Included study
Penerapan Metode Total Productive Maintenance untuk Mereduksi Downtime pada Lini Produksi Botol 1 di PT. Grahamas Intitirta
1Bibliographic record
- Authors
- Afifah Azra Laila, Chaznin R. Muhammad, Nita P.A Hidayat
- Year
- 2020
- Venue
- Prosiding Teknik Industri
- DOI
- —
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · 2 machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
PT. Grahamas Intitirta (PT. GI) is a mineral water company.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 4High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Blowing 1Show verbatim quote (abstract)The results showed that the Filling 1 and Blowing 1 had an Overall Equipment Effectiveness (OEE) below the standard, namely 76.13% and 83.32%. | none | OEE | 83.3 % | Both extractors agreed |
—Filling 1Show verbatim quote (abstract)The results showed that the Filling 1 and Blowing 1 had an Overall Equipment Effectiveness (OEE) below the standard, namely 76.13% and 83.32%. | none | OEE | 76.1 % | Both extractors agreed |
downtimeFilling 1Show verbatim quote (abstract)This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours. | Not classifiable from the report | Lost time | 394 hours | Adjudicated |
downtimeBlowing 1Show verbatim quote (abstract)This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours. | Not classifiable from the report | Lost time | 91.4 hours | Adjudicated |
breakdown lossFilling 1Show verbatim quote (Abstract, Results section)This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours. | Equipment failure (breakdowns) | Lost time | 67.6 h | Single extractor |
defect lossBlowing 1Show verbatim quote (Abstract, Results section)This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours. | Process defects (scrap and rework) | Lost time | 14.8 h | Single extractor |
Observation units
- Blowing 1 · Forming, moulding and depositing · Baseline
- Filling 1 · Filling · Baseline
- Filling 1 · Filling · After intervention
- Blowing 1 · Forming, moulding and depositing · After intervention

