foratvise
Get Started
Included study

Enhancing Productivity through Quick Changeovers: A SMED-Based Methodology in Manufacturing Industry

Open source

1Bibliographic record

Authors
Amir Hamzah Abdul Rasib, Mohd Syahfiz Akmal Yaakub, Ihwan Ghazali, M. S. Abd Rahman, Z. F. Mohamad Rafaai
Year
2026
Venue
International Journal of Academic Research in Business and Social Sciences
Country
Malaysia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
This study involves collecting data to analyze the current production line at Zaliza Sdn. Bhd., a small and medium-sized enterprise established in June 2006 that specializes in flavored beverages such as soy milk, tamarind, and honey tamarind.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Bringing bottle caps towards the filling machinefilling machine
Show verbatim quote (Table 2)
1 Bringing bottle caps towards the filling machine 35 35 -
Setup and adjustmentsLost time35.0 sSingle extractor
Switching and bringing different batch of labelled bottles towards the filling machinefilling machine
Show verbatim quote (Table 2)
2 Switching and bringing different batch of labelled bottles towards the filling machine 65 65 -
Setup and adjustmentsLost time65.0 sSingle extractor
Bottle labeling (per bag)
Show verbatim quote (Table 2)
3 Bottle labeling (per bag) 900 - 900
Setup and adjustmentsLost time900 sSingle extractor
Filling machine setupfilling machine
Show verbatim quote (Table 2)
4 Filling machine setup 120 120 -
Setup and adjustmentsLost time120 sSingle extractor
Bringing carton boxes towards the filling machinefilling machine
Show verbatim quote (Table 2)
5 Bringing carton boxes towards the filling machine 20 - 20
Setup and adjustmentsLost time20.0 sSingle extractor
Setting up raw materials for cooking process
Show verbatim quote (Table 2)
6 Setting up raw materials for cooking process 1800 1800 -
Setup and adjustmentsLost time1,800 sSingle extractor
—
Show verbatim quote (Table 2)
total 2940 2020 920
Setup and adjustmentsLost time2,940 sSingle extractor
Bringing carton boxes, labelled bottles and bottle caps towards the filling machinefilling machine
Show verbatim quote (Table 4)
1 Bringing carton boxes, labelled bottles and bottle caps towards the filling machine 90 - 90
Setup and adjustmentsLost time90.0 sSingle extractor
Bottle labeling (per bag)
Show verbatim quote (Table 4)
2 Bottle labeling (per bag) 600 - 600
Setup and adjustmentsLost time600 sSingle extractor
Filling machine setupfilling machine
Show verbatim quote (Table 4)
3 Filling machine setup 120 120 -
Setup and adjustmentsLost time120 sSingle extractor
Setting up raw materials for cooking process
Show verbatim quote (Table 4)
4 Setting up raw materials for cooking process 1200 - 1200
Setup and adjustmentsLost time1,200 sSingle extractor
—
Show verbatim quote (Table 4)
total 2010 120 1890
Setup and adjustmentsLost time2,010 sSingle extractor

Observation units

  • Filling line (flavor changeover) · Whole line or unspecified equipment · Baseline
  • Filling line (flavor changeover) · Whole line or unspecified equipment · After intervention