Included study
Enhancing Productivity through Quick Changeovers: A SMED-Based Methodology in Manufacturing Industry
1Bibliographic record
- Authors
- Amir Hamzah Abdul Rasib, Mohd Syahfiz Akmal Yaakub, Ihwan Ghazali, M. S. Abd Rahman, Z. F. Mohamad Rafaai
- Year
- 2026
- Venue
- International Journal of Academic Research in Business and Social Sciences
- Country
- Malaysia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
This study involves collecting data to analyze the current production line at Zaliza Sdn. Bhd., a small and medium-sized enterprise established in June 2006 that specializes in flavored beverages such as soy milk, tamarind, and honey tamarind.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Bringing bottle caps towards the filling machinefilling machineShow verbatim quote (Table 2)1 Bringing bottle caps towards the filling machine 35 35 - | Setup and adjustments | Lost time | 35.0 s | Single extractor |
Switching and bringing different batch of labelled bottles towards the filling machinefilling machineShow verbatim quote (Table 2)2 Switching and bringing different batch of labelled bottles towards the filling machine 65 65 - | Setup and adjustments | Lost time | 65.0 s | Single extractor |
Bottle labeling (per bag)Show verbatim quote (Table 2)3 Bottle labeling (per bag) 900 - 900 | Setup and adjustments | Lost time | 900 s | Single extractor |
Filling machine setupfilling machineShow verbatim quote (Table 2)4 Filling machine setup 120 120 - | Setup and adjustments | Lost time | 120 s | Single extractor |
Bringing carton boxes towards the filling machinefilling machineShow verbatim quote (Table 2)5 Bringing carton boxes towards the filling machine 20 - 20 | Setup and adjustments | Lost time | 20.0 s | Single extractor |
Setting up raw materials for cooking processShow verbatim quote (Table 2)6 Setting up raw materials for cooking process 1800 1800 - | Setup and adjustments | Lost time | 1,800 s | Single extractor |
—Show verbatim quote (Table 2)total 2940 2020 920 | Setup and adjustments | Lost time | 2,940 s | Single extractor |
Bringing carton boxes, labelled bottles and bottle caps towards the filling machinefilling machineShow verbatim quote (Table 4)1 Bringing carton boxes, labelled bottles and bottle caps towards the filling machine 90 - 90 | Setup and adjustments | Lost time | 90.0 s | Single extractor |
Bottle labeling (per bag)Show verbatim quote (Table 4)2 Bottle labeling (per bag) 600 - 600 | Setup and adjustments | Lost time | 600 s | Single extractor |
Filling machine setupfilling machineShow verbatim quote (Table 4)3 Filling machine setup 120 120 - | Setup and adjustments | Lost time | 120 s | Single extractor |
Setting up raw materials for cooking processShow verbatim quote (Table 4)4 Setting up raw materials for cooking process 1200 - 1200 | Setup and adjustments | Lost time | 1,200 s | Single extractor |
—Show verbatim quote (Table 4)total 2010 120 1890 | Setup and adjustments | Lost time | 2,010 s | Single extractor |
Observation units
- Filling line (flavor changeover) · Whole line or unspecified equipment · Baseline
- Filling line (flavor changeover) · Whole line or unspecified equipment · After intervention