In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 3 of the 127 studies that could observe it (limited evidence).
What happens
The line or machine is deliberately stopped according to a maintenance plan so that technicians can inspect, lubricate, adjust or replace components before they fail, rather than in response to an actual breakdown. The stop is scheduled in advance and is not triggered by a process deviation or equipment fault.
What is done about it
Optimise the preventive maintenance schedule and task scope using reliability data (e.g., condition-based or predictive triggers) so that intervention windows are as short and infrequent as possible while still preventing failures. Coordinate maintenance windows across the line and use quick-change or modular components to minimise the duration of each planned stop.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.2–1.9%]
- Expected share of lost time
- 0.4% [0.1–1.1%]
- Share of lost time when present
- 57% [46–67%]
- Studies / units
- 127 / 161
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–3.0%]13 studies
- Soft drinks, bottled water and juices1.0% [0.2–3.1%]26 studies
- Brewing, wine and spirits0.9% [0.1–3.0%]11 studies
- Bakery and pasta0.7% [0.1–2.5%]24 studies
- Meat, poultry and seafood0.8% [0.1–3.0%]9 studies
- Fruit and vegetable processing0.9% [0.1–2.9%]7 studies
- Grain and oilseed milling0.9% [0.1–3.3%]6 studies
- Sugar and confectionery0.8% [0.1–2.9%]9 studies
- Snacks, coffee, tea and other foods0.9% [0.1–3.1%]5 studies
- Animal feed and pet food1.3% [0.2–4.5%]7 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–3.0%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line or machine is deliberately stopped according to a maintenance plan so that technicians can inspect, lubricate, adjust or replace components before they fail, rather than in response to an actual breakdown. The stop is scheduled in advance and is not triggered by a process deviation or equipment fault.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show a machine-state transition to a planned stop or maintenance state, often linked to a work order ID, occurring at a predictable time window with no preceding alarm cascade. Downstream and upstream equipment typically show a coordinated, scheduled idle or starved/blocked state rather than an abrupt unplanned trip.
Countermeasure
Engineering guidanceOptimise the preventive maintenance schedule and task scope using reliability data (e.g., condition-based or predictive triggers) so that intervention windows are as short and infrequent as possible while still preventing failures. Coordinate maintenance windows across the line and use quick-change or modular components to minimise the duration of each planned stop.
4Sources
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 12.0 h · as reported: “Hours of preventive maintenance (scheduled), Month 2”
Show verbatim quote
Month 2 12.00 20.00 8.00
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 14.0 h · as reported: “Hours of preventive maintenance (scheduled), Month 1”
Show verbatim quote
Month 1 14.00 25.00 11.00
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 20.0 h · as reported: “Hours of factual preventive maintenance, Month 2”
Show verbatim quote
Month 2 12.00 20.00 8.00
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 25.0 h · as reported: “Hours of factual preventive maintenance, Month 1”
Show verbatim quote
Month 1 14.00 25.00 11.00
- Analisis Pengukuran Nilai Overall Equipment Effectiveness (OEE) Pada Mesin Rice Milling Unit (RMU) di PT. FSTJ (2023)Open sourceShare of planned time: 2.89 % · as reported: “Preventive Maintenance”
Show verbatim quote
Jika kita lihat total waktu Preventive Maintenance (PM) selama 1.905 menit terhadap waktu operasional yang 65.880 menit atau 2,89% dari waktu operasional dan waktu setup 1,890 menit atau 2,87% dari waktu operasional
- Analisis Pengukuran Nilai Overall Equipment Effectiveness (OEE) Pada Mesin Rice Milling Unit (RMU) di PT. FSTJ (2023)Open sourceLost time: 1,905 min · as reported: “Preventive Maintenance”
Show verbatim quote
Selama rentang waktu tersebut waktu operasional adalah 65.880 menit, preventive maintenance 1.905 menit, setup 1.890 menit dan breakdown 960 menit , maka persen availabilitynya adalah
- Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies (2024)Open sourceLost time: 25.0 h · as reported: “Hours of factual preventive maintenance - Month 1”
Show verbatim quote
Month 1 14.00 25.00 11.00
- Increase of the Availability of Machinery in a Food Company Applying the TPM, SMED and RCM Methodologies (2024)Open sourceLost time: 20.0 h · as reported: “Hours of factual preventive maintenance - Month 2”
Show verbatim quote
Month 2 12.00 20.00 8.00
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 2.38 h · as reported: “preventive maintenance”
Show verbatim quote
the preventive maintenance MTTR decreased from 3.38 h to 2.38 h
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 3.38 h · as reported: “preventive maintenance”
Show verbatim quote
the preventive maintenance MTTR decreased from 3.38 h to 2.38 h
- Enterprise Resource Planning System Integrated with Overall Equipment Effectiveness for Enhanced Performance Tracking Metrics: Mixed-Methods Case Study of a Nigerian Feed Mill (2026)Open sourceShare of lost time: 31.5 % · as reported: “Preventive maintenance”
Show verbatim quote
2 Preventive maintenance 423.00 31.52 86.24 Vital few
- Enterprise Resource Planning System Integrated with Overall Equipment Effectiveness for Enhanced Performance Tracking Metrics: Mixed-Methods Case Study of a Nigerian Feed Mill (2026)Open sourceLost time: 423 hrs · as reported: “Preventive maintenance”
Show verbatim quote
2 Preventive maintenance 423.00 31.52 86.24 Vital few
- COMPARATIVE ANALYSIS OF PRODUCTION LINE EFFICIENCY UNDER VARYING DEMAND SCENARIOS USING MULTILAYER PERCEPTRON (2026)Open sourceLost time: 10.0 hrs · as reported: “Preventive maintenance”
Show verbatim quote
Filler Machine Line 1 Preventive Jan 10 2.5 1.2 ₦250,000 3.0
- COMPARATIVE ANALYSIS OF PRODUCTION LINE EFFICIENCY UNDER VARYING DEMAND SCENARIOS USING MULTILAYER PERCEPTRON (2026)Open sourceLost time: 8.00 hrs · as reported: “Preventive maintenance”
Show verbatim quote
Labeller Line 3 Preventive Mar 8 1.5 1.0 ₦185,000 2.0