Included study
Improving Production Efficiency in a Quinoa Exporting Company through an Integrated FEFO, Standardized Work, and TPM Approach
1Bibliographic record
- Authors
- Mario Alberto Chumbe-Sausa, Arelys Karen Casas-Apolinario, Gino Viacava-Campos, Jorge Antonio Corzo-Chávez
- Year
- 2025
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Grain and oilseed milling
- Process family
- Slaughter, cutting and primary processing
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 60 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The company analyzed in this study reports a production yield of 84.13%, which is significantly below the sector benchmark of 93.8%, resulting in a technical gap of 9.7%.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
excessive machine pressurepolishing machineShow verbatim quote (Table 1)Waste Rate (%) – Excessive Machine Pressure TPM 15% 5% – 11% 7% (Pilot Est.) | Process defects (scrap and rework) | Defect rate | 15.0 % | Both extractors agreed |
—Show verbatim quote (Table 1)Production Yield (%) — 84.13% ≥ 90% 88.5% (Pilot Est.) | none | Yield | 84.1 % | Both extractors agreed |
inadequate inventory rotationShow verbatim quote (Table 1)Reprocessing Rate – Inventory Rotation (%) FEFO 37% (311.52 tons/year) 15% (126.3 tons/year) 12% (40 tons/year) | Process defects (scrap and rework) | Defect rate | 37.0 % | Single extractor |
microbiological non-conformities during raw material conditioning (initial control failures)Show verbatim quote (Table 1)Reprocessing Rate – Initial Control Failures (%) Standardized Work 63% (530 tons/year) 25% (210 tons/year) 24% (126 tons/year) | Process defects (scrap and rework) | Defect rate | 63.0 % | Single extractor |
improper speed settingspolishing machineShow verbatim quote (Table 1)Broken Grain Rate (%) – Improper Speed Settings TPM 9% 3% 4.1% (Pilot Est.) | Process defects (scrap and rework) | Defect rate | 9.00 % | Single extractor |
inadequate inventory rotationShow verbatim quote (Table 1)Reprocessing Rate – Inventory Rotation (%) FEFO 37% (311.52 tons/year) 15% (126.3 tons/year) 12% (40 tons/year) | Process defects (scrap and rework) | Defect rate | 12.0 % | Single extractor |
microbiological non-conformities during raw material conditioning (initial control failures)Show verbatim quote (Table 1)Reprocessing Rate – Initial Control Failures (%) Standardized Work 63% (530 tons/year) 25% (210 tons/year) 24% (126 tons/year) | Process defects (scrap and rework) | Defect rate | 24.0 % | Single extractor |
inadequate inventory rotationShow verbatim quote (Page 2)37% of reprocessing is associated with inadequate inventory rotation | Process defects (scrap and rework) | Share of lost time | 37.0 % | Single extractor |
inadequate inventory rotationShow verbatim quote (Table 1)311.52 tons/year | Process defects (scrap and rework) | Lost time | 312 tons/year | Single extractor |
microbiological non-conformities during raw material conditioningShow verbatim quote (Page 2)63% is linked to microbiological non-conformities during raw material conditioning | Process defects (scrap and rework) | Share of lost time | 63.0 % | Single extractor |
microbiological non-conformities during raw material conditioningShow verbatim quote (Table 1)530 tons/year | Process defects (scrap and rework) | Lost time | 530 tons/year | Single extractor |
grain breakage during polishingpolishing machineShow verbatim quote (Page 2)21.8 tons of grain breakage occur during the polishing stage | Process defects (scrap and rework) | Lost time | 21.8 tons/year | Single extractor |
sack processing cycle timepolishing machineShow verbatim quote (Page 8)The AS IS scenario exhibited an average system time of 7.8 minutes, with a confidence interval of (7.55; 8.05) | none | Mean event duration | 7.80 min | Single extractor |
system loss (composition unspecified)polishing machineShow verbatim quote (Page 8)the system exhibited a mean loss rate of 15% with a wide interval of (10%; 20%) | Not classifiable from the report | Share of planned time | 15.0 % | Single extractor |
—Show verbatim quote (Table 1)88.5% (Pilot Est.) | none | Yield | 88.5 % | Single extractor |
inadequate inventory rotationShow verbatim quote (Table 1)12% (40 tons/year) | Process defects (scrap and rework) | Lost time | 40.0 tons/year | Single extractor |
microbiological non-conformities during raw material conditioningShow verbatim quote (Table 1)24% (126 tons/year) | Process defects (scrap and rework) | Lost time | 126 tons/year | Single extractor |
excessive machine pressurepolishing machineShow verbatim quote (Table 1)7% (Pilot Est.) | Process defects (scrap and rework) | Defect rate | 7.00 % | Single extractor |
improper speed settingspolishing machineShow verbatim quote (Table 1)4.1% (Pilot Est.) | Process defects (scrap and rework) | Defect rate | 4.10 % | Single extractor |
Observation units
- Quinoa processing line (AS-IS baseline) · Whole line or unspecified equipment · Baseline
- Quinoa processing line (pilot, post-intervention) · Whole line or unspecified equipment · After intervention
- Production line (AS-IS baseline) · Whole line or unspecified equipment · Baseline
- Production line (Post-intervention pilot) · Whole line or unspecified equipment · After intervention