foratvise
Get Started
Included study

Penerapan Metode Total Productive Maintenance untuk Mereduksi Downtime pada Lini Produksi Botol 1 di PT. Grahamas Intitirta

Open source

1Bibliographic record

Authors
Afifah Azra Laila, Chaznin R. Muhammad, Nita P.A Hidayat
Year
2020
Venue
Prosiding Teknik Industri
DOI
—
Country
Indonesia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Abstract only
Size
1 plants · 1 lines · 2 machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
PT. Grahamas Intitirta (PT. GI) is a mineral water company.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 4High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Blowing 1
Show verbatim quote (abstract)
The results showed that the Filling 1 and Blowing 1 had an Overall Equipment Effectiveness (OEE) below the standard, namely 76.13% and 83.32%.
noneOEE83.3 %Both extractors agreed
—Filling 1
Show verbatim quote (abstract)
The results showed that the Filling 1 and Blowing 1 had an Overall Equipment Effectiveness (OEE) below the standard, namely 76.13% and 83.32%.
noneOEE76.1 %Both extractors agreed
downtimeFilling 1
Show verbatim quote (abstract)
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
Not classifiable from the reportLost time394 hoursAdjudicated
downtimeBlowing 1
Show verbatim quote (abstract)
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
Not classifiable from the reportLost time91.4 hoursAdjudicated
breakdown lossFilling 1
Show verbatim quote (Abstract, Results section)
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
Equipment failure (breakdowns)Lost time67.6 hSingle extractor
defect lossBlowing 1
Show verbatim quote (Abstract, Results section)
This can reduce Filling 1 downtime from 393.78 hours to 67.62 hours and Blowing 1 from 91.35 hours to 14.75 hours.
Process defects (scrap and rework)Lost time14.8 hSingle extractor

Observation units

  • Blowing 1 · Forming, moulding and depositing · Baseline
  • Filling 1 · Filling · Baseline
  • Filling 1 · Filling · After intervention
  • Blowing 1 · Forming, moulding and depositing · After intervention