Optimizing beverage manufacturing: integrating lean manufacturing and machine learning to enhance efficiency and reduce waste
1Bibliographic record
- Authors
- Mendoza Sotomayor, Raul, Sabogal Arias, Jose Antonio
- Year
- 2025
- Venue
- —
- DOI
- —
- Country
- Peru
- Segment
- Brewing, wine and spirits
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 5 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The main issues concerning the product process include 25% of incorrectly labeled bottles, 18% of improperly sealed bottles, and 12% of reprocessing in the current alcoholic beverage production process.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Improperly sealed bottlescapping machineShow verbatim quote (Table 7. Results of defects)Improperly sealed bottles Average 11 7 | Process defects (scrap and rework) | Number of events | 7.00 Boxes x 12 | Both extractors agreed |
Improperly sealed bottlescapping machineShow verbatim quote (Table 7. Results of defects)Improperly sealed bottles Average 11 7 | Process defects (scrap and rework) | Number of events | 11.0 Boxes x 12 | Both extractors agreed |
Mislabelinglabeling machineShow verbatim quote (Table 7. Results of defects)Mislabeling Average 15 8 | Process defects (scrap and rework) | Number of events | 8.00 Boxes x 12 | Both extractors agreed |
Mislabelinglabeling machineShow verbatim quote (Table 7. Results of defects)Mislabeling Average 15 8 | Process defects (scrap and rework) | Number of events | 15.0 Boxes x 12 | Both extractors agreed |
—Show verbatim quote (Table 9. Results of unimproved process vs. Improved process)Production Boxes x 12 60 80 | none | Throughput | 80.0 Boxes x 12 | Both extractors agreed |
—Show verbatim quote (Table 9. Results of unimproved process vs. Improved process)Production Boxes x 12 60 80 | none | Throughput | 60.0 Boxes x 12 | Both extractors agreed |
ReworkShow verbatim quote (Table 7. Results of defects)Rework Average 7 4 | Process defects (scrap and rework) | Number of events | 4.00 Boxes x 12 | Both extractors agreed |
ReworkShow verbatim quote (Table 7. Results of defects)Rework Average 7 4 | Process defects (scrap and rework) | Number of events | 7.00 Boxes x 12 | Both extractors agreed |
—mixing machineShow verbatim quote (Figure 4 VSM of the company)TC= 315 SEC TCP= 30 MIN TF= 100% PNC= 8% TD= 25200 SEC/DAY | Setup and adjustments | Lost time | 30.0 MIN | Single extractor |
—mixing machineShow verbatim quote (Figure 4 VSM of the company)TC= 315 SEC TCP= 30 MIN TF= 100% PNC= 8% TD= 25200 SEC/DAY | Process defects (scrap and rework) | Defect rate | 8.00 % | Single extractor |
—filling machineShow verbatim quote (Figure 4 VSM of the company)TC= 293 SEC TCP= 10 MIN TF= 75% PNC= 12% TD= 25200 SEC/DAY | Setup and adjustments | Lost time | 10.0 MIN | Single extractor |
—filling machineShow verbatim quote (Figure 4 VSM of the company)TC= 293 SEC TCP= 10 MIN TF= 75% PNC= 12% TD= 25200 SEC/DAY | Process defects (scrap and rework) | Defect rate | 12.0 % | Single extractor |
—capping machineShow verbatim quote (Figure 4 VSM of the company)TC= 376 SEC TCP= 10 MIN TF= 90% PNC= 15% TD= 25200 SEC/DAY | Setup and adjustments | Lost time | 10.0 MIN | Single extractor |
—capping machineShow verbatim quote (Figure 4 VSM of the company)TC= 376 SEC TCP= 10 MIN TF= 90% PNC= 15% TD= 25200 SEC/DAY | Process defects (scrap and rework) | Defect rate | 15.0 % | Single extractor |
—labeling machineShow verbatim quote (Figure 4 VSM of the company)TC= 336 SEC TCP= 10 MIN TF= 80% PNC= 20% TD= 25200 SEC/DAY | Setup and adjustments | Lost time | 10.0 MIN | Single extractor |
—labeling machineShow verbatim quote (Figure 4 VSM of the company)TC= 336 SEC TCP= 10 MIN TF= 80% PNC= 20% TD= 25200 SEC/DAY | Process defects (scrap and rework) | Defect rate | 20.0 % | Single extractor |
Line change timelabeling machineShow verbatim quote (Table 8. Change times results)Line change time Average 42 16 | Setup and adjustments | Mean event duration | 42.0 min | Single extractor |
Line change timelabeling machineShow verbatim quote (Table 8. Change times results)Line change time Average 42 16 | Setup and adjustments | Mean event duration | 16.0 min | Single extractor |
—packing stationShow verbatim quote (Figure 4 VSM of the company)TC= 420 SEC TCP= 1 MIN TF= 100% PNC= 0% TD= 25200 SEC/DAY | Setup and adjustments | Lost time | 1.00 MIN | Single extractor |
—packing stationShow verbatim quote (Figure 4 VSM of the company)TC= 420 SEC TCP= 1 MIN TF= 100% PNC= 0% TD= 25200 SEC/DAY | Process defects (scrap and rework) | Defect rate | 0 % | Single extractor |
—Show verbatim quote (Table 9. Results of unimproved process vs. Improved process)Defects During production Boxes x 12 33 19 | Process defects (scrap and rework) | Number of events | 33.0 Boxes x 12 | Single extractor |
—Show verbatim quote (Table 9. Results of unimproved process vs. Improved process)Defects During production Boxes x 12 33 19 | Process defects (scrap and rework) | Number of events | 19.0 Boxes x 12 | Single extractor |
Line changeoverlabeling machineShow verbatim quote (Table 8)Line change time | Average | 42 | 16 | Setup and adjustments | Lost time | 42.0 min | Single extractor |
Line changeoverlabeling machineShow verbatim quote (Table 8)Line change time | Average | 42 | 16 | Setup and adjustments | Lost time | 16.0 min | Single extractor |
Observation units
- RTD beverage production line · Whole line or unspecified equipment · After intervention
- RTD beverage production line · Whole line or unspecified equipment · Baseline
- Mixing station · Mixing and blending · Baseline
- Filling station · Filling · Baseline
- Capping station · Capping and seaming · Baseline
- Labeling machine · Labeling and coding · Baseline
- Labeling machine · Labeling and coding · After intervention
- Packing station · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Beverage production line (baseline) · Whole line or unspecified equipment · Baseline
- Beverage production line (post-intervention) · Whole line or unspecified equipment · After intervention