Packaging machine breakdown
In short
It appears in about 4 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 15 of the 112 studies that could observe it (strong evidence).
What happens
A mechanical, electrical, pneumatic or control component of the packer, case packer or wrapping/casing equipment degrades or fails outright (worn parts, broken drive elements, sensor or actuator faults), interrupting the packaging function until a technician repairs or replaces it. Because the fault requires maintenance intervention rather than a simple operator reset, the stop is classified as a breakdown rather than a minor stop.
What is done about it
Implement condition-based and preventive maintenance on drives, bearings, seals and sensors of the packaging line, with vibration or wear monitoring to anticipate failure. Maintain critical spare parts on site, standardize fast fault-diagnosis and repair procedures, and perform root-cause analysis on recurring breakdowns to redesign weak components.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 4.4% [1.9–8.4%]
- Expected share of lost time
- 2.6% [1.1–4.8%]
- Share of lost time when present
- 58% [49–66%]
- Studies / units
- 112 / 155
- Evidence grade
- A
Grade A: 10 or more studies and 10 or more distinct lines, with a 95% credible interval narrower than 0.20.
2Probability by segment
- Dairy products3.8% [0.8–9.9%]14 studies
- Soft drinks, bottled water and juices4.0% [1.2–8.3%]33 studies
- Brewing, wine and spirits7.7% [2.3–17.2%]14 studies
- Bakery and pasta6.2% [1.4–16.9%]6 studies
- Meat, poultry and seafood6.1% [1.3–16.1%]6 studies
- Fruit and vegetable processing4.6% [0.9–12.9%]4 studies
- Grain and oilseed milling6.4% [1.3–17.9%]4 studies
- Sugar and confectionery4.6% [0.9–13.1%]4 studies
- Snacks, coffee, tea and other foods5.3% [1.3–13.3%]8 studies
- Animal feed and pet food4.5% [0.8–12.1%]5 studies
- Food manufacturing (unspecified or mixed)8.1% [2.4–18.1%]14 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceA mechanical, electrical, pneumatic or control component of the packer, case packer or wrapping/casing equipment degrades or fails outright (worn parts, broken drive elements, sensor or actuator faults), interrupting the packaging function until a technician repairs or replaces it. Because the fault requires maintenance intervention rather than a simple operator reset, the stop is classified as a breakdown rather than a minor stop.
How it looks in SCADA data
Engineering guidanceMachine state transitions from running to fault/down with the stop duration typically exceeding the minor-stop threshold, accompanied by a specific fault or alarm code from the packer's PLC (drive overload, sensor fault, safety interlock). The downtime counter for the packaging asset accumulates against an equipment-failure reason code, while upstream accumulation conveyors fill and downstream conveyors starve, visible as blocked/starved states on neighboring machines.
Countermeasure
Engineering guidanceImplement condition-based and preventive maintenance on drives, bearings, seals and sensors of the packaging line, with vibration or wear monitoring to anticipate failure. Maintain critical spare parts on site, standardize fast fault-diagnosis and repair procedures, and perform root-cause analysis on recurring breakdowns to redesign weak components.
4Sources
- Lost time: 155 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- Lost time: 118 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- Lost time: 158 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- Lost time: 265 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- Lost time: 129 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- Lost time: 322 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- Lost time: 166 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- Lost time: 286 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- Lost time: 364 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- Lost time: 216 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 216 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 322 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 158 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 155 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 364 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 129 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 286 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 166 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 321.5 165.8 285.5 364.3 216
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 265 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- EFFECT OF EQUIPMENT MAINTENANCE ON THE PERFORMANCE EVALUATION OF FOOD AND BEVERAGE MANUFACTURING INDUSTRIES IN NIGERIA. (2023)Open sourceLost time: 118 h · as reported: “breakdown”
Show verbatim quote
Total number hours of breakdown per year(hours) 154.5 117.66 158.3 264.5 128.6
- ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKING UNTUK MENINGKATKAN NILAI AVAILABILITY MESIN (2014)Open sourceLost time: 2,255 min · as reported: “Breakdown”
Show verbatim quote
Breakdown 2,255 56%
- ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKING UNTUK MENINGKATKAN NILAI AVAILABILITY MESIN (2014)Open sourceLost time: 1,498 min · as reported: “Setup after breakdown”
Show verbatim quote
Setting setelah breakdown 1,498 100%
- ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK) (2016)Open sourceLost time: 6,105 menit · as reported: “Breakdown”
Show verbatim quote
Total 6105 129243 61,33
- ANALISIS PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES PACKAGING DI LINE 2 (STUDI KASUS PT. MULTI BINTANG INDONESIA. TBK) (2016)Open sourceShare of planned time: 5.72 % · as reported: “Breakdown”
Show verbatim quote
Rata-rata 469,62 941,77 5,72
- Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit (2017)Open sourceShare of lost time: 6.00 % · as reported: “automation failures”
Show verbatim quote
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
- Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit (2017)Open sourceShare of lost time: 13.0 % · as reported: “worn parts or equipment breakdown”
Show verbatim quote
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
- Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit (2017)Open sourceShare of lost time: 26.0 % · as reported: “electrical failures”
Show verbatim quote
A deeper analysis of non-scheduled maintenance data (Figure 9) shows that major causes of packing equipment failure are related to: electrical failures (26%), unscheduled operational (26%) or mechanical (23%) adjustments, worn parts or equipment breakdown (13%) and automation failures (6%).
- Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit (2017)Open sourceShare of lost time: 22.0 % · as reported: “packaging failure”
Show verbatim quote
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
- Use of packing equipment efficiency as an estimate of the overall plant effectiveness and as a tool to improve financial results of a food-processing unit (2017)Open sourceLost time: 11,079 min · as reported: “packaging failure”
Show verbatim quote
Major Availability losses were categorized as: non-scheduled maintenance (29,010 min. - 58% of Availability losses); packaging failure (11,079 min. - 22%); lack of demand that are downstream losses (8,260 min. - 13%) and; lack of product input to the packing line (952 min. – 2%).
- Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance (2021)Open sourceLost time: 220 min · as reported: “PM2”
Show verbatim quote
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
- Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance (2021)Open sourceLost time: 225 min · as reported: “PM1”
Show verbatim quote
Total 2540 485 500 560 450 265 225 240 220 5485 224940 2.44%
- Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance (2021)Open sourceNumber of events: 11.0 events · as reported: “PM1”
Show verbatim quote
Total 61 21 24 22 17 7 11 10 8 181
- Study on Preventive Maintenance Strategies of Filling Equipment Based on Reliability-Cantered Maintenance (2021)Open sourceNumber of events: 8.00 events · as reported: “PM2”
Show verbatim quote
Total 61 21 24 22 17 7 11 10 8 181
- Share of lost time: 0.450 % · as reported: “Breakdown”
Show verbatim quote
Breakdown 0.45% 0.94% 0.38%
- Share of lost time: 0.380 % · as reported: “Breakdown”
Show verbatim quote
Breakdown 0.45% 0.94% 0.38%
- Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri (2023)Open sourceShare of planned time: 1.27 % · as reported: “Breakdown”
Show verbatim quote
4 Breakdown 1,27 4,04 98,66
- Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri (2023)Open sourceShare of lost time: 4.04 % · as reported: “Breakdown”
Show verbatim quote
4 Breakdown 1,27 4,04 98,66
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceLost time: 13,590 min · as reported: “fallas”
Show verbatim quote
el tiempo total disponible fue de 71 588 minutos, con un tiempo de parada acumulado de 13 590 minutos y un total de 249 fallas.
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceNumber of events: 249 events · as reported: “fallas”
Show verbatim quote
el tiempo total disponible fue de 71 588 minutos, con un tiempo de parada acumulado de 13 590 minutos y un total de 249 fallas.
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceTime between events: 233 min · as reported: “fallas”
Show verbatim quote
El MTBF promedio durante este período fue de 232.92 minutos, mientras que el MTTR fue de 54.58 minutos.
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceMean event duration: 54.6 min · as reported: “fallas”
Show verbatim quote
El MTBF promedio durante este período fue de 232.92 minutos, mientras que el MTTR fue de 54.58 minutos.
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceLost time: 5,671 min · as reported: “fallas”
Show verbatim quote
mostrando que el tiempo disponible fue de 47 290 minutos con un tiempo de parada de 5671 minutos y 110 fallas
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceNumber of events: 110 events · as reported: “fallas”
Show verbatim quote
mostrando que el tiempo disponible fue de 47 290 minutos con un tiempo de parada de 5671 minutos y 110 fallas
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceTime between events: 378 min · as reported: “fallas”
Show verbatim quote
obteniendo un MTBF promedio de 378.36 minutos (Visualizar Fig. 7), un MTTR promedio de 51.55 minutos
- Application of Total Productive Maintenance (TPM) and 5'S to increase the availability of a ham packaging line of a food company (2024)Open sourceMean event duration: 51.6 min · as reported: “fallas”
Show verbatim quote
obteniendo un MTBF promedio de 378.36 minutos (Visualizar Fig. 7), un MTTR promedio de 51.55 minutos
- Lean-TPM Production Model for Efficiency and Quality Enhancement in the Brewing Industry: Insights from a Peruvian Case Study (2025)Open sourceShare of lost time: 27.0 % · as reported: “technical machinery failures”
Show verbatim quote
technical machinery failures, which accounted for 27.01% and could be mitigated through autonomous maintenance based on 5S principles within a TPM framework.
- Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ (2025)Open sourceShare of lost time: 50.0 % · as reported: “Equipment Failure Losses”
Show verbatim quote
Equipment Failure Losses 20.205 20.205 50% 50%
- Aggregate Analysis of Packaging Machine Effectiveness Using the OEE Method at PT. XYZ (2025)Open sourceLost time: 20,205 Minutes · as reported: “Equipment Failure Losses”
Show verbatim quote
Equipment Failure Losses 20.205 20.205 50% 50%
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceTime between events: 22.6 h · as reported: “mechanical failure (corrective intervention)”
Show verbatim quote
The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4).
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 11.7 h · as reported: “mechanical failure (corrective intervention)”
Show verbatim quote
The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4).
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceTime between events: 32.0 h · as reported: “mechanical failure”
Show verbatim quote
on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required.
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceTime between events: 6.25 h · as reported: “mechanical failure”
Show verbatim quote
on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required.
- Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Packaging Makanan di PT XYZ (2026)Open sourceLost time: 83.0 Jam · as reported: “Breakdown Losses”
Show verbatim quote
Kegagalan karena Breakdown Losses 83,03 31,45 Sangat Tinggi
- Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Packaging Makanan di PT XYZ (2026)Open sourceShare of lost time: 31.5 % · as reported: “Breakdown Losses”
Show verbatim quote
diketahui bahwa faktor kegagalan berasal dari Breakdown Losses sebesar 31,45%, Reduced Speed Losses sebesar 24,73%, dan Idling and Minor Stoppages sebesar 18,64%.
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceTime between events: 117 h · as reported: “mechanical failure”
Show verbatim quote
Furthermore, the mechanical MTBF increased from 98.74 h to 117.25 h, while the electrical MTBF increased from 144.31 h to 170.55 h.
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 7.50 h · as reported: “mechanical failure”
Show verbatim quote
the mechanical MTTR decreased from 9.73 h to 7.50 h
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceTime between events: 98.7 h · as reported: “mechanical failure”
Show verbatim quote
Furthermore, the mechanical MTBF increased from 98.74 h to 117.25 h, while the electrical MTBF increased from 144.31 h to 170.55 h.
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 9.73 h · as reported: “mechanical failure”
Show verbatim quote
the mechanical MTTR decreased from 9.73 h to 7.50 h
- Integrasi OEE–Pareto–FMEA–Ishikawa untuk Peningkatan Efektivitas Mesin dan Mutu Kemasan Kecap Pouch 550 mL: Integrated OEE–Pareto–FMEA–Ishikawa Approach for Improving Machine Effectiveness and Packaging Quality of 550 mL Soy Sauce Pouch (2026)Open sourceShare of lost time: 25.0 % · as reported: “Breakdown loss”
Show verbatim quote
Breakdown loss 25