In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
The line or machine is deliberately stopped according to a preventive maintenance schedule so that technicians can inspect, lubricate, adjust or replace components before they fail. This is a scheduled, management-driven interruption rather than a reaction to an unexpected fault, and it may also be recorded as lost time when the scheduled maintenance task itself is skipped or not executed on time.
What is done about it
Maintain and enforce a documented preventive maintenance calendar synchronized with production scheduling to minimize impact on throughput, and track compliance so that scheduled tasks are not skipped or delayed. Use condition-based or predictive maintenance techniques where feasible to shorten planned stop duration and confirm execution through work-order closure in the CMMS.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 56% [44–66%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.4%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.2%]11 studies
- Bakery and pasta0.6% [0.1–1.9%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.5%]9 studies
- Fruit and vegetable processing0.6% [0.1–2.2%]7 studies
- Grain and oilseed milling0.6% [0.1–2.2%]6 studies
- Sugar and confectionery0.9% [0.1–3.3%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.1%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.3%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line or machine is deliberately stopped according to a preventive maintenance schedule so that technicians can inspect, lubricate, adjust or replace components before they fail. This is a scheduled, management-driven interruption rather than a reaction to an unexpected fault, and it may also be recorded as lost time when the scheduled maintenance task itself is skipped or not executed on time.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows a machine-state transition to a planned stop or maintenance state code at a scheduled time, usually initiated manually by an operator or maintenance order rather than triggered by an alarm. Duration is bounded by a work order and there is no preceding fault alarm; absence of the expected maintenance event in the schedule log can itself appear as a missed-PM flag.
Countermeasure
Engineering guidanceMaintain and enforce a documented preventive maintenance calendar synchronized with production scheduling to minimize impact on throughput, and track compliance so that scheduled tasks are not skipped or delayed. Use condition-based or predictive maintenance techniques where feasible to shorten planned stop duration and confirm execution through work-order closure in the CMMS.
4Sources
- Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ) (2019)Open sourceNumber of events: 517 activities · as reported: “planned maintenance (PM03) tidak dilaksanakan”
Show verbatim quote
Gambar 4 menunjukkan bahwa ada 517 aktivitas PM 03 yang direncanakan, tetapi tidak dilaksanakan karena tidak adanya material consumable, peralatan, teknisi atau ditunda karena pabrik tidak bisa berhenti.
- Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ) (2019)Open sourceMean event duration: 37.0 min · as reported: “planned maintenance (PM03)”
Show verbatim quote
Data ini menunjukkan juga bahwa rata-rata waktu yang dibutuhkan untuk melakukan PM03 hanya 37 menit.
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceShare of lost time: 1.00 % · as reported: “planned maintenance”
Show verbatim quote
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
- Share of lost time: 35.1 % · as reported: “Planned maintenance”
Show verbatim quote
Planned maintenance 35.09% 34.48% 39.78%
- Share of lost time: 39.8 % · as reported: “Planned maintenance”
Show verbatim quote
Planned maintenance 35.09% 34.48% 39.78%