Included study
Implementasi Six Sigma untuk Meminimalisasi Reject Material Preform pada PT Z
1Bibliographic record
- Authors
- Regista Ardea Pramesti, Sukanta Sukanta, Winarno Winarno
- Year
- 2026
- Venue
- Industrika Jurnal Ilmiah Teknik Industri
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 18 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Objek penelitian ini adalah menurunkan persentase reject material preform 600 ML pada PT Z.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—preform blowing machineShow verbatim quote (Abstrak)PT Z menghadapi permasalahan reject material preform yang mencapai 4,07% pada bulan Juli 2023, setara dengan 352.875 unit cacat dari total 8.674.644 unit produksi. | Process defects (scrap and rework) | Defect rate | 4.07 % | Both extractors agreed |
—preform blowing machineShow verbatim quote (Tabel 4 / teks)Berdasarkan perhitungan pada Tabel 4 dapat dilihat bahwa DPMO sebesar 194927,79 kali per satu juta kesempatan, dengan reject material preform sebanyak 352875 dari total 8674644 material preform yang digunakan untuk proses produksi. | Process defects (scrap and rework) | Defect rate | 194,928 DPMO | Single extractor |
Proses Blowingblowing machineShow verbatim quote (Tabel 5)Proses Blowing 310042 88% 88% | Process defects (scrap and rework) | Defect rate | 88.0 % | Single extractor |
Kondisi Capcapping unitShow verbatim quote (Tabel 5)Kondisi Cap 3808 1% 89% | Process defects (scrap and rework) | Defect rate | 1.00 % | Single extractor |
Volume Kurangfilling/blowing lineShow verbatim quote (Tabel 5)Volume Kurang 24007 7% 96% | Process defects (scrap and rework) | Defect rate | 7.00 % | Single extractor |
Tanpa Capcapping unitShow verbatim quote (Tabel 5)Tanpa Cap 15018 4% 100% | Process defects (scrap and rework) | Defect rate | 4.00 % | Single extractor |
—preform blowing machineShow verbatim quote (Tabel 7)Persentase Rata –Rata Reject Preform 4.07% 1.17% 71% | Process defects (scrap and rework) | Defect rate | 1.17 % | Single extractor |
—preform blowing machineShow verbatim quote (Tabel 7)Rata - Rata DPMO 194927.79 46803.66 76% | Process defects (scrap and rework) | Defect rate | 46,804 DPMO | Single extractor |
Proses BlowingShow verbatim quote (Table 5)Proses Blowing | 310042 | 88% | 88% | Process defects (scrap and rework) | Number of events | 310,042 units | Single extractor |
Proses BlowingShow verbatim quote (Table 5)Proses Blowing | 310042 | 88% | 88% | Process defects (scrap and rework) | Share of loss events | 88.0 % | Single extractor |
Kondisi CapShow verbatim quote (Table 5)Kondisi Cap | 3808 | 1% | 89% | Process defects (scrap and rework) | Number of events | 3,808 units | Single extractor |
Kondisi CapShow verbatim quote (Table 5)Kondisi Cap | 3808 | 1% | 89% | Process defects (scrap and rework) | Share of loss events | 1.00 % | Single extractor |
Volume KurangShow verbatim quote (Table 5)Volume Kurang | 24007 | 7% | 96% | Process defects (scrap and rework) | Number of events | 24,007 units | Single extractor |
Volume KurangShow verbatim quote (Table 5)Volume Kurang | 24007 | 7% | 96% | Process defects (scrap and rework) | Share of loss events | 7.00 % | Single extractor |
Tanpa CapShow verbatim quote (Table 5)Tanpa Cap | 15018 | 4% | 100% | Process defects (scrap and rework) | Number of events | 15,018 units | Single extractor |
Tanpa CapShow verbatim quote (Table 5)Tanpa Cap | 15018 | 4% | 100% | Process defects (scrap and rework) | Share of loss events | 4.00 % | Single extractor |
Observation units
- PT Z Preform Blowing Line - Baseline (Juli 2023) · Forming, moulding and depositing · Baseline
- PT Z Preform Blowing Line - Post-intervention (November 2023) · Forming, moulding and depositing · After intervention
- PT Z Preform Production Line · Forming, moulding and depositing · Baseline