PENURUNAN DOWNTIME UNTUK MENINGKATKAN ACHIEVEMENT (ACH) MELALUI IMPLEMENTASI TPM (TOTAL PRODUCTIVE MAINTENANCE) DAN ANALISIS SIX BIG LOSSES DI PT TES HF

Open source

1Bibliographic record

Authors
Dede Yusup, Abby Yazid Bustommy, Sita Kurniaty Ratoko
Year
2026
Venue
Industri Inovatif Jurnal Teknik Industri
Country
Indonesia
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
151 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Penelitian ini bertujuan menganalisis efektivitas mesin Packaging Line 1 di PT TES HF menggunakan metode Overall Equipment Effectiveness (OEE)

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Abstract)
Hasil menunjukkan rata-rata OEE sebelum implementasi sebesar 84,01%
noneOEE84.0 %Single extractor
—
Show verbatim quote (Abstract)
dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69%
noneAvailability97.6 %Single extractor
—
Show verbatim quote (Abstract)
dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69%
nonePerformance89.0 %Single extractor
—
Show verbatim quote (Abstract)
dengan Availability 97,60%, Performance 88,95%, dan Quality 96,69%
noneQuality96.7 %Single extractor
—
Show verbatim quote (Page 3)
akumulasi downtime Mesin Packaging Line 1 selama periode November 2025 hingga Maret 2026 mencapai 93.307 menit
Not classifiable from the reportLost time93,307 minSingle extractor
—
Show verbatim quote (Page 3)
akumulasi downtime Mesin Packaging Line 1 selama periode November 2025 hingga Maret 2026 mencapai 93.307 menit dengan rata-rata persentase sebesar 7,59%
Not classifiable from the reportShare of planned time7.59 %Single extractor
—
Show verbatim quote (Page 5)
Kategori Idling and Minor Stoppages tercatat memberikan kontribusi sebesar 35,78% atau setara dengan 33.384 menit
Idling and minor stops (micro-stops)Lost time33,384 minSingle extractor
—
Show verbatim quote (Page 5)
Kategori Idling and Minor Stoppages tercatat memberikan kontribusi sebesar 35,78% atau setara dengan 33.384 menit
Idling and minor stops (micro-stops)Share of lost time35.8 %Single extractor
—
Show verbatim quote (Page 5)
Technical Breakdown menyumbang 31,27% atau 29.176 menit dari total loss time sebesar 93.308 menit
Equipment failure (breakdowns)Lost time29,176 minSingle extractor
—
Show verbatim quote (Page 5)
Technical Breakdown menyumbang 31,27% atau 29.176 menit dari total loss time sebesar 93.308 menit
Equipment failure (breakdowns)Share of lost time31.3 %Single extractor
pisau perforasi tumpul, patah, atau kotorpisau perforasi
Show verbatim quote (Page 5)
gangguan operasional paling sering disebabkan oleh kondisi pisau perforasi yang tumpul, patah, atau kotor dengan frekuensi sebanyak 1.576 kejadian
Equipment failure (breakdowns)Number of events1,576 eventsSingle extractor
pisau perforasi tumpul, patah, atau kotorpisau perforasi
Show verbatim quote (Page 5)
pisau perforasi yang tumpul, patah, atau kotor dengan frekuensi sebanyak 1.576 kejadian (34,03%)
Equipment failure (breakdowns)Share of loss events34.0 %Single extractor
roll tarik macetroll tarik
Show verbatim quote (Page 5)
roll tarik macet sebanyak 924 kejadian (19,95%)
Idling and minor stops (micro-stops)Number of events924 eventsSingle extractor
roll tarik macetroll tarik
Show verbatim quote (Page 5)
roll tarik macet sebanyak 924 kejadian (19,95%)
Idling and minor stops (micro-stops)Share of loss events20.0 %Single extractor
kemasan tidak tersusun rapi (ngacak)packaging mechanism
Show verbatim quote (Page 5)
kemasan tidak tersusun rapi (ngacak) sebanyak 824 kejadian (17,79%)
Idling and minor stops (micro-stops)Number of events824 eventsSingle extractor
kemasan tidak tersusun rapi (ngacak)packaging mechanism
Show verbatim quote (Page 5)
kemasan tidak tersusun rapi (ngacak) sebanyak 824 kejadian (17,79%)
Idling and minor stops (micro-stops)Share of loss events17.8 %Single extractor
slendang problemslendang
Show verbatim quote (Page 5)
slendang problem sebanyak 700 kejadian (15,11%)
Idling and minor stops (micro-stops)Number of events700 eventsSingle extractor
slendang problemslendang
Show verbatim quote (Page 5)
slendang problem sebanyak 700 kejadian (15,11%)
Idling and minor stops (micro-stops)Share of loss events15.1 %Single extractor
keriput pada kemasanpackaging
Show verbatim quote (Page 5)
keriput pada kemasan sebanyak 608 kejadian (13,12%)
Process defects (scrap and rework)Number of events608 eventsSingle extractor
keriput pada kemasanpackaging
Show verbatim quote (Page 5)
keriput pada kemasan sebanyak 608 kejadian (13,12%)
Process defects (scrap and rework)Share of loss events13.1 %Single extractor
—
Show verbatim quote (Abstract)
Setelah implementasi TPM, downtime turun 6,77%, OEE meningkat menjadi 89,97%
noneOEE90.0 %Single extractor

Observation units

  • Packaging Line 1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Packaging Line 1 · Packaging (forming, sealing, wrapping, case packing, palletizing) · After intervention