Included study
Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Packaging Makanan di PT XYZ
1Bibliographic record
- Authors
- Arsyad Sumantika, HENDY RINALDY, Bahariandi Aji Prasetyo, Elsya Paskaria Loyda Tarigan, Sri Zetli
- Year
- 2026
- Venue
- Jurnal Surya Teknika
- Country
- Indonesia
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 365 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Mesin yang diteliti merupakan mesin automatic vertical packaging yang digunakan untuk proses pengemasan produk makanan.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—mesin packagingShow verbatim quote (Section 3.1.2 / Tabel 4)Berdasarkan hasil perhitungan diperoleh rata-rata performance efficiency sebesar 87,49%. | none | Performance | 87.5 % | Both extractors agreed |
—mesin packagingShow verbatim quote (Section 3.1.1 / Tabel 3)Hasil perhitungan menunjukkan bahwa tingkat ketersediaan mesin packaging selama tahun 2025 rata-rata sebesar 97,00% | none | Availability | 97.0 % | Both extractors agreed |
—mesin packagingShow verbatim quote (Tabel 5)Rata-rata 493.583 8.454 485.129 98,29 | none | Quality | 98.3 % | Both extractors agreed |
—mesin packagingShow verbatim quote (Section 3.1.4)OEE = Availability × Performance × Quality = 97.00% × 87.49% × 98.29% = 83.42% | none | OEE | 83.4 % | Both extractors agreed |
Setup and Adjustment LossesShow verbatim quote (Tabel 7)Kegagalan karena Setup and Adjustment Losses 31,20 11,82 Sedang | Setup and adjustments | Share of lost time | 11.8 % | Both extractors agreed |
Setup and Adjustment LossesShow verbatim quote (Tabel 7)Kegagalan karena Setup and Adjustment Losses 31,20 11,82 Sedang | Setup and adjustments | Lost time | 31.2 Jam | Both extractors agreed |
Idling and Minor StoppagesShow verbatim quote (Tabel 7)Kegagalan karena Idling and Minor Stoppages 49,21 18,64 Tinggi | Idling and minor stops (micro-stops) | Lost time | 49.2 Jam | Both extractors agreed |
Process Defect LossesShow verbatim quote (Tabel 7)Kegagalan karena Process Defect Losses 25,28 9,58 Sedang | Process defects (scrap and rework) | Share of lost time | 9.58 % | Both extractors agreed |
Process Defect LossesShow verbatim quote (Tabel 7)Kegagalan karena Process Defect Losses 25,28 9,58 Sedang | Process defects (scrap and rework) | Lost time | 25.3 Jam | Both extractors agreed |
Reduced Speed LossesShow verbatim quote (Tabel 7)Kegagalan karena Reduced Speed Losses 65,28 24,73 Tinggi | Reduced speed | Lost time | 65.3 Jam | Both extractors agreed |
Reduced Yield LossesShow verbatim quote (Tabel 7)Kegagalan karena Reduced Yield Losses 9,98 3,78 Rendah | Start-up losses (reduced yield) | Share of lost time | 3.78 % | Both extractors agreed |
Reduced Yield LossesShow verbatim quote (Tabel 7)Kegagalan karena Reduced Yield Losses 9,98 3,78 Rendah | Start-up losses (reduced yield) | Lost time | 9.98 Jam | Both extractors agreed |
Breakdown LossesShow verbatim quote (Tabel 7)Kegagalan karena Breakdown Losses 83,03 31,45 Sangat Tinggi | Equipment failure (breakdowns) | Lost time | 83.0 Jam | Both extractors agreed |
Breakdown LossesShow verbatim quote (Section 3.1.5 / Tabel 7)diketahui bahwa faktor kegagalan berasal dari Breakdown Losses sebesar 31,45%, Reduced Speed Losses sebesar 24,73%, dan Idling and Minor Stoppages sebesar 18,64%. | Equipment failure (breakdowns) | Share of lost time | 31.5 % | Single extractor |
Idling and Minor StoppagesShow verbatim quote (Section 3.1.5 / Tabel 7)diketahui bahwa faktor kegagalan berasal dari Breakdown Losses sebesar 31,45%, Reduced Speed Losses sebesar 24,73%, dan Idling and Minor Stoppages sebesar 18,64%. | Idling and minor stops (micro-stops) | Share of lost time | 18.6 % | Single extractor |
Reduced Speed LossesShow verbatim quote (Section 3.1.5 / Tabel 7)diketahui bahwa faktor kegagalan berasal dari Breakdown Losses sebesar 31,45%, Reduced Speed Losses sebesar 24,73%, dan Idling and Minor Stoppages sebesar 18,64%. | Reduced speed | Share of lost time | 24.7 % | Single extractor |
—mesin packagingShow verbatim quote (Section 3.1)Rata-rata output produksi aktual perusahaan hanya mencapai 493.583 pcs per bulan atau sekitar 91,40% dari target produksi perusahaan. | none | Throughput | 493,583 pcs/bulan | Single extractor |
—Show verbatim quote (Page 7, Table 7)Kegagalan karena Breakdown Losses | 83,03 | 31,45 | Sangat Tinggi | Equipment failure (breakdowns) | Share of lost time | 31.5 % | Single extractor |
—Show verbatim quote (Page 7, Table 7)Kegagalan karena Idling and Minor Stoppages | 49,21 | 18,64 | Tinggi | Idling and minor stops (micro-stops) | Share of lost time | 18.6 % | Single extractor |
—Show verbatim quote (Page 7, Table 7)Kegagalan karena Reduced Speed Losses | 65,28 | 24,73 | Tinggi | Reduced speed | Share of lost time | 24.7 % | Single extractor |
Observation units
- Mesin Packaging PT XYZ · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Packaging Machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline