Included study
Maintenance Performance Evaluation and Downtime Analysis of Manufacturing Equipment in a Food Manufacturing Company
1Bibliographic record
- Authors
- Nkemakonam Chidiebube Igbokwe, Harold Chukwuemeka Godwin
- Year
- 2021
- Venue
- Journal of Engineering Research and Reports
- Country
- Nigeria
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 1,095 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Necessary data was collected from three years historical maintenance records (production data, records of equipment faults and failures, and factory maintenance compliance sheet) and through twelve months direct observation of manufacturing machines and maintenance activities in a food and beverage manufacturing company based in Anambra state, Nigeria.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?The setting cannot be classified beyond "a food company". | 0 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Section 3 Results and Discussion)the average (Mean value of three years observation) overall equipment effectiveness is 55.30% which is a low value when compared with OEE world standards | none | OEE | 55.3 % | Both extractors agreed |
Scheduled MaintenanceShow verbatim quote (Table 4. Downtime factors)Scheduled Maintenance 42723 40.82 40.82 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 42,723 min | Single extractor |
Scheduled MaintenanceShow verbatim quote (Table 4. Downtime factors)Scheduled Maintenance 42723 40.82 40.82 | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 40.8 % | Single extractor |
Equipment Failures/BreakdownShow verbatim quote (Table 4. Downtime factors)Equipment Failures/Breakdown 25398 24.26 65.08 | Equipment failure (breakdowns) | Lost time | 25,398 min | Single extractor |
Equipment Failures/BreakdownShow verbatim quote (Table 4. Downtime factors)Equipment Failures/Breakdown 25398 24.26 65.08 | Equipment failure (breakdowns) | Share of lost time | 24.3 % | Single extractor |
Waiting for materials to arriveShow verbatim quote (Table 4. Downtime factors)Waiting for materials to arrive 19856 18.93 84.01 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 19,856 min | Single extractor |
Waiting for materials to arriveShow verbatim quote (Table 4. Downtime factors)Waiting for materials to arrive 19856 18.93 84.01 | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 18.9 % | Single extractor |
Maintenance job meetingsShow verbatim quote (Table 4. Downtime factors)Maintenance job meetings 9723 9.29 93.3 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 9,723 min | Single extractor |
Maintenance job meetingsShow verbatim quote (Table 4. Downtime factors)Maintenance job meetings 9723 9.29 93.3 | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 9.29 % | Single extractor |
Waiting for maintenance instruction and ordersShow verbatim quote (Table 4. Downtime factors)Waiting for maintenance instruction and orders 5153 4.92 98.22 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 5,153 min | Single extractor |
Waiting for maintenance instruction and ordersShow verbatim quote (Table 4. Downtime factors)Waiting for maintenance instruction and orders 5153 4.92 98.22 | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 4.92 % | Single extractor |
Miscellaneous activitiesShow verbatim quote (Table 4. Downtime factors)Miscellaneous activities 1797 1.71 100.00 | Not classifiable from the report | Lost time | 1,797 min | Single extractor |
Miscellaneous activitiesShow verbatim quote (Table 4. Downtime factors)Miscellaneous activities 1797 1.71 100.00 | Not classifiable from the report | Share of lost time | 1.71 % | Single extractor |
Observation units
- Food manufacturing company (whole plant) · Whole line or unspecified equipment · Baseline