Maximizing Machine Efficiency in Indonesia's Noodle Industry

Open source

1Bibliographic record

Authors
Mohammad Andi Rasyid, Tedjo Sukmono
Year
2024
Venue
Procedia of Engineering and Life Science
Country
Indonesia
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
30 days
Data collection
not_reported
Intervention
Show the setting as described by the study
Perusahaan yang bergerak dalam sektor manufaktur makanan dengan hasil produksi berupa produk mi kering, mi instan dan mi bihun.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 4)
November 98,30 87,40 97,44 83,70
noneOEE83.7 %Single extractor
—
Show verbatim quote (Table 4)
November 98,30 87,40 97,44 83,70
noneAvailability98.3 %Single extractor
—
Show verbatim quote (Table 4)
November 98,30 87,40 97,44 83,70
nonePerformance87.4 %Single extractor
—
Show verbatim quote (Table 4)
November 98,30 87,40 97,44 83,70
noneQuality97.4 %Single extractor
Breakdown Losses
Show verbatim quote (Section III.E.1)
𝐵𝑟𝑒𝑎𝑘𝑑𝑜𝑤𝑛 𝐿𝑜𝑠𝑠𝑒𝑠= 1,704 %
Equipment failure (breakdowns)Share of planned time1.70 %Single extractor
Setup and adjustment losses
Show verbatim quote (Section III.E.2)
𝑆𝑒𝑡𝑢𝑝 𝑎𝑛𝑑 𝑎𝑑𝑗𝑢𝑠𝑚𝑒𝑛𝑡 𝑙𝑜𝑠𝑠𝑒𝑠= 0 %
Setup and adjustmentsShare of planned time0 %Single extractor
Reduced speed losses
Show verbatim quote (Section III.E.3)
𝑅𝑒𝑑𝑢𝑐𝑒𝑑 𝑠𝑝𝑒𝑒𝑑 𝑙𝑜𝑠𝑠𝑒𝑠𝑠= 12,386 %
Reduced speedShare of planned time12.4 %Single extractor
Idling minor stoppage losses
Show verbatim quote (Section III.E.4)
𝐼𝑑𝑙𝑖𝑛𝑔 𝑚𝑖𝑛𝑜𝑟 𝑠𝑡𝑜𝑝𝑎𝑔𝑒 𝑙𝑜𝑠𝑠𝑒𝑠= 2,353 %
Idling and minor stops (micro-stops)Share of planned time2.35 %Single extractor
Defect in process
Show verbatim quote (Section III.E.5)
𝐷𝑒𝑓𝑒𝑐𝑡 𝑖𝑛 𝑝𝑟𝑜𝑐𝑒𝑠𝑠= 2,202 %
Process defects (scrap and rework)Share of planned time2.20 %Single extractor
Reduced yield losses
Show verbatim quote (Section III.E.6)
𝑅𝑒𝑑𝑢𝑐𝑒𝑑 𝑦𝑖𝑒𝑙𝑑 𝑙𝑜𝑠𝑠𝑒𝑠= 0 %
Start-up losses (reduced yield)Share of planned time0 %Single extractor

Observation units

  • Mesin produksi (production machine, November) · Whole line or unspecified equipment · Baseline