Setup and adjustments

Filler changeover and adjustment

Setup and adjustmentsAvailabilityFilling

In short

It appears in about 4 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 13 of the 120 studies that could observe it (strong evidence).

What happens

Time is lost between the last good unit of one filling run and the first good unit of the next because the filler must be stopped to change product-contact parts (nozzles, dosing elements, format guides), reset dosing or sealing parameters, and fine-tune the equipment until output stabilizes. This includes mechanical part exchange, parameter entry, and trial adjustments before the process reaches target fill accuracy and sealing quality.

What is done about it

Apply structured quick-changeover methods (SMED) to separate internal and external setup activities, pre-stage tooling and recipes, and use standardized work instructions with predefined parameter sets to reduce trial-and-error adjustment. Automating parameter recall and using tool-less quick-change fittings further shortens the non-productive interval.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
3.6% [1.5–7.1%]
Expected share of lost time
2.0% [0.8–4.0%]
Share of lost time when present
56% [45–65%]
Studies / units
120 / 162
Evidence grade
A

Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    5.4% [1.3–13.3%]18 studies
  • Soft drinks, bottled water and juices
    3.1% [1.0–6.6%]44 studies
  • Brewing, wine and spirits
    5.1% [1.3–12.1%]16 studies
  • Bakery and pasta
    4.4% [0.7–13.4%]0 studies
  • Meat, poultry and seafood
    4.8% [1.0–13.2%]6 studies
  • Fruit and vegetable processing
    3.9% [0.7–10.9%]4 studies
  • Grain and oilseed milling
    3.7% [0.7–10.7%]6 studies
  • Sugar and confectionery
    4.0% [0.7–11.6%]3 studies
  • Snacks, coffee, tea and other foods
    6.6% [1.5–18.0%]6 studies
  • Animal feed and pet food
    3.9% [0.7–11.2%]4 studies
  • Food manufacturing (unspecified or mixed)
    6.1% [1.5–15.6%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Time is lost between the last good unit of one filling run and the first good unit of the next because the filler must be stopped to change product-contact parts (nozzles, dosing elements, format guides), reset dosing or sealing parameters, and fine-tune the equipment until output stabilizes. This includes mechanical part exchange, parameter entry, and trial adjustments before the process reaches target fill accuracy and sealing quality.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows an extended machine-state duration logged as changeover or setup, with the filler in a non-running state while upstream and downstream equipment may be starved or blocked; counters for good units remain flat during this interval. Repeated short cycles of state toggling between setup and run can appear as operators perform iterative fine adjustments before stable production is confirmed.

Countermeasure

Engineering guidance

Apply structured quick-changeover methods (SMED) to separate internal and external setup activities, pre-stage tooling and recipes, and use standardized work instructions with predefined parameter sets to reduce trial-and-error adjustment. Automating parameter recall and using tool-less quick-change fittings further shortens the non-productive interval.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 38.0 min · as reported: “Mudar e transportar peças de formato”
    Show verbatim quote
    7, 8, 11, 12 Mudar e transportar peças de formato 38 20
  2. Lost time: 14.0 min · as reported: “Ajustes”
    Show verbatim quote
    16 Ajustes 14 4
  3. Lost time: 5.00 min · as reported: “Testar enchimento”
    Show verbatim quote
    21 Testar enchimento 5 0
  4. Lost time: 1.00 min · as reported: “Trazer a mangueira para junto da enchedora”
    Show verbatim quote
    10 Trazer a mangueira para junto da enchedora 1 0
  5. Mean event duration: 103 min · as reported: “Mudança de tara”
    Show verbatim quote
    Mudança de tara 102,5 min 42 min 60,5 min 1,07%
  6. Mean event duration: 118 min · as reported: “Mudança de cápsula”
    Show verbatim quote
    Mudança de cápsula 118,4 min 55 min 63,4 min
  7. Mean event duration: 152 min · as reported: “Mudança de tara e cápsula”
    Show verbatim quote
    Mudança de tara e cápsula 151,8 min 84 min 67,8 min
  8. Mean event duration: 115 min · as reported: “Mudança de tara (trabalho interno)”
    Show verbatim quote
    A média da duração de trabalho interno das mudanças de tara observadas é de 115 minutos.
  9. Mean event duration: 100 min · as reported: “Mudança de cápsula (trabalho interno)”
    Show verbatim quote
    A média da duração de trabalho interno das mudanças de cápsula observadas é de 100 minutos.
  10. Lost time: 20.0 min · as reported: “Mudar e transportar peças de formato”
    Show verbatim quote
    7, 8, 11, 12 Mudar e transportar peças de formato 38 20
  11. Lost time: 4.00 min · as reported: “Ajustes”
    Show verbatim quote
    16 Ajustes 14 4
  12. Lost time: 0 min · as reported: “Testar enchimento”
    Show verbatim quote
    21 Testar enchimento 5 0
  13. Lost time: 0 min · as reported: “Trazer a mangueira para junto da enchedora”
    Show verbatim quote
    10 Trazer a mangueira para junto da enchedora 1 0
  14. Mean event duration: 42.0 min · as reported: “Mudança de tara”
    Show verbatim quote
    Mudança de tara 102,5 min 42 min 60,5 min 1,07%
  15. Mean event duration: 55.0 min · as reported: “Mudança de cápsula”
    Show verbatim quote
    Mudança de cápsula 118,4 min 55 min 63,4 min
  16. Mean event duration: 84.0 min · as reported: “Mudança de tara e cápsula”
    Show verbatim quote
    Mudança de tara e cápsula 151,8 min 84 min 67,8 min
  17. Mean event duration: 30.0 min · as reported: “Mudança de tara (trabalho interno)”
    Show verbatim quote
    O diagrama de Gantt (Anexo E) indica que o trabalho interno de uma mudança de tara pode ser executado em 30 minutos e que, no total, o tempo requerido para a mudança de tara são 42 minutos.
  18. Mean event duration: 44.0 min · as reported: “Mudança de cápsula (trabalho interno)”
    Show verbatim quote
    O diagrama indica que o trabalho interno de uma mudança de cápsula pode ser executado em 44 minutos e que, no total, o tempo requerido para a mudança de tara são 55 minutos.
  19. Mean event duration: 69.0 min · as reported: “Mudança de tara e cápsula (trabalho interno)”
    Show verbatim quote
    O diagrama indica que o trabalho interno de uma mudança de tara e cápsula pode ser executado em 69 minutos e que, no total, o tempo requerido para a mudança de tara e cápsula são 84 minutos
  20. Share of lost time: 16.4 % · as reported: “Set Up Losses”
    Show verbatim quote
    Set Up Losses 5.220,00 16,36 2
  21. Lost time: 5,220 min · as reported: “Set Up Losses”
    Show verbatim quote
    Set Up Losses 5.220,00 16,36 2
  22. Mean event duration: 69.0 min · as reported: “Setup time”
    Show verbatim quote
    Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
  23. Mean event duration: 73.0 min · as reported: “Idle time”
    Show verbatim quote
    Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
  24. Lost time: 6.60 jam · as reported: “Setup & adjustment”
    Show verbatim quote
    Failure = 97.2 Jam Setup & adjustment = 6.6 jam Downtime = 103.8 jam
  25. Share of lost time: 48.0 % · as reported: “setup time or line preparation time”
    Show verbatim quote
    The most significant contribution of planned stoppages is 48% comes from setup time or line preparation time.
  26. Share of lost time: 2.00 % · as reported: “change over time”
    Show verbatim quote
    The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
  27. Lost time: 34.0 min · as reported: “Setup time”
    Show verbatim quote
    Before the improvement of Single Minute Exchange of Dies (SMED), the actual setup activities are eight activities in total with 34 minutes to finish the setup activities
  28. Lost time: 2,235 min · as reported: “Setup & Adjustment”
    Show verbatim quote
    The second is Setup and Adjustment (30.7%), or equal to 2,235 minutes from data collection for December 2021 – March 2022.
  29. Share of lost time: 30.7 % · as reported: “Setup & Adjustment”
    Show verbatim quote
    The second is Setup and Adjustment (30.7%), or equal to 2,235 minutes from data collection for December 2021 – March 2022.
  30. Lost time: 27.1 jam · as reported: “Setup and Adjustment Lossess”
    Show verbatim quote
    Setup and Adjustment Lossess 27,10 27,10 53,66%
  31. Share of lost time: 53.7 % · as reported: “Setup and Adjustment Lossess”
    Show verbatim quote
    Losses terbesar yang terjadi pada filling multiline 01 adalah setup and adjustment losses yaitu sebesar 27,10 jam selama bulan maret tahun 2023 atau sebesar 53,66% dari total losses yang terjadi dalam proses produksi bumbu masak di mesin filling multiline 01.
  32. Lost time: 18.0 min · as reported: “Total time of setup”
    Show verbatim quote
    Initial 18 11
  33. Lost time: 11.0 min · as reported: “Internal tasks time”
    Show verbatim quote
    Initial 18 11
  34. Lost time: 0 mnt · as reported: “Setup & Adjustment”
    Show verbatim quote
    2 Setup & Adjustment 0 0 20
  35. Lost time: 0 mnt · as reported: “Setup & Adjustment”
    Show verbatim quote
    2 Setup & Adjustment 0 0 20
  36. Lost time: 20.0 mnt · as reported: “Setup & Adjustment”
    Show verbatim quote
    2 Setup & Adjustment 0 0 20
  37. Share of lost time: 44.2 % · as reported: “setup time delays”
    Show verbatim quote
    The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
  38. Lost time: 37.5 min · as reported: “setup time”
    Show verbatim quote
    The average setup time alone was 37.5 minutes, which made things much less efficient and cut down on effective working time.
  39. Lost time: 37.3 min · as reported: “setup time”
    Show verbatim quote
    The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
  40. Lost time: 16.4 min · as reported: “setup time”
    Show verbatim quote
    Setup Time minutes 37.5 18.75 16.39 -56%
  41. Lost time: 16.3 min · as reported: “setup time”
    Show verbatim quote
    The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
  42. Share of planned time: 1.15 % · as reported: “Preparación de línea”
    Show verbatim quote
    Preparación de línea Averías / Paros Reprocesos en envasado 1,15% 7,38% 6,35%
  43. Share of planned time: 1.15 % · as reported: “Preparación de línea”
    Show verbatim quote
    Preparación de línea Averías / Paros ELIMINADO 1,15% 1,00%
  44. Lost time: 120 s · as reported: “Filling machine setup”
    Show verbatim quote
    4 Filling machine setup 120 120 -
  45. Lost time: 120 s · as reported: “Filling machine setup”
    Show verbatim quote
    3 Filling machine setup 120 120 -
  46. Mean event duration: 5.50 h · as reported: “setup”
    Show verbatim quote
    the average setup time was reduced from 7.25 h to 5.50 h
  47. Mean event duration: 7.25 h · as reported: “setup”
    Show verbatim quote
    the average setup time was reduced from 7.25 h to 5.50 h