defects (scrap and rework)Share of planned time0.800 %Single extractor
—
Show verbatim quote (Table 10)
3 week 38 6284 0,043 755 0,5
Process defects (scrap and rework)Share of planned time0.500 %Single extractor
—
Show verbatim quote (Table 11)
1 week 36 4110 0,045 0 0
Start-up losses (reduced yield)Share of planned time0 %Single extractor
—
Show verbatim quote (Table 12)
1 Equipment Failure 339 1,72%
Equipment failure (breakdowns)Lost time339 minSingle extractor
—
Show verbatim quote (Table 12)
1 Equipment Failure 339 1,72%
Equipment failure (breakdowns)Share of planned time1.72 %Single extractor
—
Show verbatim quote (Table 12)
2 Set Up and Adjusment 239 1,21%
Setup and adjustmentsLost time239 minSingle extractor
—
Show verbatim quote (Table 12)
2 Set Up and Adjusment 239 1,21%
Setup and adjustmentsShare of planned time1.21 %Single extractor
—
Show verbatim quote (Table 12)
3 Idling and Minor Stoppages 214 1,09%
Idling and minor stops (micro-stops)Lost time214 minSingle extractor
—
Show verbatim quote (Table 12)
3 Idling and Minor Stoppages 214 1,09%
Idling and minor stops (micro-stops)Share of planned time1.09 %Single extractor
—
Show verbatim quote (Table 12)
4 Reduced Speed 0 0,00%
Reduced speedLost time0 minSingle extractor
—
Show verbatim quote (Table 12)
5 Procces Defect 136 0,69%
Process defects (scrap and rework)Lost time136 minSingle extractor
—
Show verbatim quote (Table 12)
5 Procces Defect 136 0,69%
Process defects (scrap and rework)Share of planned time0.690 %Single extractor
—
Show verbatim quote (Table 12)
6 Reduced Yield 0 0,00%
Start-up losses (reduced yield)Lost time0 minSingle extractor
FillingFilling
Show verbatim quote (Table 13)
1 Filling 84 25%
Equipment failure (breakdowns)Lost time84.0 minSingle extractor
FillingFilling
Show verbatim quote (Table 13)
1 Filling 84 25%
Equipment failure (breakdowns)Share of lost time25.0 %Single extractor
LabelLabel
Show verbatim quote (Table 13)
2 Label 40 12%
Equipment failure (breakdowns)Lost time40.0 minSingle extractor
LabelLabel
Show verbatim quote (Table 13)
2 Label 40 12%
Equipment failure (breakdowns)Share of lost time12.0 %Single extractor
Carton ErectorCarton Erector
Show verbatim quote (Table 13)
3 Carton Erector 27 8%
Equipment failure (breakdowns)Lost time27.0 minSingle extractor
Carton ErectorCarton Erector
Show verbatim quote (Table 13)
3 Carton Erector 27 8%
Equipment failure (breakdowns)Share of lost time8.00 %Single extractor
PalletizerPalletizer
Show verbatim quote (Table 13)
4 Palletizer 188 55%
Equipment failure (breakdowns)Lost time188 minSingle extractor
PalletizerPalletizer
Show verbatim quote (Table 13)
4 Palletizer 188 55%
Equipment failure (breakdowns)Share of lost time55.0 %Single extractor
—palletizer
Show verbatim quote (Table 13 and text discussion)
mesin palletizer yang mana total downtime pada Bulan September adalah sebesar 188 menit atau menyumbang 55% dari total losses keseluruhan Teknical Breakdown
Equipment failure (breakdowns)Lost time188 minSingle extractor

Observation units

  • Line 4 · Whole line or unspecified equipment · Baseline
  • Palletizer · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline