Productivity Improvement Through the Application of Lean Six Sigma Tools in a Non-Alcoholic Beverage Company

Open source

1Bibliographic record

Authors
Stefanía Carolina Huerta Sánchez, Cesar David Mesia Perez, Rafael Mauricio Villanueva Flores, Jorge Alfredo Montoya Barragán
Year
2025
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
The study was conducted on a specific bottling line.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
mechanical failures
Show verbatim quote (Section 1 Introduction)
16,800 minutes/year lost to changeover times (setup), 1,120 minutes/year due to mechanical failures, 42,336 defective units/year, and 17,472 minutes/year spent searching for tools.
Equipment failure (breakdowns)Lost time1,120 min/yearBoth extractors agreed
format changeover (Set Up)
Show verbatim quote (Section 4.2)
A total of 16,800 minutes per year associated with format changeover (Set Up) were identified, equivalent to 10.45% of productive time.
Setup and adjustmentsLost time16,800 min/yearBoth extractors agreed
tool search
Show verbatim quote (Section 4.1)
During the diagnostic phase, 17,472 annual minutes were identified as being associated with tool search activities, equivalent to 10.87% of total working time.
Not classifiable from the reportLost time17,472 min/yearBoth extractors agreed
—
Show verbatim quote (Abstract / Section 3)
an improvement of Overall Equipment Effectiveness (OEE) from 62% to 83%
noneOEE62.0 %Both extractors agreed
non-conformance
Show verbatim quote (Table 1)
Defect rate (%) 9.62% 5.80 – 6.00 % – 40 %
Process defects (scrap and rework)Defect rate9.62 %Single extractor
tool search
Show verbatim quote (Section 4.1)
During the diagnostic phase, 17,472 annual minutes were identified as being associated with tool search activities, equivalent to 10.87% of total working time.
Not classifiable from the reportShare of lost time10.9 %Single extractor
format changeover (Set Up)
Show verbatim quote (Section 4.2)
A total of 16,800 minutes per year associated with format changeover (Set Up) were identified, equivalent to 10.45% of productive time.
Setup and adjustmentsShare of planned time10.5 %Single extractor
mechanical failurereverse osmosis system
Show verbatim quote (Section 4.3)
Mechanical failure downtime improved from 15.38% (73.83 min/shift) to 2.59% (12.44 min/shift) following implementation.
Equipment failure (breakdowns)Lost time73.8 min/shiftSingle extractor
mechanical failurereverse osmosis system
Show verbatim quote (Section 4.3)
Mechanical failure downtime improved from 15.38% (73.83 min/shift) to 2.59% (12.44 min/shift) following implementation.
Equipment failure (breakdowns)Share of planned time15.4 %Single extractor
—
Show verbatim quote (Section 5 Testing and Results, page 5)
the initial non-conformance rate was 9.62%
Process defects (scrap and rework)Defect rate9.62 %Single extractor
—
Show verbatim quote (Introduction, page 2)
The technical diagnostic identified key causes, including 16,800 minutes/year lost to changeover times (setup), 1,120 minutes/year due to mechanical failures, 42,336 defective units/year, and 17,472 minutes/year spent searching for tools.
Process defects (scrap and rework)Number of events42,336 units/yearSingle extractor
—
Show verbatim quote (Section 5 Testing and Results, page 5)
The initial analysis revealed that the production line recorded a productivity level of 12.53 L/sol, representing a 34.7% deviation below the industry benchmark of 19.2 L/sol
noneThroughput12.5 L/solSingle extractor

Observation units

  • Water bottling line (As-Is diagnostic) · Whole line or unspecified equipment · Baseline
  • Production line · Whole line or unspecified equipment · Baseline