Equipment failure (breakdowns)

Forming/blow-moulding machine breakdown

Equipment failure (breakdowns)AvailabilityForming, moulding and depositing

In short

It appears in about 2 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 5 of the 76 studies that could observe it (good evidence).

What happens

A mechanical, electrical, pneumatic or hydraulic component of the blow-mould or forming machine (e.g. mould clamping, heater, actuator, drive or control element) degrades or fails, interrupting the forming process until a technician intervenes. The fault is severe enough that the operator cannot clear it alone and maintenance repair or part replacement is required.

What is done about it

Apply condition-based or preventive maintenance on critical mould, heating, clamping and drive components, track recurring fault codes to identify weak subsystems, and keep critical spare parts available to shorten repair time. Root-cause analysis of repeated breakdowns should drive design or procedural changes to eliminate the failure mode.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
2.3% [0.7–5.3%]
Expected share of lost time
1.3% [0.4–3.1%]
Share of lost time when present
58% [47–67%]
Studies / units
76 / 96
Evidence grade
B

Grade B: 5 to 9 studies, or an interval width between 0.20 and 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    2.6% [0.4–8.2%]5 studies
  • Soft drinks, bottled water and juices
    4.2% [0.8–12.2%]11 studies
  • Brewing, wine and spirits
    2.8% [0.4–9.5%]0 studies
  • Bakery and pasta
    2.5% [0.5–6.7%]25 studies
  • Meat, poultry and seafood
    2.7% [0.4–8.6%]3 studies
  • Fruit and vegetable processing
    3.7% [0.5–12.0%]3 studies
  • Grain and oilseed milling
    2.8% [0.4–9.4%]0 studies
  • Sugar and confectionery
    2.3% [0.4–7.1%]8 studies
  • Snacks, coffee, tea and other foods
    2.4% [0.4–7.3%]7 studies
  • Animal feed and pet food
    2.4% [0.4–7.6%]6 studies
  • Food manufacturing (unspecified or mixed)
    3.6% [0.6–11.5%]8 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A mechanical, electrical, pneumatic or hydraulic component of the blow-mould or forming machine (e.g. mould clamping, heater, actuator, drive or control element) degrades or fails, interrupting the forming process until a technician intervenes. The fault is severe enough that the operator cannot clear it alone and maintenance repair or part replacement is required.

How it looks in SCADA data

Engineering guidance

SCADA/MES logs a prolonged machine-down or fault state on the forming/blow-mould asset, typically with a specific alarm or fault code and a maintenance work order; downstream filling or conveying equipment shows starvation while upstream feed accumulates or stops. Repeated short recoveries followed by recurrence of the same alarm code indicate an intermittent failure mode rather than a one-off event.

Countermeasure

Engineering guidance

Apply condition-based or preventive maintenance on critical mould, heating, clamping and drive components, track recurring fault codes to identify weak subsystems, and keep critical spare parts available to shorten repair time. Root-cause analysis of repeated breakdowns should drive design or procedural changes to eliminate the failure mode.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 125 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  2. Lost time: 130 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  3. Lost time: 227 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  4. Lost time: 397 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  5. Lost time: 132 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  6. Lost time: 132 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  7. Lost time: 397 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  8. Lost time: 227 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  9. Lost time: 130 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  10. Lost time: 125 h · as reported: “breakdown”
    Show verbatim quote
    Total number hours of breakdown per year(hours) 125 130 227 397 132
  11. Share of lost time: 7.45 % · as reported: “Electrical downtime”
    Show verbatim quote
    Electrical downtime 0% 15.53% 6.82% 7.45%
  12. Share of lost time: 21.0 % · as reported: “Mechanical Downtime”
    Show verbatim quote
    Mechanical Downtime 17.43% 20.14% 25.54% 21.03%
  13. Share of lost time: 28.0 % · as reported: “equipment failures”
    Show verbatim quote
    The primary causes of low efficiency are idling and minor stoppages (48%) and equipment failures (28%), both of which are influenced by a lack of preventive maintenance and errors in machine settings.
  14. Lost time: 3,564 menit · as reported: “breakdown”
    Show verbatim quote
    rata-rata 3.564 193,25 3.757,25