Analisis Quality Control Circle (QCC) dan Quality Loss Function (QLF) Dalam Upaya Meminimalkan Tingkat Kerusakan Kemasan

Open source

1Bibliographic record

Authors
Susilo Adhi, Andhika Mayasari, Sulung Rahmawan Wira Ghani, Nur Muflihah
Year
2025
Venue
Jurnal Penelitian Bidang Inovasi & Pengelolaan Industri
DOI
—
Country
Indonesia
Segment
Snacks, coffee, tea and other foods
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
135 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
CV.XYZ sebagai mitra dari beberapa partner, menghadapi persoalan terkait tingginya tingkat kerusakan kemasan pada produk kualitas kemasan yang melampaui batas toleransi mencapai 11,01%

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Center seal detached (center seal lekang)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events10.3 %Both extractors agreed
Long seal detached (longseal lekang)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events9.30 %Both extractors agreed
Wrinkled seal (seal berkerut)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events7.40 %Both extractors agreed
Slip packaging (kemasan selip)
Show verbatim quote (Hasil dan Pembahasan - Check Sheet)
Data menunjukkan bahwa jenis kerusakan dengan frekuensi tertinggi selama periode Juli hingga November 2024 adalah kemasan melipat 406 bungkus, kemasan selip sebesar 357 bungkus, dan kemasan jepret sesbesar 390 bungkus.
Process defects (scrap and rework)Number of events357 bungkusBoth extractors agreed
Slip packaging (kemasan selip)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events16.7 %Both extractors agreed
Folding packaging (kemasan melipat)
Show verbatim quote (Hasil dan Pembahasan - Check Sheet)
Data menunjukkan bahwa jenis kerusakan dengan frekuensi tertinggi selama periode Juli hingga November 2024 adalah kemasan melipat 406 bungkus, kemasan selip sebesar 357 bungkus, dan kemasan jepret sesbesar 390 bungkus.
Process defects (scrap and rework)Number of events406 bungkusBoth extractors agreed
Folding packaging (kemasan melipat)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events17.4 %Both extractors agreed
Has a splice/joint (ada sambungan)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events7.00 %Both extractors agreed
Snap packaging (kemasan jepret)
Show verbatim quote (Hasil dan Pembahasan - Check Sheet)
Data menunjukkan bahwa jenis kerusakan dengan frekuensi tertinggi selama periode Juli hingga November 2024 adalah kemasan melipat 406 bungkus, kemasan selip sebesar 357 bungkus, dan kemasan jepret sesbesar 390 bungkus.
Process defects (scrap and rework)Number of events390 bungkusBoth extractors agreed
Snap packaging (kemasan jepret)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events15.3 %Both extractors agreed
Missing coding (koding hilang)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events8.80 %Both extractors agreed
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Gambar 3 Diagram Pareto Kerusakan Kemasan)
Diketahui bahwa kerusakan kemasan pada jenis kemasan melipat sebesar 17.4%, jenis kemasan selip 16.7%, jenis kemasan jepret 15.3%, center seal lekang 10.3%, longseal lekang 9.3%, koding hilang 8.8% kemasan acak 7.7%, seal berkerut 7.4%, ada sambungan 7.0%.
Process defects (scrap and rework)Share of loss events7.70 %Both extractors agreed
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
Juli 2580 351 5.34% 2%
Process defects (scrap and rework)Defect rate5.34 %Single extractor
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
Agustus 5850 960 8.03% 2%
Process defects (scrap and rework)Defect rate8.03 %Single extractor
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
September 6810 115 5.82% 2%
Process defects (scrap and rework)Defect rate5.82 %Single extractor
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
Oktober 1045 154 4.39% 2%
Process defects (scrap and rework)Defect rate4.39 %Single extractor
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
November 4870 750 5.21% 2%
Process defects (scrap and rework)Defect rate5.21 %Single extractor
—
Show verbatim quote (Tabel 1. Data Produksi dan Kerusakan Kemasan)
Rata-rata 4231 466 11.01%
Process defects (scrap and rework)Defect rate11.0 %Single extractor
—
Show verbatim quote (Tabel 3 Stratifikasi)
Juli 2024 31 2580 350 83,2 11,3 13,57
Process defects (scrap and rework)Defect rate13.6 %Single extractor
—
Show verbatim quote (Tabel 3 Stratifikasi)
Agustus 2024 31 5850 960 188,7 31,0 16,41
Process defects (scrap and rework)Defect rate16.4 %Single extractor
—
Show verbatim quote (Tabel 3 Stratifikasi)
September 2024 30 6774 115 225,8 3,8 1,70
Process defects (scrap and rework)Defect rate1.70 %Single extractor
—
Show verbatim quote (Tabel 3 Stratifikasi)
Oktober 2024 14 1045 154 74,6 11,0 14,74
Process defects (scrap and rework)Defect rate14.7 %Single extractor
—
Show verbatim quote (Tabel 3 Stratifikasi)
November 2024 29 4870 675 167,9 23,3 13,86
Process defects (scrap and rework)Defect rate13.9 %Single extractor
—
Show verbatim quote (Tabel 5 Perhitungan Quality Loss Function)
Juli 2024 2580 351 0.136 172.43 Rp 60.522.70
Process defects (scrap and rework)Defect rate0.136 %Single extractor
—
Show verbatim quote (Tabel 5 Perhitungan Quality Loss Function)
Agustus 2024 5850 960 0.164 214.97 Rp 206.370.55
Process defects (scrap and rework)Defect rate0.164 %Single extractor
—
Show verbatim quote (Tabel 5 Perhitungan Quality Loss Function)
September 2024 6810 115 0.017 18.81 Rp 2.163.01
Process defects (scrap and rework)Defect rate0.0170 %Single extractor
—
Show verbatim quote (Tabel 5 Perhitungan Quality Loss Function)
Oktober 2024 1045 154 0.147 189.26 Rp 29.145.93
Process defects (scrap and rework)Defect rate0.147 %Single extractor
—
Show verbatim quote (Tabel 5 Perhitungan Quality Loss Function)
November 2024 4870 750 0.154 199.33 Rp 149.499.39
Process defects (scrap and rework)Defect rate0.154 %Single extractor
Folding packaging (kemasan melipat)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Kemasan Melipat 64 151 20 33 138
Process defects (scrap and rework)Number of events64.0 bungkusSingle extractor
Folding packaging (kemasan melipat)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Kemasan Melipat 64 151 20 33 138
Process defects (scrap and rework)Number of events151 bungkusSingle extractor
Folding packaging (kemasan melipat)
Show verbatim quote (Tabel 2. Check Sheet (September))
Kemasan Melipat 64 151 20 33 138
Process defects (scrap and rework)Number of events20.0 bungkusSingle extractor
Folding packaging (kemasan melipat)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Kemasan Melipat 64 151 20 33 138
Process defects (scrap and rework)Number of events33.0 bungkusSingle extractor
Folding packaging (kemasan melipat)
Show verbatim quote (Tabel 2. Check Sheet (November))
Kemasan Melipat 64 151 20 33 138
Process defects (scrap and rework)Number of events138 bungkusSingle extractor
Wrinkled seal (seal berkerut)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Seal Berkerut 32 90 6 6 38
Process defects (scrap and rework)Number of events32.0 bungkusSingle extractor
Wrinkled seal (seal berkerut)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Seal Berkerut 32 90 6 6 38
Process defects (scrap and rework)Number of events90.0 bungkusSingle extractor
Wrinkled seal (seal berkerut)
Show verbatim quote (Tabel 2. Check Sheet (September))
Seal Berkerut 32 90 6 6 38
Process defects (scrap and rework)Number of events6.00 bungkusSingle extractor
Wrinkled seal (seal berkerut)
Show verbatim quote (Tabel 2. Check Sheet (November))
Seal Berkerut 32 90 6 6 38
Process defects (scrap and rework)Number of events38.0 bungkusSingle extractor
Missing coding (koding hilang)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Koding Hilang 30 85 9 10 71
Process defects (scrap and rework)Number of events30.0 bungkusSingle extractor
Missing coding (koding hilang)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Koding Hilang 30 85 9 10 71
Process defects (scrap and rework)Number of events85.0 bungkusSingle extractor
Missing coding (koding hilang)
Show verbatim quote (Tabel 2. Check Sheet (September))
Koding Hilang 30 85 9 10 71
Process defects (scrap and rework)Number of events9.00 bungkusSingle extractor
Missing coding (koding hilang)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Koding Hilang 30 85 9 10 71
Process defects (scrap and rework)Number of events10.0 bungkusSingle extractor
Missing coding (koding hilang)
Show verbatim quote (Tabel 2. Check Sheet (November))
Koding Hilang 30 85 9 10 71
Process defects (scrap and rework)Number of events71.0 bungkusSingle extractor
Snap packaging (kemasan jepret)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Kemasan Jepret 49 139 22 26 154
Process defects (scrap and rework)Number of events49.0 bungkusSingle extractor
Snap packaging (kemasan jepret)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Kemasan Jepret 49 139 22 26 154
Process defects (scrap and rework)Number of events139 bungkusSingle extractor
Snap packaging (kemasan jepret)
Show verbatim quote (Tabel 2. Check Sheet (September))
Kemasan Jepret 49 139 22 26 154
Process defects (scrap and rework)Number of events22.0 bungkusSingle extractor
Snap packaging (kemasan jepret)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Kemasan Jepret 49 139 22 26 154
Process defects (scrap and rework)Number of events26.0 bungkusSingle extractor
Snap packaging (kemasan jepret)
Show verbatim quote (Tabel 2. Check Sheet (November))
Kemasan Jepret 49 139 22 26 154
Process defects (scrap and rework)Number of events154 bungkusSingle extractor
Center seal detached (center seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Center Seal Lekang 29 97 16 20 78
Process defects (scrap and rework)Number of events29.0 bungkusSingle extractor
Center seal detached (center seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Center Seal Lekang 29 97 16 20 78
Process defects (scrap and rework)Number of events97.0 bungkusSingle extractor
Center seal detached (center seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (September))
Center Seal Lekang 29 97 16 20 78
Process defects (scrap and rework)Number of events16.0 bungkusSingle extractor
Center seal detached (center seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Center Seal Lekang 29 97 16 20 78
Process defects (scrap and rework)Number of events20.0 bungkusSingle extractor
Center seal detached (center seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (November))
Center Seal Lekang 29 97 16 20 78
Process defects (scrap and rework)Number of events78.0 bungkusSingle extractor
Slip packaging (kemasan selip)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Kemasan Selip 57 121 22 30 127
Process defects (scrap and rework)Number of events57.0 bungkusSingle extractor
Slip packaging (kemasan selip)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Kemasan Selip 57 121 22 30 127
Process defects (scrap and rework)Number of events121 bungkusSingle extractor
Slip packaging (kemasan selip)
Show verbatim quote (Tabel 2. Check Sheet (September))
Kemasan Selip 57 121 22 30 127
Process defects (scrap and rework)Number of events22.0 bungkusSingle extractor
Slip packaging (kemasan selip)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Kemasan Selip 57 121 22 30 127
Process defects (scrap and rework)Number of events30.0 bungkusSingle extractor
Slip packaging (kemasan selip)
Show verbatim quote (Tabel 2. Check Sheet (November))
Kemasan Selip 57 121 22 30 127
Process defects (scrap and rework)Number of events127 bungkusSingle extractor
Long seal detached (long seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Long Seal Lekang 35 90 8 15 69
Process defects (scrap and rework)Number of events35.0 bungkusSingle extractor
Long seal detached (long seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Long Seal Lekang 35 90 8 15 69
Process defects (scrap and rework)Number of events90.0 bungkusSingle extractor
Long seal detached (long seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (September))
Long Seal Lekang 35 90 8 15 69
Process defects (scrap and rework)Number of events8.00 bungkusSingle extractor
Long seal detached (long seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Long Seal Lekang 35 90 8 15 69
Process defects (scrap and rework)Number of events15.0 bungkusSingle extractor
Long seal detached (long seal lekang)
Show verbatim quote (Tabel 2. Check Sheet (November))
Long Seal Lekang 35 90 8 15 69
Process defects (scrap and rework)Number of events69.0 bungkusSingle extractor
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Kemasan Acak 18 88 4 9 44
Process defects (scrap and rework)Number of events18.0 bungkusSingle extractor
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Kemasan Acak 18 88 4 9 44
Process defects (scrap and rework)Number of events88.0 bungkusSingle extractor
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Tabel 2. Check Sheet (September))
Kemasan Acak 18 88 4 9 44
Process defects (scrap and rework)Number of events4.00 bungkusSingle extractor
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Kemasan Acak 18 88 4 9 44
Process defects (scrap and rework)Number of events9.00 bungkusSingle extractor
Random/misaligned packaging (kemasan acak)
Show verbatim quote (Tabel 2. Check Sheet (November))
Kemasan Acak 18 88 4 9 44
Process defects (scrap and rework)Number of events44.0 bungkusSingle extractor
Has a splice/joint (ada sambungan)
Show verbatim quote (Tabel 2. Check Sheet (Juli))
Ada Sambungan 37 99 8 5 31
Process defects (scrap and rework)Number of events37.0 bungkusSingle extractor
Has a splice/joint (ada sambungan)
Show verbatim quote (Tabel 2. Check Sheet (Agustus))
Ada Sambungan 37 99 8 5 31
Process defects (scrap and rework)Number of events99.0 bungkusSingle extractor
Has a splice/joint (ada sambungan)
Show verbatim quote (Tabel 2. Check Sheet (September))
Ada Sambungan 37 99 8 5 31
Process defects (scrap and rework)Number of events8.00 bungkusSingle extractor
Has a splice/joint (ada sambungan)
Show verbatim quote (Tabel 2. Check Sheet (Oktober))
Ada Sambungan 37 99 8 5 31
Process defects (scrap and rework)Number of events5.00 bungkusSingle extractor
Has a splice/joint (ada sambungan)
Show verbatim quote (Tabel 2. Check Sheet (November))
Ada Sambungan 37 99 8 5 31
Process defects (scrap and rework)Number of events31.0 bungkusSingle extractor

Observation units

  • CV.XYZ packaging line · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline