Enterprise Resource Planning System Integrated with Overall Equipment Effectiveness for Enhanced Performance Tracking Metrics: Mixed-Methods Case Study of a Nigerian Feed Mill

Open source

1Bibliographic record

Authors
M.K. Oluwanimifise, Christopher Osita Anyaeche
Year
2026
Venue
—
Country
Nigeria
Segment
Animal feed and pet food
Process family
Whole plant or unspecified
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
365 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The feed mill is a large-scale commercial feed mill with three production plants within a single industrial complex in Ibadan, Oyo State, Nigeria.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Target achieve
Show verbatim quote (Table 2)
1 Target achieve 734.34 54.72 54.72 Vital few
Not classifiable from the reportShare of lost time54.7 %Adjudicated
Target achieve
Show verbatim quote (Table 2)
1 Target achieve 734.34 54.72 54.72 Vital few
Not classifiable from the reportLost time734 hrsAdjudicated
Preventive maintenance
Show verbatim quote (Table 2)
2 Preventive maintenance 423.00 31.52 86.24 Vital few
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time31.5 %Both extractors agreed
Preventive maintenance
Show verbatim quote (Table 2)
2 Preventive maintenance 423.00 31.52 86.24 Vital few
Planned downtime (scheduled maintenance, breaks, no demand)Lost time423 hrsBoth extractors agreed
Production change
Show verbatim quote (Table 2)
5 Production change 34.76 2.59 100.00 Trivial many
Setup and adjustmentsShare of lost time2.59 %Both extractors agreed
Production change
Show verbatim quote (Table 2)
5 Production change 34.76 2.59 100.00 Trivial many
Setup and adjustmentsLost time34.8 hrsBoth extractors agreed
Workers' shortage
Show verbatim quote (Table 2)
4 Workers' shortage 74.00 5.51 97.41 Trivial many
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time5.51 %Both extractors agreed
Workers' shortage
Show verbatim quote (Table 2)
4 Workers' shortage 74.00 5.51 97.41 Trivial many
Organizational or external stops (material or personnel shortage, utilities outage)Lost time74.0 hrsBoth extractors agreed
Raw materials shortage
Show verbatim quote (Table 2)
3 Raw materials shortage 76.00 5.66 91.90 Trivial many
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time5.66 %Both extractors agreed
Raw materials shortage
Show verbatim quote (Table 2)
3 Raw materials shortage 76.00 5.66 91.90 Trivial many
Organizational or external stops (material or personnel shortage, utilities outage)Lost time76.0 hrsBoth extractors agreed
—Feeding section
Show verbatim quote (Table 1)
Feeding 40 37 32.3 87.29
noneThroughput32.3 Ton/daySingle extractor
—Feeding section
Show verbatim quote (Table 1)
Feeding 40 37 32.3 87.29
noneSpeed ratio87.3 %Single extractor
—Batching section
Show verbatim quote (Table 1)
Batching 40 37 31.8 85.94
noneThroughput31.8 Ton/daySingle extractor
—Batching section
Show verbatim quote (Table 1)
Batching 40 37 31.8 85.94
noneSpeed ratio85.9 %Single extractor
—Grinding section
Show verbatim quote (Table 1)
Grinding 45 37 31.3 84.59
noneThroughput31.3 Ton/daySingle extractor
—Grinding section
Show verbatim quote (Table 1)
Grinding 45 37 31.3 84.59
noneSpeed ratio84.6 %Single extractor
—Pelletising section
Show verbatim quote (Table 1)
Pelletising 45 37 31.5 85.13
noneThroughput31.5 Ton/daySingle extractor
—Pelletising section
Show verbatim quote (Table 1)
Pelletising 45 37 31.5 85.13
noneSpeed ratio85.1 %Single extractor
—Bagging section
Show verbatim quote (Table 1)
Bagging 40 37 31.7 85.67
noneThroughput31.7 Ton/daySingle extractor
—Bagging section
Show verbatim quote (Table 1)
Bagging 40 37 31.7 85.67
noneSpeed ratio85.7 %Single extractor
—
Show verbatim quote (Table 3)
OEE 85.0 70.749 14.251
noneOEE70.7 %Single extractor
—
Show verbatim quote (Table 3)
Availability 90.0 85.511 4.489
noneAvailability85.5 %Single extractor
—
Show verbatim quote (Table 3)
Performance 95.0 84.598 10.402
nonePerformance84.6 %Single extractor
—
Show verbatim quote (Table 3)
Quality 99.9 97.800 2.100
noneQuality97.8 %Single extractor

Observation units

  • Whole plant · Whole line or unspecified equipment · Baseline
  • Feeding section · Conveying and accumulation · Baseline
  • Batching section · Mixing and blending · Baseline
  • Grinding section · Milling and grinding · Baseline
  • Pelletising section · Forming, moulding and depositing · Baseline
  • Bagging section · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline