Implementasi Six Sigma untuk Meminimalisasi Reject Material Preform pada PT Z

Open source

1Bibliographic record

Authors
Regista Ardea Pramesti, Sukanta Sukanta, Winarno Winarno
Year
2026
Venue
Industrika Jurnal Ilmiah Teknik Industri
Country
Indonesia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
18 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Objek penelitian ini adalah menurunkan persentase reject material preform 600 ML pada PT Z.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—preform blowing machine
Show verbatim quote (Abstrak)
PT Z menghadapi permasalahan reject material preform yang mencapai 4,07% pada bulan Juli 2023, setara dengan 352.875 unit cacat dari total 8.674.644 unit produksi.
Process defects (scrap and rework)Defect rate4.07 %Both extractors agreed
—preform blowing machine
Show verbatim quote (Tabel 4 / teks)
Berdasarkan perhitungan pada Tabel 4 dapat dilihat bahwa DPMO sebesar 194927,79 kali per satu juta kesempatan, dengan reject material preform sebanyak 352875 dari total 8674644 material preform yang digunakan untuk proses produksi.
Process defects (scrap and rework)Defect rate194,928 DPMOSingle extractor
Proses Blowingblowing machine
Show verbatim quote (Tabel 5)
Proses Blowing 310042 88% 88%
Process defects (scrap and rework)Defect rate88.0 %Single extractor
Kondisi Capcapping unit
Show verbatim quote (Tabel 5)
Kondisi Cap 3808 1% 89%
Process defects (scrap and rework)Defect rate1.00 %Single extractor
Volume Kurangfilling/blowing line
Show verbatim quote (Tabel 5)
Volume Kurang 24007 7% 96%
Process defects (scrap and rework)Defect rate7.00 %Single extractor
Tanpa Capcapping unit
Show verbatim quote (Tabel 5)
Tanpa Cap 15018 4% 100%
Process defects (scrap and rework)Defect rate4.00 %Single extractor
—preform blowing machine
Show verbatim quote (Tabel 7)
Persentase Rata –Rata Reject Preform 4.07% 1.17% 71%
Process defects (scrap and rework)Defect rate1.17 %Single extractor
—preform blowing machine
Show verbatim quote (Tabel 7)
Rata - Rata DPMO 194927.79 46803.66 76%
Process defects (scrap and rework)Defect rate46,804 DPMOSingle extractor
Proses Blowing
Show verbatim quote (Table 5)
Proses Blowing | 310042 | 88% | 88%
Process defects (scrap and rework)Number of events310,042 unitsSingle extractor
Proses Blowing
Show verbatim quote (Table 5)
Proses Blowing | 310042 | 88% | 88%
Process defects (scrap and rework)Share of loss events88.0 %Single extractor
Kondisi Cap
Show verbatim quote (Table 5)
Kondisi Cap | 3808 | 1% | 89%
Process defects (scrap and rework)Number of events3,808 unitsSingle extractor
Kondisi Cap
Show verbatim quote (Table 5)
Kondisi Cap | 3808 | 1% | 89%
Process defects (scrap and rework)Share of loss events1.00 %Single extractor
Volume Kurang
Show verbatim quote (Table 5)
Volume Kurang | 24007 | 7% | 96%
Process defects (scrap and rework)Number of events24,007 unitsSingle extractor
Volume Kurang
Show verbatim quote (Table 5)
Volume Kurang | 24007 | 7% | 96%
Process defects (scrap and rework)Share of loss events7.00 %Single extractor
Tanpa Cap
Show verbatim quote (Table 5)
Tanpa Cap | 15018 | 4% | 100%
Process defects (scrap and rework)Number of events15,018 unitsSingle extractor
Tanpa Cap
Show verbatim quote (Table 5)
Tanpa Cap | 15018 | 4% | 100%
Process defects (scrap and rework)Share of loss events4.00 %Single extractor

Observation units

  • PT Z Preform Blowing Line - Baseline (Juli 2023) · Forming, moulding and depositing · Baseline
  • PT Z Preform Blowing Line - Post-intervention (November 2023) · Forming, moulding and depositing · After intervention
  • PT Z Preform Production Line · Forming, moulding and depositing · Baseline