Proposal to Enhance Productivity by Applying Lean Manufacturing Tools in a Fish Canning Company
1Bibliographic record
- Authors
- Flavia Espinoza-Montero, Rodrigo R. Quintanilla-Chalan, Jorge Antonio Corzo-Chávez, Gino Viacava-Campos
- Year
- 2026
- Venue
- Congreso Internacional de Ingeniería Industrial de la Universidad de Lima
- Country
- Peru
- Segment
- Meat, poultry and seafood
- Process family
- Slaughter, cutting and primary processing
- Study type
- Simulation (input data only)
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 2 machines
- Observation period
- 30 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
the studied company is a medium-sized fish canning processor operating two 8-hour shifts with an installed capacity of 180 tons per shift.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%. | 0 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Overheating due to filter cloggingAutoclaveShow verbatim quote (Table III)Overheating due to filter clogging 4 30 2.1 | Equipment failure (breakdowns) | Number of events | 4.00 occurrences/month | Both extractors agreed |
Control instrument misalignmentAutoclaveShow verbatim quote (Table III)Control instrument misalignment 5 40 3.2 | Equipment failure (breakdowns) | Number of events | 5.00 occurrences/month | Both extractors agreed |
Sealing mechanism malfunctionAutoclaveShow verbatim quote (Table III)Sealing mechanism malfunction 9 28 3.8 | Equipment failure (breakdowns) | Number of events | 9.00 occurrences/month | Both extractors agreed |
Pressure calibration failureAutoclaveShow verbatim quote (Table III)Pressure calibration failure 12 35 4.5 | Equipment failure (breakdowns) | Number of events | 12.0 occurrences/month | Both extractors agreed |
Gasket wear and replacementAutoclaveShow verbatim quote (Table III)Gasket wear and replacement 7 22 2.7 | Equipment failure (breakdowns) | Number of events | 7.00 occurrences/month | Both extractors agreed |
—Show verbatim quote (Table IV)Defect rate 13% 4.3% | Process defects (scrap and rework) | Defect rate | 13.0 % | Adjudicated |
Overheating due to filter cloggingAutoclaveShow verbatim quote (Table III)Overheating due to filter clogging 4 30 2.1 | Equipment failure (breakdowns) | Share of planned time | 2.10 % | Both extractors agreed |
Overheating due to filter cloggingAutoclaveShow verbatim quote (Table III)Overheating due to filter clogging 4 30 2.1 | Equipment failure (breakdowns) | Mean event duration | 30.0 min | Both extractors agreed |
—Show verbatim quote (Abstract)Labor productivity increased from 6 to 7 units/h | none | Throughput | 6.00 units/h | Both extractors agreed |
Control instrument misalignmentAutoclaveShow verbatim quote (Table III)Control instrument misalignment 5 40 3.2 | Equipment failure (breakdowns) | Share of planned time | 3.20 % | Both extractors agreed |
Control instrument misalignmentAutoclaveShow verbatim quote (Table III)Control instrument misalignment 5 40 3.2 | Equipment failure (breakdowns) | Mean event duration | 40.0 min | Both extractors agreed |
Sealing mechanism malfunctionAutoclaveShow verbatim quote (Table III)Sealing mechanism malfunction 9 28 3.8 | Equipment failure (breakdowns) | Share of planned time | 3.80 % | Both extractors agreed |
Sealing mechanism malfunctionAutoclaveShow verbatim quote (Table III)Sealing mechanism malfunction 9 28 3.8 | Equipment failure (breakdowns) | Mean event duration | 28.0 min | Both extractors agreed |
Pressure calibration failureAutoclaveShow verbatim quote (Table III)Pressure calibration failure 12 35 4.5 | Equipment failure (breakdowns) | Share of planned time | 4.50 % | Both extractors agreed |
Pressure calibration failureAutoclaveShow verbatim quote (Table III)Pressure calibration failure 12 35 4.5 | Equipment failure (breakdowns) | Mean event duration | 35.0 min | Both extractors agreed |
Gasket wear and replacementAutoclaveShow verbatim quote (Table III)Gasket wear and replacement 7 22 2.7 | Equipment failure (breakdowns) | Share of planned time | 2.70 % | Both extractors agreed |
Gasket wear and replacementAutoclaveShow verbatim quote (Table III)Gasket wear and replacement 7 22 2.7 | Equipment failure (breakdowns) | Mean event duration | 22.0 min | Both extractors agreed |
—Show verbatim quote (Section III Results, Fig. 10)the OEE indicator initially stood at 63.2%, with a target of 85%. | none | OEE | 63.2 % | Both extractors agreed |
Calibration verificationSealing machineShow verbatim quote (Table I)Calibration verification 85 min X | Setup and adjustments | Lost time | 85.0 min | Single extractor |
Daily cleaning of sealing headsSealing machineShow verbatim quote (Table I)Daily cleaning of sealing heads 65 s X | Setup and adjustments | Lost time | 65.0 s | Single extractor |
Pressure adjustmentSealing machineShow verbatim quote (Table I)Pressure adjustment 60 s X | Setup and adjustments | Lost time | 60.0 s | Single extractor |
Seal replacementSealing machineShow verbatim quote (Table I)Seal replacement 85 s X | Setup and adjustments | Lost time | 85.0 s | Single extractor |
Inspection of worn partsSealing machineShow verbatim quote (Table I)Inspection of worn parts 60 s X | Setup and adjustments | Lost time | 60.0 s | Single extractor |
Roller inspectionSealing machineShow verbatim quote (Table I)Roller inspection 70 s X | Setup and adjustments | Lost time | 70.0 s | Single extractor |
Sealing mechanism adjustmentSealing machineShow verbatim quote (Table I)Sealing mechanism adjust- ment 90 s X | Setup and adjustments | Lost time | 90.0 s | Single extractor |
Inspection and lubrication of moving partsSealing machineShow verbatim quote (Table I)Inspection and lubrication of moving parts 80 s X | Setup and adjustments | Lost time | 80.0 s | Single extractor |
General equipment cleaningSealing machineShow verbatim quote (Table I)General equipment cleaning 120 s X | Setup and adjustments | Lost time | 120 s | Single extractor |
Gasket replacementSealing machineShow verbatim quote (Table I)Gasket replacement 80 s X | Setup and adjustments | Lost time | 80.0 s | Single extractor |
—AutoclaveShow verbatim quote (Section IV Discussion)MTBF improved from 3.2 to 6.8 h, and MTTR decreased from 28 to 15 min, confirming increased equipment reliability and faster recovery. | Equipment failure (breakdowns) | Time between events | 3.20 h | Single extractor |
—AutoclaveShow verbatim quote (Section IV Discussion)MTBF improved from 3.2 to 6.8 h, and MTTR decreased from 28 to 15 min, confirming increased equipment reliability and faster recovery. | Equipment failure (breakdowns) | Mean event duration | 28.0 min | Single extractor |
—Show verbatim quote (Section IV Discussion)The availability rate increased from 70.4% to 85.2%, closing 91.7% of the performance gap toward the 90% target. | none | Availability | 70.4 % | Single extractor |
equipment failure rateShow verbatim quote (Abstract)equipment failure rates declined from 13.67% to 4.59% | Equipment failure (breakdowns) | Share of lost time | 13.7 % | Single extractor |
—Sealing machineShow verbatim quote (Results section, page 58)the setup time of the sealing machine was reduced from 12.9 to 5.3 min | Setup and adjustments | Lost time | 12.9 min | Single extractor |
Observation units
- Autoclave · Sterilization (retort, UHT) · Baseline
- Whole plant · Whole line or unspecified equipment · Baseline
- Sealing machine · Capping and seaming · Baseline