Improvement of a food product manufacturing process

Open source

1Bibliographic record

Authors
Suárez Dueñas, Laia
Year
2025
Venue
UPCommons institutional repository (Universitat Politècnica de Catalunya)
DOI
—
Country
—
Segment
Sugar and confectionery
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
150 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This document examines the operational performance of a cotton candy production line located in a food manufacturing plant belonging to an American company.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 3.3)
the best day was with 277 cartons in the morning shift, and the worst day was with 134 in the same shift, so the media is 205 cartons per shift in this period, but the machines are designed to produce 300 cartons per shift.
noneThroughput205 cartons/shiftBoth extractors agreed
bad pieces
Show verbatim quote (Section 3.2.4.3, Figure 28)
-Lost time doing bad pieces: 30 minutes
Process defects (scrap and rework)Lost time30.0 minBoth extractors agreed
low speed, micro strikes
Show verbatim quote (Section 3.2.4.3, Figure 28)
-Not planned downtimes: 110 minutes, low speed, micro strikes, …
Not classifiable from the reportLost time110 minBoth extractors agreed
breaks, reference change
Show verbatim quote (Section 3.2.4.3, Figure 28)
-Planned downtimes: 140 minutes, breaks, reference change, …
Planned downtime (scheduled maintenance, breaks, no demand)Lost time140 minBoth extractors agreed
—
Show verbatim quote (Section 3.2.4.3, Figure 29)
If the OEE was 100%, at the end of the shift they have to get 1920kg but as it can be seen, the OEE is 44%, so its real weight is 844kg, or less.
noneOEE44.0 %Both extractors agreed
—
Show verbatim quote (Section 3.2.4.3, Figure 29)
If the OEE was 100%, at the end of the shift they have to get 1920kg but as it can be seen, the OEE is 44%, so its real weight is 844kg, or less.
noneThroughput844 kgSingle extractor
—
Show verbatim quote (Section 3.3)
the best day was with 277 cartons in the morning shift, and the worst day was with 134 in the same shift, so the media is 205 cartons per shift in this period, but the machines are designed to produce 300 cartons per shift.
noneThroughput277 cartons/shiftSingle extractor
—
Show verbatim quote (Section 3.3)
the best day was with 277 cartons in the morning shift, and the worst day was with 134 in the same shift, so the media is 205 cartons per shift in this period, but the machines are designed to produce 300 cartons per shift.
noneThroughput134 cartons/shiftSingle extractor
—
Show verbatim quote (Section 3.3)
The average is 180 cartons per shift; it is a low number.
noneThroughput180 cartons/shiftSingle extractor
—
Show verbatim quote (Section 5, Objective (1))
Increase from an average of 850 kg/shift to approximately 1900 kg/shift, although it is a lot, it is what the machines are designed for.
noneThroughput850 kg/shiftSingle extractor
—
Show verbatim quote (Section 3.4)
but at the end of the shift, it gets 700-800 kg (the best days, this amount means 400 cartons), so it is like less than its 40% of its capacity.
noneThroughput400 cartonsSingle extractor

Observation units

  • Fluffy line · Whole line or unspecified equipment · Baseline