Automation and instrumentation failure

Equipment failure (breakdowns)AvailabilityWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 2 of the 127 studies that could observe it (limited evidence).

What happens

A fault develops in the control or instrumentation layer of the line, such as a PLC or drive malfunction, a failed sensor or transmitter, a damaged cable or connector, or corrupted control logic. Because equipment control, interlocks or measurement depend on these elements, the affected machine or section loses proper function and cannot continue running safely or correctly until the fault is diagnosed and repaired.

What is done about it

Apply preventive calibration, testing and cleaning of sensors, transmitters and control cabinets on a scheduled basis, keep spare I/O cards, drives and critical instruments on hand, and use condition monitoring or diagnostic alarms on control networks to detect degradation before a hard failure occurs. Where the loop is critical to production continuity, add redundancy or voting logic to tolerate a single instrument or module failure.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.2–2.0%]
Expected share of lost time
0.4% [0.1–1.1%]
Share of lost time when present
56% [45–66%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.9% [0.1–3.0%]13 studies
  • Soft drinks, bottled water and juices
    0.8% [0.1–2.4%]26 studies
  • Brewing, wine and spirits
    0.9% [0.1–3.0%]11 studies
  • Bakery and pasta
    1.1% [0.2–3.5%]24 studies
  • Meat, poultry and seafood
    0.9% [0.1–3.1%]9 studies
  • Fruit and vegetable processing
    0.9% [0.1–3.0%]7 studies
  • Grain and oilseed milling
    0.9% [0.1–3.2%]6 studies
  • Sugar and confectionery
    1.3% [0.2–4.3%]9 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.0%]5 studies
  • Animal feed and pet food
    0.9% [0.1–3.2%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.0%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A fault develops in the control or instrumentation layer of the line, such as a PLC or drive malfunction, a failed sensor or transmitter, a damaged cable or connector, or corrupted control logic. Because equipment control, interlocks or measurement depend on these elements, the affected machine or section loses proper function and cannot continue running safely or correctly until the fault is diagnosed and repaired.

How it looks in SCADA data

Engineering guidance

The event appears as a controller or instrumentation fault alarm, loss of communication between the PLC and field devices, frozen or out-of-range sensor readings, or an unexpected drive trip, all logged against an automation or instrumentation downtime reason code. Equipment state transitions to fault or stopped, and upstream or downstream machines may show starvation or blocking while the affected station is down for repair.

Countermeasure

Engineering guidance

Apply preventive calibration, testing and cleaning of sensors, transmitters and control cabinets on a scheduled basis, keep spare I/O cards, drives and critical instruments on hand, and use condition monitoring or diagnostic alarms on control networks to detect degradation before a hard failure occurs. Where the loop is critical to production continuity, add redundancy or voting logic to tolerate a single instrument or module failure.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 2.00 min · as reported: “Instruções ao operador B”
    Show verbatim quote
    9 Instruções ao operador B 2 0
  2. Lost time: 0 min · as reported: “Instruções ao operador B”
    Show verbatim quote
    9 Instruções ao operador B 2 0
  3. Time between events: 6.18 log(min) · as reported: “Maintenance Instrumentation”
    Show verbatim quote
    Maintenance Instrumentation 15 6.178 (5.289; 7.067)
  4. Time between events: 6.24 log(min) · as reported: “Maintenance Industrial Automation”
    Show verbatim quote
    Maintenance Industrial Automation 9 6.242 (5.095; 7.390)
  5. Number of events: 9.00 events · as reported: “Maintenance Industrial Automation”
    Show verbatim quote
    Maintenance Industrial Automation 9 6.242 (5.095; 7.390)
  6. Number of events: 15.0 events · as reported: “Maintenance Instrumentation”
    Show verbatim quote
    Maintenance Instrumentation 15 6.178 (5.289; 7.067)
  7. Number of events: 50.0 events · as reported: “Instrumentation (INST)”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  8. Mean event duration: 47.8 min · as reported: “Instrumentation (INST)”
    Show verbatim quote
    INST 50 47,83 51,52 2653,99 30,00
  9. Share of lost time: 19.0 % · as reported: “instrumentation faults”
    Show verbatim quote
    These reasons were linked to specific root causes: mechanical and electrical failures explained 30.2% of the stoppages, while instrumentation faults represented 19%.