Included study
Proposal for OEE (Overall Equipment Effectiveness) Indicator Deployment in a Beverage Plant
1Bibliographic record
- Authors
- Fabiana Pereira Castro, Fernando Oliveira de Araújo
- Year
- 2012
- Venue
- Brazilian Journal of Operations & Production Management
- Country
- Brazil
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 11 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The investigation is limited to monitoring the OEE indicator in a machine for filling beverage in PET bottles of 1500 mL, operating in a continuous regime of approximately 4,800 units per hour.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Problem in the filler (code 6003)fillerShow verbatim quote (Line Downtimes section / Figure 3)The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3). | Equipment failure (breakdowns) | Number of events | 44.0 events | Adjudicated |
Problem in the filler (code 6003)fillerShow verbatim quote (Line Downtimes section / Figure 3)The code 6003, referring to downtimes caused by problems with the filler, consumed 473 minutes, having occurred 44 times during the period assessed in this work (Figure 3). | Equipment failure (breakdowns) | Lost time | 473 min | Adjudicated |
Problem in the inkjet printer (code 6004)inkjet printerShow verbatim quote (Line Downtimes section)the company spent 245 and 273 minutes to repair the equipment between the studied days 04 and 05. | Equipment failure (breakdowns) | Lost time | 273 min | Both extractors agreed |
Problem in the inkjet printer (code 6004)inkjet printerShow verbatim quote (Line Downtimes section)the company spent 245 and 273 minutes to repair the equipment between the studied days 04 and 05. | Equipment failure (breakdowns) | Lost time | 245 min | Both extractors agreed |
Discarded PET bottles (waste)fillerShow verbatim quote (OEE section, text)According to the history, the waste of these bottles was around 3%. | Process defects (scrap and rework) | Defect rate | 3.00 % | Both extractors agreed |
—Show verbatim quote (Analysis and Result Discussion / Figure 4)On day 09, the third figure below the expected (33%) was a result of successive electrical problems in the packing, inkjet printer and filler, respectively, compromising the final index. | none | OEE | 33.0 % | Both extractors agreed |
—Show verbatim quote (Analysis and Result Discussion / Figure 4)The days 04 and 05 show the smallest figures of the OEE, 8 and 11%, respectively. | none | OEE | 11.0 % | Both extractors agreed |
—Show verbatim quote (Analysis and Result Discussion / Figure 4)The days 04 and 05 show the smallest figures of the OEE, 8 and 11%, respectively. | none | OEE | 8.00 % | Both extractors agreed |
Return/reuse of after-filling PET bottlesfillerShow verbatim quote (Table 3)According to Table 3, an average of 3.6% of the bottles in good conditions of use was reutilized for new bottling processes. | Process defects (scrap and rework) | Defect rate | 3.60 % | Both extractors agreed |
Short mechanical interventions in the filler for small adjustments (3-15 min interval)fillerShow verbatim quote (Figure 3)the major occurrences of line downtimes consumed between 3 and 15 minutes of production, in equivalent proportions, summing 287 minutes (61% of the whole time) and characterizing the effectuation of short mechanical interventions in the filler for small adjustments (Figure 3). | Equipment failure (breakdowns) | Share of lost time | 61.0 % | Adjudicated |
Short mechanical interventions in the filler for small adjustments (3-15 min interval)fillerShow verbatim quote (Figure 3)the major occurrences of line downtimes consumed between 3 and 15 minutes of production, in equivalent proportions, summing 287 minutes (61% of the whole time) and characterizing the effectuation of short mechanical interventions in the filler for small adjustments (Figure 3). | Equipment failure (breakdowns) | Lost time | 287 min | Adjudicated |
—Show verbatim quote (Page 11)Even though the process shows expressive figures for the Quality indicator, between 93 and 98% | none | Quality | 93.0 % | Single extractor |
—Show verbatim quote (Page 11)Even though the process shows expressive figures for the Quality indicator, between 93 and 98% | none | Quality | 98.0 % | Single extractor |
Observation units
- Beverage PET bottling production line · Whole line or unspecified equipment · Baseline
- PET bottle filling line · Filling · Baseline