PENURUNAN DOWNTIME UNTUK MENINGKATKAN ACHIEVEMENT (ACH) MELALUI IMPLEMENTASI TPM (TOTAL PRODUCTIVE MAINTENANCE) DAN ANALISIS SIX BIG LOSSES DI PT TES HF
1Bibliographic record
- Authors
- Dede Yusup, Abby Yazid Bustommy, Sita Kurniaty Ratoko
- Year
- 2026
- Venue
- Industri Inovatif Jurnal Teknik Industri
- Country
- Indonesia
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 151 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Penelitian ini bertujuan menganalisis efektivitas mesin Packaging Line 1 di PT TES HF menggunakan metode Overall Equipment Effectiveness (OEE)
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Abstract)Hasil menunjukkan rata-rata OEE sebelum implementasi sebesar 84,01% | none | OEE | 84.0 % | Single extractor |
—Show verbatim quote (Abstract)dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69% | none | Availability | 97.6 % | Single extractor |
—Show verbatim quote (Abstract)dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69% | none | Performance | 89.0 % | Single extractor |
—Show verbatim quote (Abstract)dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69% | none | Quality | 96.7 % | Single extractor |
—Show verbatim quote (Page 3)akumulasi downtime Mesin Packaging Line 1 selama periode November 2025 hingga Maret 2026 mencapai 93.307 menit | Not classifiable from the report | Lost time | 93,307 min | Single extractor |
—Show verbatim quote (Page 3)akumulasi downtime Mesin Packaging Line 1 selama periode November 2025 hingga Maret 2026 mencapai 93.307 menit dengan rata-rata persentase sebesar 7,59% | Not classifiable from the report | Share of planned time | 7.59 % | Single extractor |
—Show verbatim quote (Page 5)Kategori Idling and Minor Stoppages tercatat memberikan kontribusi sebesar 35,78% atau setara dengan 33.384 menit | Idling and minor stops (micro-stops) | Lost time | 33,384 min | Single extractor |
—Show verbatim quote (Page 5)Kategori Idling and Minor Stoppages tercatat memberikan kontribusi sebesar 35,78% atau setara dengan 33.384 menit | Idling and minor stops (micro-stops) | Share of lost time | 35.8 % | Single extractor |
—Show verbatim quote (Page 5)Technical Breakdown menyumbang 31,27% atau 29.176 menit dari total loss time sebesar 93.308 menit | Equipment failure (breakdowns) | Lost time | 29,176 min | Single extractor |
—Show verbatim quote (Page 5)Technical Breakdown menyumbang 31,27% atau 29.176 menit dari total loss time sebesar 93.308 menit | Equipment failure (breakdowns) | Share of lost time | 31.3 % | Single extractor |
pisau perforasi tumpul, patah, atau kotorpisau perforasiShow verbatim quote (Page 5)gangguan operasional paling sering disebabkan oleh kondisi pisau perforasi yang tumpul, patah, atau kotor dengan frekuensi sebanyak 1.576 kejadian | Equipment failure (breakdowns) | Number of events | 1,576 events | Single extractor |
pisau perforasi tumpul, patah, atau kotorpisau perforasiShow verbatim quote (Page 5)pisau perforasi yang tumpul, patah, atau kotor dengan frekuensi sebanyak 1.576 kejadian (34,03%) | Equipment failure (breakdowns) | Share of loss events | 34.0 % | Single extractor |
roll tarik macetroll tarikShow verbatim quote (Page 5)roll tarik macet sebanyak 924 kejadian (19,95%) | Idling and minor stops (micro-stops) | Number of events | 924 events | Single extractor |
roll tarik macetroll tarikShow verbatim quote (Page 5)roll tarik macet sebanyak 924 kejadian (19,95%) | Idling and minor stops (micro-stops) | Share of loss events | 20.0 % | Single extractor |
kemasan tidak tersusun rapi (ngacak)packaging mechanismShow verbatim quote (Page 5)kemasan tidak tersusun rapi (ngacak) sebanyak 824 kejadian (17,79%) | Idling and minor stops (micro-stops) | Number of events | 824 events | Single extractor |
kemasan tidak tersusun rapi (ngacak)packaging mechanismShow verbatim quote (Page 5)kemasan tidak tersusun rapi (ngacak) sebanyak 824 kejadian (17,79%) | Idling and minor stops (micro-stops) | Share of loss events | 17.8 % | Single extractor |
slendang problemslendangShow verbatim quote (Page 5)slendang problem sebanyak 700 kejadian (15,11%) | Idling and minor stops (micro-stops) | Number of events | 700 events | Single extractor |
slendang problemslendangShow verbatim quote (Page 5)slendang problem sebanyak 700 kejadian (15,11%) | Idling and minor stops (micro-stops) | Share of loss events | 15.1 % | Single extractor |
keriput pada kemasanpackagingShow verbatim quote (Page 5)keriput pada kemasan sebanyak 608 kejadian (13,12%) | Process defects (scrap and rework) | Number of events | 608 events | Single extractor |
keriput pada kemasanpackagingShow verbatim quote (Page 5)keriput pada kemasan sebanyak 608 kejadian (13,12%) | Process defects (scrap and rework) | Share of loss events | 13.1 % | Single extractor |
—Show verbatim quote (Abstract)Setelah implementasi TPM, downtime turun 6,77%, OEE meningkat menjadi 89,97% | none | OEE | 90.0 % | Single extractor |
Observation units
- Packaging Line 1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline