In short
It appears in about 4 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 13 of the 120 studies that could observe it (strong evidence).
What happens
Time is lost between the last good unit of one filling run and the first good unit of the next because the filler must be stopped to change product-contact parts (nozzles, dosing elements, format guides), reset dosing or sealing parameters, and fine-tune the equipment until output stabilizes. This includes mechanical part exchange, parameter entry, and trial adjustments before the process reaches target fill accuracy and sealing quality.
What is done about it
Apply structured quick-changeover methods (SMED) to separate internal and external setup activities, pre-stage tooling and recipes, and use standardized work instructions with predefined parameter sets to reduce trial-and-error adjustment. Automating parameter recall and using tool-less quick-change fittings further shortens the non-productive interval.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 3.6% [1.5–7.1%]
- Expected share of lost time
- 2.0% [0.8–4.0%]
- Share of lost time when present
- 56% [45–65%]
- Studies / units
- 120 / 162
- Evidence grade
- A
Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.
2Probability by segment
- Dairy products5.4% [1.3–13.3%]18 studies
- Soft drinks, bottled water and juices3.1% [1.0–6.6%]44 studies
- Brewing, wine and spirits5.1% [1.3–12.1%]16 studies
- Bakery and pasta4.4% [0.7–13.4%]0 studies
- Meat, poultry and seafood4.8% [1.0–13.2%]6 studies
- Fruit and vegetable processing3.9% [0.7–10.9%]4 studies
- Grain and oilseed milling3.7% [0.7–10.7%]6 studies
- Sugar and confectionery4.0% [0.7–11.6%]3 studies
- Snacks, coffee, tea and other foods6.6% [1.5–18.0%]6 studies
- Animal feed and pet food3.9% [0.7–11.2%]4 studies
- Food manufacturing (unspecified or mixed)6.1% [1.5–15.6%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceTime is lost between the last good unit of one filling run and the first good unit of the next because the filler must be stopped to change product-contact parts (nozzles, dosing elements, format guides), reset dosing or sealing parameters, and fine-tune the equipment until output stabilizes. This includes mechanical part exchange, parameter entry, and trial adjustments before the process reaches target fill accuracy and sealing quality.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows an extended machine-state duration logged as changeover or setup, with the filler in a non-running state while upstream and downstream equipment may be starved or blocked; counters for good units remain flat during this interval. Repeated short cycles of state toggling between setup and run can appear as operators perform iterative fine adjustments before stable production is confirmed.
Countermeasure
Engineering guidanceApply structured quick-changeover methods (SMED) to separate internal and external setup activities, pre-stage tooling and recipes, and use standardized work instructions with predefined parameter sets to reduce trial-and-error adjustment. Automating parameter recall and using tool-less quick-change fittings further shortens the non-productive interval.
4Sources
- Lost time: 38.0 min · as reported: “Mudar e transportar peças de formato”
Show verbatim quote
7, 8, 11, 12 Mudar e transportar peças de formato 38 20
- Lost time: 14.0 min · as reported: “Ajustes”
Show verbatim quote
16 Ajustes 14 4
- Lost time: 5.00 min · as reported: “Testar enchimento”
Show verbatim quote
21 Testar enchimento 5 0
- Lost time: 1.00 min · as reported: “Trazer a mangueira para junto da enchedora”
Show verbatim quote
10 Trazer a mangueira para junto da enchedora 1 0
- Mean event duration: 103 min · as reported: “Mudança de tara”
Show verbatim quote
Mudança de tara 102,5 min 42 min 60,5 min 1,07%
- Mean event duration: 118 min · as reported: “Mudança de cápsula”
Show verbatim quote
Mudança de cápsula 118,4 min 55 min 63,4 min
- Mean event duration: 152 min · as reported: “Mudança de tara e cápsula”
Show verbatim quote
Mudança de tara e cápsula 151,8 min 84 min 67,8 min
- Mean event duration: 115 min · as reported: “Mudança de tara (trabalho interno)”
Show verbatim quote
A média da duração de trabalho interno das mudanças de tara observadas é de 115 minutos.
- Mean event duration: 100 min · as reported: “Mudança de cápsula (trabalho interno)”
Show verbatim quote
A média da duração de trabalho interno das mudanças de cápsula observadas é de 100 minutos.
- Lost time: 20.0 min · as reported: “Mudar e transportar peças de formato”
Show verbatim quote
7, 8, 11, 12 Mudar e transportar peças de formato 38 20
- Lost time: 4.00 min · as reported: “Ajustes”
Show verbatim quote
16 Ajustes 14 4
- Lost time: 0 min · as reported: “Testar enchimento”
Show verbatim quote
21 Testar enchimento 5 0
- Lost time: 0 min · as reported: “Trazer a mangueira para junto da enchedora”
Show verbatim quote
10 Trazer a mangueira para junto da enchedora 1 0
- Mean event duration: 42.0 min · as reported: “Mudança de tara”
Show verbatim quote
Mudança de tara 102,5 min 42 min 60,5 min 1,07%
- Mean event duration: 55.0 min · as reported: “Mudança de cápsula”
Show verbatim quote
Mudança de cápsula 118,4 min 55 min 63,4 min
- Mean event duration: 84.0 min · as reported: “Mudança de tara e cápsula”
Show verbatim quote
Mudança de tara e cápsula 151,8 min 84 min 67,8 min
- Mean event duration: 30.0 min · as reported: “Mudança de tara (trabalho interno)”
Show verbatim quote
O diagrama de Gantt (Anexo E) indica que o trabalho interno de uma mudança de tara pode ser executado em 30 minutos e que, no total, o tempo requerido para a mudança de tara são 42 minutos.
- Mean event duration: 44.0 min · as reported: “Mudança de cápsula (trabalho interno)”
Show verbatim quote
O diagrama indica que o trabalho interno de uma mudança de cápsula pode ser executado em 44 minutos e que, no total, o tempo requerido para a mudança de tara são 55 minutos.
- Mean event duration: 69.0 min · as reported: “Mudança de tara e cápsula (trabalho interno)”
Show verbatim quote
O diagrama indica que o trabalho interno de uma mudança de tara e cápsula pode ser executado em 69 minutos e que, no total, o tempo requerido para a mudança de tara e cápsula são 84 minutos
- Application of the Concept of Total Productive Maintenance in Automatic Bottle Filling Machines (2019)Open sourceShare of lost time: 16.4 % · as reported: “Set Up Losses”
Show verbatim quote
Set Up Losses 5.220,00 16,36 2
- Application of the Concept of Total Productive Maintenance in Automatic Bottle Filling Machines (2019)Open sourceLost time: 5,220 min · as reported: “Set Up Losses”
Show verbatim quote
Set Up Losses 5.220,00 16,36 2
- Mean event duration: 69.0 min · as reported: “Setup time”
Show verbatim quote
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
- Mean event duration: 73.0 min · as reported: “Idle time”
Show verbatim quote
Blowing machine Filling machine Labelling machine (bottleneck resource) Packaging machine 85 minutes 69 minutes 148 minutes 97 minutes 57 minutes 73 minutes 0 minutes 51 minutes
- Peningkatan Efektivitas Mesin Susu Kental Manis dengan Metode Overall Equipment Effectiveness dan Diagram Ishikawa (2021)Open sourceLost time: 6.60 jam · as reported: “Setup & adjustment”
Show verbatim quote
Failure = 97.2 Jam Setup & adjustment = 6.6 jam Downtime = 103.8 jam
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceShare of lost time: 48.0 % · as reported: “setup time or line preparation time”
Show verbatim quote
The most significant contribution of planned stoppages is 48% comes from setup time or line preparation time.
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceShare of lost time: 2.00 % · as reported: “change over time”
Show verbatim quote
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceLost time: 34.0 min · as reported: “Setup time”
Show verbatim quote
Before the improvement of Single Minute Exchange of Dies (SMED), the actual setup activities are eight activities in total with 34 minutes to finish the setup activities
- Performance Analysis of Filling Machine Using Overall Equipment Effectiveness Metric in Beverage Company (2023)Open sourceLost time: 2,235 min · as reported: “Setup & Adjustment”
Show verbatim quote
The second is Setup and Adjustment (30.7%), or equal to 2,235 minutes from data collection for December 2021 – March 2022.
- Performance Analysis of Filling Machine Using Overall Equipment Effectiveness Metric in Beverage Company (2023)Open sourceShare of lost time: 30.7 % · as reported: “Setup & Adjustment”
Show verbatim quote
The second is Setup and Adjustment (30.7%), or equal to 2,235 minutes from data collection for December 2021 – March 2022.
- Analisis Overall Equipment Effectiveness untuk Meningkatkan Efektivitas Mesin Filling Multiline pada PT-XYZ (2023)Open sourceLost time: 27.1 jam · as reported: “Setup and Adjustment Lossess”
Show verbatim quote
Setup and Adjustment Lossess 27,10 27,10 53,66%
- Analisis Overall Equipment Effectiveness untuk Meningkatkan Efektivitas Mesin Filling Multiline pada PT-XYZ (2023)Open sourceShare of lost time: 53.7 % · as reported: “Setup and Adjustment Lossess”
Show verbatim quote
Losses terbesar yang terjadi pada filling multiline 01 adalah setup and adjustment losses yaitu sebesar 27,10 jam selama bulan maret tahun 2023 atau sebesar 53,66% dari total losses yang terjadi dalam proses produksi bumbu masak di mesin filling multiline 01.
- Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt (2024)Open sourceLost time: 18.0 min · as reported: “Total time of setup”
Show verbatim quote
Initial 18 11
- Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt (2024)Open sourceLost time: 11.0 min · as reported: “Internal tasks time”
Show verbatim quote
Initial 18 11
- Lost time: 0 mnt · as reported: “Setup & Adjustment”
Show verbatim quote
2 Setup & Adjustment 0 0 20
- Lost time: 0 mnt · as reported: “Setup & Adjustment”
Show verbatim quote
2 Setup & Adjustment 0 0 20
- Lost time: 20.0 mnt · as reported: “Setup & Adjustment”
Show verbatim quote
2 Setup & Adjustment 0 0 20
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceShare of lost time: 44.2 % · as reported: “setup time delays”
Show verbatim quote
The first reason had a lot of problems that caused the filling machine to break down often (55.8% of the problems) and setup time delays (44.2% of the inefficiencies).
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceLost time: 37.5 min · as reported: “setup time”
Show verbatim quote
The average setup time alone was 37.5 minutes, which made things much less efficient and cut down on effective working time.
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceLost time: 37.3 min · as reported: “setup time”
Show verbatim quote
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceLost time: 16.4 min · as reported: “setup time”
Show verbatim quote
Setup Time minutes 37.5 18.75 16.39 -56%
- Lean and RCM-Based Production Model to Improve Operational Efficiency in the Production Line of a Peruvian Dairy SME (2025)Open sourceLost time: 16.3 min · as reported: “setup time”
Show verbatim quote
The first setup took 37.3 minutes, but after using the method, it only took 16.3 minutes.
- Proposal for improvement to increase the overall equipment effectiveness (OEE) of a dairy products company through a Preventive Maintenance Plan, Standardized Work, and SMED (2025)Open sourceShare of planned time: 1.15 % · as reported: “Preparación de línea”
Show verbatim quote
Preparación de línea Averías / Paros Reprocesos en envasado 1,15% 7,38% 6,35%
- Proposal for improvement to increase the overall equipment effectiveness (OEE) of a dairy products company through a Preventive Maintenance Plan, Standardized Work, and SMED (2025)Open sourceShare of planned time: 1.15 % · as reported: “Preparación de línea”
Show verbatim quote
Preparación de línea Averías / Paros ELIMINADO 1,15% 1,00%
- Enhancing Productivity through Quick Changeovers: A SMED-Based Methodology in Manufacturing Industry (2026)Open sourceLost time: 120 s · as reported: “Filling machine setup”
Show verbatim quote
4 Filling machine setup 120 120 -
- Enhancing Productivity through Quick Changeovers: A SMED-Based Methodology in Manufacturing Industry (2026)Open sourceLost time: 120 s · as reported: “Filling machine setup”
Show verbatim quote
3 Filling machine setup 120 120 -
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 5.50 h · as reported: “setup”
Show verbatim quote
the average setup time was reduced from 7.25 h to 5.50 h
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 7.25 h · as reported: “setup”
Show verbatim quote
the average setup time was reduced from 7.25 h to 5.50 h