Included study
Enterprise Resource Planning System Integrated with Overall Equipment Effectiveness for Enhanced Performance Tracking Metrics: Mixed-Methods Case Study of a Nigerian Feed Mill
1Bibliographic record
- Authors
- M.K. Oluwanimifise, Christopher Osita Anyaeche
- Year
- 2026
- Venue
- —
- Country
- Nigeria
- Segment
- Animal feed and pet food
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The feed mill is a large-scale commercial feed mill with three production plants within a single industrial complex in Ibadan, Oyo State, Nigeria.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Target achieveShow verbatim quote (Table 2)1 Target achieve 734.34 54.72 54.72 Vital few | Not classifiable from the report | Share of lost time | 54.7 % | Adjudicated |
Target achieveShow verbatim quote (Table 2)1 Target achieve 734.34 54.72 54.72 Vital few | Not classifiable from the report | Lost time | 734 hrs | Adjudicated |
Preventive maintenanceShow verbatim quote (Table 2)2 Preventive maintenance 423.00 31.52 86.24 Vital few | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 31.5 % | Both extractors agreed |
Preventive maintenanceShow verbatim quote (Table 2)2 Preventive maintenance 423.00 31.52 86.24 Vital few | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 423 hrs | Both extractors agreed |
Production changeShow verbatim quote (Table 2)5 Production change 34.76 2.59 100.00 Trivial many | Setup and adjustments | Share of lost time | 2.59 % | Both extractors agreed |
Production changeShow verbatim quote (Table 2)5 Production change 34.76 2.59 100.00 Trivial many | Setup and adjustments | Lost time | 34.8 hrs | Both extractors agreed |
Workers' shortageShow verbatim quote (Table 2)4 Workers' shortage 74.00 5.51 97.41 Trivial many | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 5.51 % | Both extractors agreed |
Workers' shortageShow verbatim quote (Table 2)4 Workers' shortage 74.00 5.51 97.41 Trivial many | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 74.0 hrs | Both extractors agreed |
Raw materials shortageShow verbatim quote (Table 2)3 Raw materials shortage 76.00 5.66 91.90 Trivial many | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 5.66 % | Both extractors agreed |
Raw materials shortageShow verbatim quote (Table 2)3 Raw materials shortage 76.00 5.66 91.90 Trivial many | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 76.0 hrs | Both extractors agreed |
—Feeding sectionShow verbatim quote (Table 1)Feeding 40 37 32.3 87.29 | none | Throughput | 32.3 Ton/day | Single extractor |
—Feeding sectionShow verbatim quote (Table 1)Feeding 40 37 32.3 87.29 | none | Speed ratio | 87.3 % | Single extractor |
—Batching sectionShow verbatim quote (Table 1)Batching 40 37 31.8 85.94 | none | Throughput | 31.8 Ton/day | Single extractor |
—Batching sectionShow verbatim quote (Table 1)Batching 40 37 31.8 85.94 | none | Speed ratio | 85.9 % | Single extractor |
—Grinding sectionShow verbatim quote (Table 1)Grinding 45 37 31.3 84.59 | none | Throughput | 31.3 Ton/day | Single extractor |
—Grinding sectionShow verbatim quote (Table 1)Grinding 45 37 31.3 84.59 | none | Speed ratio | 84.6 % | Single extractor |
—Pelletising sectionShow verbatim quote (Table 1)Pelletising 45 37 31.5 85.13 | none | Throughput | 31.5 Ton/day | Single extractor |
—Pelletising sectionShow verbatim quote (Table 1)Pelletising 45 37 31.5 85.13 | none | Speed ratio | 85.1 % | Single extractor |
—Bagging sectionShow verbatim quote (Table 1)Bagging 40 37 31.7 85.67 | none | Throughput | 31.7 Ton/day | Single extractor |
—Bagging sectionShow verbatim quote (Table 1)Bagging 40 37 31.7 85.67 | none | Speed ratio | 85.7 % | Single extractor |
—Show verbatim quote (Table 3)OEE 85.0 70.749 14.251 | none | OEE | 70.7 % | Single extractor |
—Show verbatim quote (Table 3)Availability 90.0 85.511 4.489 | none | Availability | 85.5 % | Single extractor |
—Show verbatim quote (Table 3)Performance 95.0 84.598 10.402 | none | Performance | 84.6 % | Single extractor |
—Show verbatim quote (Table 3)Quality 99.9 97.800 2.100 | none | Quality | 97.8 % | Single extractor |
Observation units
- Whole plant · Whole line or unspecified equipment · Baseline
- Feeding section · Conveying and accumulation · Baseline
- Batching section · Mixing and blending · Baseline
- Grinding section · Milling and grinding · Baseline
- Pelletising section · Forming, moulding and depositing · Baseline
- Bagging section · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline