Packaging line changeover
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 3 of the 112 studies that could observe it (limited evidence).
What happens
The packaging machine is stopped to switch from one product, format or pack type to another, requiring removal and refitting of tooling, guides, feeders or other format-specific parts, followed by mechanical and sensor adjustments until stable operation is reached. Different changeover types correspond to different levels of mechanical complexity, ranging from minor settings changes to full tooling exchanges.
What is done about it
Apply structured changeover reduction methods such as SMED, standardizing tool sets, pre-staging format parts, and separating internal from external setup tasks to shorten the time the line remains stopped. Classify and track changeover types separately to prioritize improvement effort on the most time-consuming variants.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.0% [0.3–2.3%]
- Expected share of lost time
- 0.5% [0.1–1.3%]
- Share of lost time when present
- 57% [45–67%]
- Studies / units
- 112 / 155
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products1.0% [0.1–3.5%]14 studies
- Soft drinks, bottled water and juices0.9% [0.1–2.6%]33 studies
- Brewing, wine and spirits2.0% [0.3–5.8%]14 studies
- Bakery and pasta1.1% [0.1–3.8%]6 studies
- Meat, poultry and seafood1.1% [0.1–4.1%]6 studies
- Fruit and vegetable processing1.1% [0.1–3.9%]4 studies
- Grain and oilseed milling1.1% [0.2–3.7%]4 studies
- Sugar and confectionery1.1% [0.1–3.8%]4 studies
- Snacks, coffee, tea and other foods1.1% [0.1–3.5%]8 studies
- Animal feed and pet food1.1% [0.1–3.8%]5 studies
- Food manufacturing (unspecified or mixed)1.5% [0.2–4.9%]14 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe packaging machine is stopped to switch from one product, format or pack type to another, requiring removal and refitting of tooling, guides, feeders or other format-specific parts, followed by mechanical and sensor adjustments until stable operation is reached. Different changeover types correspond to different levels of mechanical complexity, ranging from minor settings changes to full tooling exchanges.
How it looks in SCADA data
Engineering guidanceMES/SCADA records an extended machine-state change to 'changeover' or 'setup' mode with the line in non-production status, accompanied by zero or near-zero output counts over a sustained period. Operator or supervisor logins may tag the event by changeover type, and the duration distribution typically clusters by the recorded type code.
Countermeasure
Engineering guidanceApply structured changeover reduction methods such as SMED, standardizing tool sets, pre-staging format parts, and separating internal from external setup tasks to shorten the time the line remains stopped. Classify and track changeover types separately to prioritize improvement effort on the most time-consuming variants.
4Sources
- ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK) (2016)Open sourceLost time: 6,657 menit · as reported: “Change Over”
Show verbatim quote
Total 6657 129243 66,76
- ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK) (2016)Open sourceShare of planned time: 5.15 % · as reported: “Change Over”
Show verbatim quote
Rata-rata 512,08 941,77 5,15
- Förbättring av ”overall equipment effectiveness” vid Pågen : Analys och problemlösning för en effektivare produktion (2017)Open sourceMean event duration: 23.5 min · as reported: “exchanges in the packaging process”
Show verbatim quote
can reduce the changeovers time by about 8,5 minuets from 23,5 to 15 minuets
- Share of lost time: 14.6 % · as reported: “Changeover”
Show verbatim quote
Changeover 14.62% 12.65% 16.58%
- Share of lost time: 16.6 % · as reported: “Changeover”
Show verbatim quote
Changeover 14.62% 12.65% 16.58%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 31.5 min · as reported: “Type A changeover”
Show verbatim quote
Type A 30.0, 33.0 (µ = 31.5) 24.0, 26.0 (µ = 25.0) 6.5 min 20.6%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 31.5 min · as reported: “Type B changeover”
Show verbatim quote
Type B 35.0, 28.0 (µ = 31.5) 26.0, 27.0 (µ = 26.5) 5.0 min 15.9%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 43.5 min · as reported: “Type C changeover”
Show verbatim quote
Type C 38.0, 49.0 (µ = 43.5) 35.0, 37.0 (µ = 37.5) 6.0 min 13.8%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 42.0 min · as reported: “Type D changeover”
Show verbatim quote
Type D 39.0, 39.0, 48.0 (µ = 42.0) 35.0, 35.0 (µ = 35.0) 7.0 min 16.7%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 37.7 min · as reported: “pooled all changeover types (A, B, C, D)”
Show verbatim quote
The pooled analysis shows a mean reduction from 37.7 to 30.6 minutes (18.7%), with a large effect size (Hedges’ g = 1.04).
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 25.0 min · as reported: “Type A changeover”
Show verbatim quote
Type A 30.0, 33.0 (µ = 31.5) 24.0, 26.0 (µ = 25.0) 6.5 min 20.6%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 26.5 min · as reported: “Type B changeover”
Show verbatim quote
Type B 35.0, 28.0 (µ = 31.5) 26.0, 27.0 (µ = 26.5) 5.0 min 15.9%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 37.5 min · as reported: “Type C changeover”
Show verbatim quote
Type C 38.0, 49.0 (µ = 43.5) 35.0, 37.0 (µ = 37.5) 6.0 min 13.8%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 35.0 min · as reported: “Type D changeover”
Show verbatim quote
Type D 39.0, 39.0, 48.0 (µ = 42.0) 35.0, 35.0 (µ = 35.0) 7.0 min 16.7%
- Integrating SMED and Mechanical Design for Changeover Reduction in Beverage Packaging Lines (2026)Open sourceMean event duration: 30.6 min · as reported: “pooled all changeover types (A, B, C, D)”
Show verbatim quote
The pooled analysis shows a mean reduction from 37.7 to 30.6 minutes (18.7%), with a large effect size (Hedges’ g = 1.04).