Included study
Improving Production Efficiency in a Chocolate SME through Continuous Flow, SMED and Poka-Yoke
1Bibliographic record
- Authors
- Camila Panta-Mejia, Katya Pino-Ore, Gino Viacava-Campos, Jorge Antonio Corzo-Chávez
- Year
- 2026
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Sugar and confectionery
- Process family
- Forming, baking and cooking
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 35 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Artisanal plants continue to face recurring failures such as thermal variability during tempering, inaccurate filling of buffer tanks, reprocessing in molding, and excessive changeover times that compromise product quality and restrict productive capacity.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
operational interruptions during mold changeovermoldShow verbatim quote (Section 5.1, Improvement 1)As-Is interruptions: 10 per week → 1 per week | Setup and adjustments | Number of events | 10.0 events/week | Both extractors agreed |
manual chocolate transferbuffer tank / transfer lineShow verbatim quote (Section 5.1, Improvement 2)Problem addressed: 180-minute manual transfer, temperature fluctuations, risk of spills, and WIP accumulation. | Not classifiable from the report | Lost time | 180 min | Adjudicated |
—Show verbatim quote (Abstract)The plant analyzed in this study operates at only 39.28% real efficiency, evidencing structural gaps in flow synchronization, standardization, and control of critical variables. | none | OEE | 39.3 % | Both extractors agreed |
operational interruptions during mold changeovermoldShow verbatim quote (Section 5.2 (Operational records and timing, 5 weeks))Week 5: 1 interruption | Setup and adjustments | Number of events | 1.00 events/week | Both extractors agreed |
overfillingbuffer tankShow verbatim quote (Section 5.1, Improvement 3)Overfilling: 40% → 6% | Process defects (scrap and rework) | Defect rate | 40.0 % | Both extractors agreed |
operational interruptions during mold changeovermoldShow verbatim quote (Section 5.2 (Operational records and timing, 5 weeks))Week 1: 5 interruptions | Setup and adjustments | Number of events | 5.00 events/week | Single extractor |
operational interruptions during mold changeovermoldShow verbatim quote (Figure 8 caption)Weeks 2, 3, and 4 stabilized at three interruptions each, showing improved workflow continuity and reduced operational stops. | Setup and adjustments | Number of events | 3.00 events/week | Single extractor |
reprocessingbuffer tank / moldingShow verbatim quote (Section 5.1, Improvement 3)Reprocessing: 25% → 5% | Process defects (scrap and rework) | Defect rate | 25.0 % | Single extractor |
overfillingbuffer tankShow verbatim quote (Section 5.1, Improvement 3)Overfilling: 40% → 6% | Process defects (scrap and rework) | Defect rate | 6.00 % | Single extractor |
reprocessingbuffer tank / moldingShow verbatim quote (Section 5.1, Improvement 3)Reprocessing: 25% → 5% | Process defects (scrap and rework) | Defect rate | 5.00 % | Single extractor |
thermal variability during tempering, inaccurate fillingShow verbatim quote (Table 2, page 217)Reprocessing overall | 25% | Process defects (scrap and rework) | Defect rate | 25.0 % | Single extractor |
reduced thermal variability, improved filling controlShow verbatim quote (Table 2, page 217)Reprocessing overall | 5% | Process defects (scrap and rework) | Defect rate | 5.00 % | Single extractor |
Observation units
- Mold changeover (SMED) · Forming, moulding and depositing · Baseline
- Chocolate production line (whole process) · Whole line or unspecified equipment · Baseline
- Mold changeover (SMED) · Forming, moulding and depositing · After intervention
- Buffer tank (tempering buffer) · Whole line or unspecified equipment · Baseline
- Buffer tank (tempering buffer) · Whole line or unspecified equipment · After intervention
- Chocolate Production Plant · Whole line or unspecified equipment · Baseline
- Chocolate Production Plant · Whole line or unspecified equipment · After intervention