Included study
ANALISIS PRODUKTIVITAS MESIN PRESS DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) PADAPT. JAPFA COMFEED INDONESIA LAMPUNG
1Bibliographic record
- Authors
- Melani Anggraini, Emy Khikmawati, Heni Widiastuti
- Year
- 2017
- Venue
- Jurnal Rekayasa Teknologi dan Sains
- Country
- Indonesia
- Segment
- Animal feed and pet food
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 730 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Mesin press merupakan mesin yang digunakan untuk membentuk pakan menjadi bentuk pellet dan remah (crumble).
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Idling & minor stoppages lossesmesin pressShow verbatim quote (Tabel 5)Idling & minor stoppages losses 8,30 2,50 97,39 | Idling and minor stops (micro-stops) | Share of lost time | 2.50 % | Both extractors agreed |
Idling & minor stoppages lossesmesin pressShow verbatim quote (Tabel 5)Idling & minor stoppages losses 8,30 2,50 97,39 | Idling and minor stops (micro-stops) | Lost time | 8.30 jam | Both extractors agreed |
Setup and adjusment lossesmesin pressShow verbatim quote (Tabel 5)Setup and adjusment losses 6,00 1,82 99,21 | Setup and adjustments | Share of lost time | 1.82 % | Both extractors agreed |
Setup and adjusment lossesmesin pressShow verbatim quote (Tabel 5)Setup and adjusment losses 6,00 1,82 99,21 | Setup and adjustments | Lost time | 6.00 jam | Both extractors agreed |
Breakdowns lossesmesin pressShow verbatim quote (Tabel 5)Breakdowns losses 31,42 9,49 94,89 | Equipment failure (breakdowns) | Share of lost time | 9.49 % | Both extractors agreed |
Breakdowns lossesmesin pressShow verbatim quote (Tabel 5)Breakdowns losses 31,42 9,49 94,89 | Equipment failure (breakdowns) | Lost time | 31.4 jam | Both extractors agreed |
Rework lossesmesin pressShow verbatim quote (Tabel 5)Rework losses 2,60 0,79 100 | Process defects (scrap and rework) | Share of lost time | 0.790 % | Both extractors agreed |
Rework lossesmesin pressShow verbatim quote (Tabel 5)Rework losses 2,60 0,79 100 | Process defects (scrap and rework) | Lost time | 2.60 jam | Both extractors agreed |
Scrap lossesmesin pressShow verbatim quote (Tabel 5)Scrap losses 0 0 100 | Process defects (scrap and rework) | Share of lost time | 0 % | Both extractors agreed |
Scrap lossesmesin pressShow verbatim quote (Tabel 5)Scrap losses 0 0 100 | Process defects (scrap and rework) | Lost time | 0 jam | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 3)Rata-Rata 97,94 90,74 100 88,86 | none | Quality | 100 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 3)Rata-Rata 97,94 90,74 100 88,86 | none | Performance | 90.7 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 3)Rata-Rata 97,94 90,74 100 88,86 | none | Availability | 97.9 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 3)Rata-Rata 97,94 90,74 100 88,86 | none | OEE | 88.9 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 2)Rata-Rata 96,68 75,67 100 73,18 | none | Quality | 100 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 2)Rata-Rata 96,68 75,67 100 73,18 | none | Performance | 75.7 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 2)Rata-Rata 96,68 75,67 100 73,18 | none | Availability | 96.7 % | Both extractors agreed |
—mesin pressShow verbatim quote (Tabel 2)Rata-Rata 96,68 75,67 100 73,18 | none | OEE | 73.2 % | Both extractors agreed |
Reduced speed lossesmesin pressShow verbatim quote (Section 4, after Gambar 6; Tabel 5)faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40% | Reduced speed | Share of lost time | 85.4 % | Both extractors agreed |
Reduced speed lossesmesin pressShow verbatim quote (Section 4, after Gambar 6; Tabel 5)faktor tertinggi untuk total time losses yaitu pada reduced speed losses sebesar 282,85 jam atau 85,40% | Reduced speed | Lost time | 283 jam | Both extractors agreed |
Observation units
- Mesin Press (tahun 2014, kapasitas 20 ton/jam) · Forming, moulding and depositing · Baseline
- Mesin Press (tahun 2015, kapasitas 15 ton/jam) · Forming, moulding and depositing · After intervention