Included study
ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK)
1Bibliographic record
- Authors
- Erry Rimawan, Agus Raif
- Year
- 2016
- Venue
- SINERGI
- Country
- Indonesia
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 91 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Pada tahap proses packaging yang ada di PT. MBI melalui dengan 3 line diantaranya racking line (Line 1), canning line (Line 2), bottling line (Line 3).
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 9)Total 88,85 78,51 99,90 69,69 | none | OEE | 69.7 % | Both extractors agreed |
—Show verbatim quote (Table 9)Total 88,85 78,51 99,90 69,69 | none | Availability | 88.9 % | Both extractors agreed |
—Show verbatim quote (Table 9)Total 88,85 78,51 99,90 69,69 | none | Performance | 78.5 % | Both extractors agreed |
—Show verbatim quote (Table 9)Total 88,85 78,51 99,90 69,69 | none | Quality | 99.9 % | Both extractors agreed |
Stop LineShow verbatim quote (Table 12)Total 1652 129243 16,26 | Idling and minor stops (micro-stops) | Lost time | 1,652 menit | Both extractors agreed |
Change OverShow verbatim quote (Table 11)Total 6657 129243 66,76 | Setup and adjustments | Lost time | 6,657 menit | Both extractors agreed |
BreakdownShow verbatim quote (Table 10)Total 6105 129243 61,33 | Equipment failure (breakdowns) | Lost time | 6,105 menit | Both extractors agreed |
BreakdownShow verbatim quote (Table 10)Rata-rata 469,62 941,77 5,72 | Equipment failure (breakdowns) | Share of planned time | 5.72 % | Single extractor |
Change OverShow verbatim quote (Table 11)Rata-rata 512,08 941,77 5,15 | Setup and adjustments | Share of planned time | 5.15 % | Single extractor |
Stop LineShow verbatim quote (Table 12)Rata-rata 127,08 941,77 1,28 | Idling and minor stops (micro-stops) | Share of planned time | 1.28 % | Single extractor |
Reduced SpeedShow verbatim quote (Table 13)Rata-rata 8833 0,0025 2773884,62 941,77 19,21 | Reduced speed | Share of planned time | 19.2 % | Single extractor |
Defect LossesShow verbatim quote (Table 14)Rata-rata 2779,69 0,0025 941,77 0,07 | Process defects (scrap and rework) | Share of planned time | 0.0700 % | Single extractor |
—Show verbatim quote (Table 6)Total 131040 1797 129243 14414 114829 88,85 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 1,797 menit | Single extractor |
—Show verbatim quote (Kesimpulan)Breakdown Losses sebesar 4,72% | Equipment failure (breakdowns) | Share of planned time | 4.72 % | Single extractor |
—Show verbatim quote (Kesimpulan)Setup & Adjusment losses sebesar 5,15% | Setup and adjustments | Share of planned time | 5.15 % | Single extractor |
—Show verbatim quote (Kesimpulan)Idling and Minor Stop sebesar 1,28% | Idling and minor stops (micro-stops) | Share of planned time | 1.28 % | Single extractor |
—Show verbatim quote (Kesimpulan)Reduced Speed Losses sebesar 19,12%, dari penelitian selama dilapangan losses ini terjadi karena adanya sistem pengawasan yang jelek (kurang baik) | Reduced speed | Share of planned time | 19.1 % | Single extractor |
—Show verbatim quote (Kesimpulan)Defect Losses sebesar 0,07% | Process defects (scrap and rework) | Share of planned time | 0.0700 % | Single extractor |
Observation units
- Line 2 (canning line) · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Line 2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline