ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK)

Open source

1Bibliographic record

Authors
Erry Rimawan, Agus Raif
Year
2016
Venue
SINERGI
Country
Indonesia
Segment
Brewing, wine and spirits
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
91 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Pada tahap proses packaging yang ada di PT. MBI melalui dengan 3 line diantaranya racking line (Line 1), canning line (Line 2), bottling line (Line 3).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 9)
Total 88,85 78,51 99,90 69,69
noneOEE69.7 %Both extractors agreed
—
Show verbatim quote (Table 9)
Total 88,85 78,51 99,90 69,69
noneAvailability88.9 %Both extractors agreed
—
Show verbatim quote (Table 9)
Total 88,85 78,51 99,90 69,69
nonePerformance78.5 %Both extractors agreed
—
Show verbatim quote (Table 9)
Total 88,85 78,51 99,90 69,69
noneQuality99.9 %Both extractors agreed
Stop Line
Show verbatim quote (Table 12)
Total 1652 129243 16,26
Idling and minor stops (micro-stops)Lost time1,652 menitBoth extractors agreed
Change Over
Show verbatim quote (Table 11)
Total 6657 129243 66,76
Setup and adjustmentsLost time6,657 menitBoth extractors agreed
Breakdown
Show verbatim quote (Table 10)
Total 6105 129243 61,33
Equipment failure (breakdowns)Lost time6,105 menitBoth extractors agreed
Breakdown
Show verbatim quote (Table 10)
Rata-rata 469,62 941,77 5,72
Equipment failure (breakdowns)Share of planned time5.72 %Single extractor
Change Over
Show verbatim quote (Table 11)
Rata-rata 512,08 941,77 5,15
Setup and adjustmentsShare of planned time5.15 %Single extractor
Stop Line
Show verbatim quote (Table 12)
Rata-rata 127,08 941,77 1,28
Idling and minor stops (micro-stops)Share of planned time1.28 %Single extractor
Reduced Speed
Show verbatim quote (Table 13)
Rata-rata 8833 0,0025 2773884,62 941,77 19,21
Reduced speedShare of planned time19.2 %Single extractor
Defect Losses
Show verbatim quote (Table 14)
Rata-rata 2779,69 0,0025 941,77 0,07
Process defects (scrap and rework)Share of planned time0.0700 %Single extractor
—
Show verbatim quote (Table 6)
Total 131040 1797 129243 14414 114829 88,85
Planned downtime (scheduled maintenance, breaks, no demand)Lost time1,797 menitSingle extractor
—
Show verbatim quote (Kesimpulan)
Breakdown Losses sebesar 4,72%
Equipment failure (breakdowns)Share of planned time4.72 %Single extractor
—
Show verbatim quote (Kesimpulan)
Setup & Adjusment losses sebesar 5,15%
Setup and adjustmentsShare of planned time5.15 %Single extractor
—
Show verbatim quote (Kesimpulan)
Idling and Minor Stop sebesar 1,28%
Idling and minor stops (micro-stops)Share of planned time1.28 %Single extractor
—
Show verbatim quote (Kesimpulan)
Reduced Speed Losses sebesar 19,12%, dari penelitian selama dilapangan losses ini terjadi karena adanya sistem pengawasan yang jelek (kurang baik)
Reduced speedShare of planned time19.1 %Single extractor
—
Show verbatim quote (Kesimpulan)
Defect Losses sebesar 0,07%
Process defects (scrap and rework)Share of planned time0.0700 %Single extractor

Observation units

  • Line 2 (canning line) · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Line 2 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline