Proposal for OEE (Overall Equipment Effectiveness) Indicator Deployment in a Beverage Plant

Open source

1Bibliographic record

Authors
Fabiana Pereira Castro, Fernando Oliveira de Araújo
Year
2012
Venue
Brazilian Journal of Operations & Production Management
Country
Brazil
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
11 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The investigation is limited to monitoring the OEE indicator in a machine for filling beverage in PET bottles of 1500 mL, operating in a continuous regime of approximately 4,800 units per hour.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Problem in the filler (code 6003)filler
Show verbatim quote (Line Downtimes section / Figure 3)
The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3).
Equipment failure (breakdowns)Number of events44.0 eventsAdjudicated
Problem in the filler (code 6003)filler
Show verbatim quote (Line Downtimes section / Figure 3)
The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3).
Equipment failure (breakdowns)Lost time473 minAdjudicated
Problem in the inkjet printer (code 6004)inkjet printer
Show verbatim quote (Line Downtimes section)
the company spent 245 and 273 minutes to repair the equipment between the studied days 04 and 05.
Equipment failure (breakdowns)Lost time273 minBoth extractors agreed
Problem in the inkjet printer (code 6004)inkjet printer
Show verbatim quote (Line Downtimes section)
the company spent 245 and 273 minutes to repair the equipment between the studied days 04 and 05.
Equipment failure (breakdowns)Lost time245 minBoth extractors agreed
Discarded PET bottles (waste)filler
Show verbatim quote (OEE section, text)
According to the history, the waste of these bottles was around 3%.
Process defects (scrap and rework)Defect rate3.00 %Both extractors agreed
—
Show verbatim quote (Analysis and Result Discussion / Figure 4)
On day 09, the third figure below the expected (33%) was a result of successive electrical problems in the packing, inkjet printer and filler, respectively, compromising the final index.
noneOEE33.0 %Both extractors agreed
—
Show verbatim quote (Analysis and Result Discussion / Figure 4)
The days 04 and 05 show the smallest figures of the OEE, 8 and 11%, respectively.
noneOEE11.0 %Both extractors agreed
—
Show verbatim quote (Analysis and Result Discussion / Figure 4)
The days 04 and 05 show the smallest figures of the OEE, 8 and 11%, respectively.
noneOEE8.00 %Both extractors agreed
Return/reuse of after-filling PET bottlesfiller
Show verbatim quote (Table 3)
According to Table 3, an average of 3.6% of the bottles in good conditions of use was reutilized for new bottling processes.
Process defects (scrap and rework)Defect rate3.60 %Both extractors agreed
Short mechanical interventions in the filler for small adjustments (3-15 min interval)filler
Show verbatim quote (Figure 3)
the major occurrences of line downtimes consumed between 3 and 15 minutes of production, in equivalent proportions, summing 287 minutes (61% of the whole time) and characterizing the effectuation of short mechanical interventions in the filler for small adjustments (Figure 3).
Equipment failure (breakdowns)Share of lost time61.0 %Adjudicated
Short mechanical interventions in the filler for small adjustments (3-15 min interval)filler
Show verbatim quote (Figure 3)
the major occurrences of line downtimes consumed between 3 and 15 minutes of production, in equivalent proportions, summing 287 minutes (61% of the whole time) and characterizing the effectuation of short mechanical interventions in the filler for small adjustments (Figure 3).
Equipment failure (breakdowns)Lost time287 minAdjudicated
—
Show verbatim quote (Page 11)
Even though the process shows expressive figures for the Quality indicator, between 93 and 98%
noneQuality93.0 %Single extractor
—
Show verbatim quote (Page 11)
Even though the process shows expressive figures for the Quality indicator, between 93 and 98%
noneQuality98.0 %Single extractor

Observation units

  • Beverage PET bottling production line · Whole line or unspecified equipment · Baseline
  • PET bottle filling line · Filling · Baseline