foratvise
Get Started
Included study

Improving Production Efficiency in a Chocolate SME through Continuous Flow, SMED and Poka-Yoke

Open source

1Bibliographic record

Authors
Camila Panta-Mejia, Katya Pino-Ore, Gino Viacava-Campos, Jorge Antonio Corzo-Chávez
Year
2026
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Sugar and confectionery
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
35 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Artisanal plants continue to face recurring failures such as thermal variability during tempering, inaccurate filling of buffer tanks, reprocessing in molding, and excessive changeover times that compromise product quality and restrict productive capacity.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
operational interruptions during mold changeovermold
Show verbatim quote (Section 5.1, Improvement 1)
As-Is interruptions: 10 per week → 1 per week
Setup and adjustmentsNumber of events10.0 events/weekBoth extractors agreed
manual chocolate transferbuffer tank / transfer line
Show verbatim quote (Section 5.1, Improvement 2)
Problem addressed: 180-minute manual transfer, temperature fluctuations, risk of spills, and WIP accumulation.
Not classifiable from the reportLost time180 minAdjudicated
—
Show verbatim quote (Abstract)
The plant analyzed in this study operates at only 39.28% real efficiency, evidencing structural gaps in flow synchronization, standardization, and control of critical variables.
noneOEE39.3 %Both extractors agreed
operational interruptions during mold changeovermold
Show verbatim quote (Section 5.2 (Operational records and timing, 5 weeks))
Week 5: 1 interruption
Setup and adjustmentsNumber of events1.00 events/weekBoth extractors agreed
overfillingbuffer tank
Show verbatim quote (Section 5.1, Improvement 3)
Overfilling: 40% → 6%
Process defects (scrap and rework)Defect rate40.0 %Both extractors agreed
operational interruptions during mold changeovermold
Show verbatim quote (Section 5.2 (Operational records and timing, 5 weeks))
Week 1: 5 interruptions
Setup and adjustmentsNumber of events5.00 events/weekSingle extractor
operational interruptions during mold changeovermold
Show verbatim quote (Figure 8 caption)
Weeks 2, 3, and 4 stabilized at three interruptions each, showing improved workflow continuity and reduced operational stops.
Setup and adjustmentsNumber of events3.00 events/weekSingle extractor
reprocessingbuffer tank / molding
Show verbatim quote (Section 5.1, Improvement 3)
Reprocessing: 25% → 5%
Process defects (scrap and rework)Defect rate25.0 %Single extractor
overfillingbuffer tank
Show verbatim quote (Section 5.1, Improvement 3)
Overfilling: 40% → 6%
Process defects (scrap and rework)Defect rate6.00 %Single extractor
reprocessingbuffer tank / molding
Show verbatim quote (Section 5.1, Improvement 3)
Reprocessing: 25% → 5%
Process defects (scrap and rework)Defect rate5.00 %Single extractor
thermal variability during tempering, inaccurate filling
Show verbatim quote (Table 2, page 217)
Reprocessing overall | 25%
Process defects (scrap and rework)Defect rate25.0 %Single extractor
reduced thermal variability, improved filling control
Show verbatim quote (Table 2, page 217)
Reprocessing overall | 5%
Process defects (scrap and rework)Defect rate5.00 %Single extractor

Observation units

  • Mold changeover (SMED) · Forming, moulding and depositing · Baseline
  • Chocolate production line (whole process) · Whole line or unspecified equipment · Baseline
  • Mold changeover (SMED) · Forming, moulding and depositing · After intervention
  • Buffer tank (tempering buffer) · Whole line or unspecified equipment · Baseline
  • Buffer tank (tempering buffer) · Whole line or unspecified equipment · After intervention
  • Chocolate Production Plant · Whole line or unspecified equipment · Baseline
  • Chocolate Production Plant · Whole line or unspecified equipment · After intervention