Included study
Optimalisasi Perawatan Mesin untuk Meningkatkan Efisiensi Biaya dan Waktu Operasional pada Usaha Penggilingan Padi Sabar Sakdremo
1Bibliographic record
- Authors
- Prayogo Widagdo, Reza Widhar Pahlevi
- Year
- 2026
- Venue
- Journal of Economics Business Accounting and Management (JEBAM)
- Country
- Indonesia
- Segment
- Grain and oilseed milling
- Process family
- Slaughter, cutting and primary processing
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- —
- Data collection
- questionnaire
- Intervention
Show the setting as described by the study
Usaha Penggilingan Padi Sabar Sakdremo yang beroperasi sejak tahun 2004 di Desa Demangan, Karangdowo, Klaten, bergerak di bidang jasa pascapanen terpadu (pengeringan, pengupasan gabah pecah kulit, penyosohan beras, dan pembelian gabah pecah kulit)
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
NozzlenozzleShow verbatim quote (Tabel 3)Nozzle Rp260.000 Rp103.000 2 Jam 15 Menit 0 Jam 40 Menit | Equipment failure (breakdowns) | Lost time | 40.0 min | Single extractor |
Piston, ring piston, dan linerPiston, ring piston, linerShow verbatim quote (Table 2, page 11)Piston, ring piston, dan liner | Asap putih, tenaga mesin menurun, kehilangan kompresi | Teknisi eksternal | Rp750.000 | 7 Jam 0 Menit | Equipment failure (breakdowns) | Lost time | 7.00 h | Single extractor |
Metal jalanMetal jalanShow verbatim quote (Table 2, page 11)Metal jalan | Suara kasar, asap hitam akibat keausan | Teknisi eksternal | Rp187.000 | 3 Jam 0 Menit | Equipment failure (breakdowns) | Lost time | 3.00 h | Single extractor |
Pompa oliPompa oliShow verbatim quote (Table 3, page 13)Pompa oli | Rp520.000 | Rp350.000 | 3 Jam 30 Menit | 1 Jam 0 Menit | Equipment failure (breakdowns) | Lost time | 1.00 h | Single extractor |
Observation units
- Mesin diesel penggerak utama (Usaha Penggilingan Padi Sabar Sakdremo) · Utilities (steam, compressed air, chilled water, power) · After intervention
- Main diesel engine · Whole line or unspecified equipment · Baseline
- Main diesel engine · Whole line or unspecified equipment · After intervention

