Included study
Productivity Improvement Through the Application of Lean Six Sigma Tools in a Non-Alcoholic Beverage Company
1Bibliographic record
- Authors
- Stefanía Carolina Huerta Sánchez, Cesar David Mesia Perez, Rafael Mauricio Villanueva Flores, Jorge Alfredo Montoya Barragán
- Year
- 2025
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The study was conducted on a specific bottling line.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
mechanical failuresShow verbatim quote (Section 1 Introduction)16,800 minutes/year lost to changeover times (setup), 1,120 minutes/year due to mechanical failures, 42,336 defective units/year, and 17,472 minutes/year spent searching for tools. | Equipment failure (breakdowns) | Lost time | 1,120 min/year | Both extractors agreed |
format changeover (Set Up)Show verbatim quote (Section 4.2)A total of 16,800 minutes per year associated with format changeover (Set Up) were identified, equivalent to 10.45% of productive time. | Setup and adjustments | Lost time | 16,800 min/year | Both extractors agreed |
tool searchShow verbatim quote (Section 4.1)During the diagnostic phase, 17,472 annual minutes were identified as being associated with tool search activities, equivalent to 10.87% of total working time. | Not classifiable from the report | Lost time | 17,472 min/year | Both extractors agreed |
—Show verbatim quote (Abstract / Section 3)an improvement of Overall Equipment Effectiveness (OEE) from 62% to 83% | none | OEE | 62.0 % | Both extractors agreed |
non-conformanceShow verbatim quote (Table 1)Defect rate (%) 9.62% 5.80 – 6.00 % – 40 % | Process defects (scrap and rework) | Defect rate | 9.62 % | Single extractor |
tool searchShow verbatim quote (Section 4.1)During the diagnostic phase, 17,472 annual minutes were identified as being associated with tool search activities, equivalent to 10.87% of total working time. | Not classifiable from the report | Share of lost time | 10.9 % | Single extractor |
format changeover (Set Up)Show verbatim quote (Section 4.2)A total of 16,800 minutes per year associated with format changeover (Set Up) were identified, equivalent to 10.45% of productive time. | Setup and adjustments | Share of planned time | 10.5 % | Single extractor |
mechanical failurereverse osmosis systemShow verbatim quote (Section 4.3)Mechanical failure downtime improved from 15.38% (73.83 min/shift) to 2.59% (12.44 min/shift) following implementation. | Equipment failure (breakdowns) | Lost time | 73.8 min/shift | Single extractor |
mechanical failurereverse osmosis systemShow verbatim quote (Section 4.3)Mechanical failure downtime improved from 15.38% (73.83 min/shift) to 2.59% (12.44 min/shift) following implementation. | Equipment failure (breakdowns) | Share of planned time | 15.4 % | Single extractor |
—Show verbatim quote (Section 5 Testing and Results, page 5)the initial non-conformance rate was 9.62% | Process defects (scrap and rework) | Defect rate | 9.62 % | Single extractor |
—Show verbatim quote (Introduction, page 2)The technical diagnostic identified key causes, including 16,800 minutes/year lost to changeover times (setup), 1,120 minutes/year due to mechanical failures, 42,336 defective units/year, and 17,472 minutes/year spent searching for tools. | Process defects (scrap and rework) | Number of events | 42,336 units/year | Single extractor |
—Show verbatim quote (Section 5 Testing and Results, page 5)The initial analysis revealed that the production line recorded a productivity level of 12.53 L/sol, representing a 34.7% deviation below the industry benchmark of 19.2 L/sol | none | Throughput | 12.5 L/sol | Single extractor |
Observation units
- Water bottling line (As-Is diagnostic) · Whole line or unspecified equipment · Baseline
- Production line · Whole line or unspecified equipment · Baseline