Improving Production Efficiency in a Quinoa Exporting Company through an Integrated FEFO, Standardized Work, and TPM Approach

Open source

1Bibliographic record

Authors
Mario Alberto Chumbe-Sausa, Arelys Karen Casas-Apolinario, Gino Viacava-Campos, Jorge Antonio Corzo-Chávez
Year
2025
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
60 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The company analyzed in this study reports a production yield of 84.13%, which is significantly below the sector benchmark of 93.8%, resulting in a technical gap of 9.7%.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
excessive machine pressurepolishing machine
Show verbatim quote (Table 1)
Waste Rate (%) – Excessive Machine Pressure TPM 15% 5% – 11% 7% (Pilot Est.)
Process defects (scrap and rework)Defect rate15.0 %Both extractors agreed
—
Show verbatim quote (Table 1)
Production Yield (%) — 84.13% ≥ 90% 88.5% (Pilot Est.)
noneYield84.1 %Both extractors agreed
inadequate inventory rotation
Show verbatim quote (Table 1)
Reprocessing Rate – Inventory Rotation (%) FEFO 37% (311.52 tons/year) 15% (126.3 tons/year) 12% (40 tons/year)
Process defects (scrap and rework)Defect rate37.0 %Single extractor
microbiological non-conformities during raw material conditioning (initial control failures)
Show verbatim quote (Table 1)
Reprocessing Rate – Initial Control Failures (%) Standardized Work 63% (530 tons/year) 25% (210 tons/year) 24% (126 tons/year)
Process defects (scrap and rework)Defect rate63.0 %Single extractor
improper speed settingspolishing machine
Show verbatim quote (Table 1)
Broken Grain Rate (%) – Improper Speed Settings TPM 9% 3% 4.1% (Pilot Est.)
Process defects (scrap and rework)Defect rate9.00 %Single extractor
inadequate inventory rotation
Show verbatim quote (Table 1)
Reprocessing Rate – Inventory Rotation (%) FEFO 37% (311.52 tons/year) 15% (126.3 tons/year) 12% (40 tons/year)
Process defects (scrap and rework)Defect rate12.0 %Single extractor
microbiological non-conformities during raw material conditioning (initial control failures)
Show verbatim quote (Table 1)
Reprocessing Rate – Initial Control Failures (%) Standardized Work 63% (530 tons/year) 25% (210 tons/year) 24% (126 tons/year)
Process defects (scrap and rework)Defect rate24.0 %Single extractor
inadequate inventory rotation
Show verbatim quote (Page 2)
37% of reprocessing is associated with inadequate inventory rotation
Process defects (scrap and rework)Share of lost time37.0 %Single extractor
inadequate inventory rotation
Show verbatim quote (Table 1)
311.52 tons/year
Process defects (scrap and rework)Lost time312 tons/yearSingle extractor
microbiological non-conformities during raw material conditioning
Show verbatim quote (Page 2)
63% is linked to microbiological non-conformities during raw material conditioning
Process defects (scrap and rework)Share of lost time63.0 %Single extractor
microbiological non-conformities during raw material conditioning
Show verbatim quote (Table 1)
530 tons/year
Process defects (scrap and rework)Lost time530 tons/yearSingle extractor
grain breakage during polishingpolishing machine
Show verbatim quote (Page 2)
21.8 tons of grain breakage occur during the polishing stage
Process defects (scrap and rework)Lost time21.8 tons/yearSingle extractor
sack processing cycle timepolishing machine
Show verbatim quote (Page 8)
The AS IS scenario exhibited an average system time of 7.8 minutes, with a confidence interval of (7.55; 8.05)
noneMean event duration7.80 minSingle extractor
system loss (composition unspecified)polishing machine
Show verbatim quote (Page 8)
the system exhibited a mean loss rate of 15% with a wide interval of (10%; 20%)
Not classifiable from the reportShare of planned time15.0 %Single extractor
—
Show verbatim quote (Table 1)
88.5% (Pilot Est.)
noneYield88.5 %Single extractor
inadequate inventory rotation
Show verbatim quote (Table 1)
12% (40 tons/year)
Process defects (scrap and rework)Lost time40.0 tons/yearSingle extractor
microbiological non-conformities during raw material conditioning
Show verbatim quote (Table 1)
24% (126 tons/year)
Process defects (scrap and rework)Lost time126 tons/yearSingle extractor
excessive machine pressurepolishing machine
Show verbatim quote (Table 1)
7% (Pilot Est.)
Process defects (scrap and rework)Defect rate7.00 %Single extractor
improper speed settingspolishing machine
Show verbatim quote (Table 1)
4.1% (Pilot Est.)
Process defects (scrap and rework)Defect rate4.10 %Single extractor

Observation units

  • Quinoa processing line (AS-IS baseline) · Whole line or unspecified equipment · Baseline
  • Quinoa processing line (pilot, post-intervention) · Whole line or unspecified equipment · After intervention
  • Production line (AS-IS baseline) · Whole line or unspecified equipment · Baseline
  • Production line (Post-intervention pilot) · Whole line or unspecified equipment · After intervention