Included study
Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME
1Bibliographic record
- Authors
- Gustavo Chaccha-Cuicapusa, Marco Antonio Flores-Chavez, Elmer Luis Tupia-De-La-Cruz
- Year
- 2025
- Venue
- International Journal of Industrial Engineering
- Country
- Peru
- Segment
- Dairy products
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The company ran a factory that made and packaged drinkable yogurt in a variety of ways.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Section 4.3.3)It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase. | none | OEE | 72.8 % | Both extractors agreed |
—Show verbatim quote (Section 4.2)This result showed that the average efficiency level over the past twelve months was 67.7%, which is lower than the industry standard. | none | OEE | 67.7 % | Both extractors agreed |
—filling machineShow verbatim quote (Section 4.3.3)It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase. | none | OEE | 70.6 % | Both extractors agreed |
product losses during the filling processfilling machineShow verbatim quote (Section 4.2)The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%. | Process defects (scrap and rework) | Share of lost time | 37.0 % | Both extractors agreed |
setup time delaysfilling machineShow verbatim quote (Section 4.2)The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies). | Setup and adjustments | Share of lost time | 44.2 % | Both extractors agreed |
—filling machineShow verbatim quote (Section 4.3.3)It was confirmed that system availability went up by 10.7 percentage points, the OEE of the filling subprocess went up from 60.4% to 70.6%, and the overall production OEE went up to 72.8%, which is an eight-percentage-point increase. | none | OEE | 60.4 % | Both extractors agreed |
—filling machineShow verbatim quote (Section 4.3.2)These numbers showed that the system broke down a lot and took a long time to recover, which meant it was only available 69.9% of the time. | none | Availability | 69.9 % | Both extractors agreed |
—filling machineShow verbatim quote (Section 4.3.2)The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used. | Equipment failure (breakdowns) | Mean event duration | 1.53 h | Both extractors agreed |
—filling machineShow verbatim quote (Section 4.3.2)The system's Mean Time Between Failures (MTBF) was 3.57 hours, and the Mean Time to Repair (MTTR) was 1.53 hours before it was used. | Equipment failure (breakdowns) | Time between events | 3.57 h | Both extractors agreed |
filling machine break down oftenfilling machineShow verbatim quote (Section 4.2)The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies). | Equipment failure (breakdowns) | Share of lost time | 55.8 % | Both extractors agreed |
—filling machineShow verbatim quote (Table 1)MTTR hour 1.53 0.77 1.5 -2% | Equipment failure (breakdowns) | Mean event duration | 1.50 h | Both extractors agreed |
—filling machineShow verbatim quote (Table 1)MTBF hour 3.57 5.84 6.23 75% | Equipment failure (breakdowns) | Time between events | 6.23 h | Both extractors agreed |
—filling machineShow verbatim quote (Table 1)Availability % 69.90% 80% 80.60% 15% | none | Availability | 80.6 % | Both extractors agreed |
setup timefilling machineShow verbatim quote (Section 4.3.1)The average setup time alone was 37.5 minutes, which made things much less efficient and cut down on effective working time. | Setup and adjustments | Lost time | 37.5 min | Single extractor |
setup timefilling machineShow verbatim quote (Figure 2 / Section 4.3.1)The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes. | Setup and adjustments | Lost time | 37.3 min | Single extractor |
unproductive time during the packaging processfilling machineShow verbatim quote (Section 4.2)The analysis found two main reasons for this inefficiency: unproductive time during the packaging process, which made up 63% of the problem, and product losses during the filling process, which made up the other 37%. | Not classifiable from the report | Share of lost time | 63.0 % | Single extractor |
setup timefilling machineShow verbatim quote (Table 1)Setup Time minutes 37.5 18.75 16.39 -56% | Setup and adjustments | Lost time | 16.4 min | Single extractor |
setup timefilling machineShow verbatim quote (Figure 2 / Section 4.3.1)The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes. | Setup and adjustments | Lost time | 16.3 min | Single extractor |
—filling machineShow verbatim quote (Section 4.3.1)The average setup time alone was 37.5 minutes | Setup and adjustments | Mean event duration | 37.5 min | Single extractor |
—filling machineShow verbatim quote (Table 1)Setup Time | minutes | 37.5 | 18.75 | 16.39 | -56% | Setup and adjustments | Mean event duration | 16.4 min | Single extractor |
Observation units
- Overall production process · Whole line or unspecified equipment · After intervention
- Overall production process · Whole line or unspecified equipment · Baseline
- Filling machine (packaging subprocess) · Filling · After intervention
- Filling machine (packaging subprocess) · Filling · Baseline
- Packaging line · Filling · Baseline
- Packaging line · Filling · After intervention