Enhancing Operational Efficiency in an Animal Feed Pelleting Line Using Preventive Maintenance and Standard Work

Open source

1Bibliographic record

Authors
Fabiana Alva-Gayoso, Piero Germana-Cavero, Carlos Urbina-Rivera, Manuel Fernando Montoya Ramírez
Year
2025
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Animal feed and pet food
Process family
Forming, baking and cooking
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
In the company analyzed, the pelletizing machine operates with an Overall Equipment Effectiveness (OEE) of 80%, which is below the international benchmark of approximately 85%.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
dosing deviationspelletizing machine
Show verbatim quote (Introduction, p.1)
mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%)
Process defects (scrap and rework)Share of lost time3.40 %Adjudicated
high levels of waste reprocessingpelletizing machine
Show verbatim quote (Introduction, p.1)
mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%)
Process defects (scrap and rework)Share of lost time31.4 %Both extractors agreed
mechanical failures due to the lack of preventive maintenancepelletizing machine
Show verbatim quote (Introduction, p.1)
mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%)
Equipment failure (breakdowns)Share of lost time48.4 %Both extractors agreed
—pelletizing machine
Show verbatim quote (Introduction, p.1)
the pelletizing machine operates with an Overall Equipment Effectiveness (OEE) of 80%, which is below the international benchmark of approximately 85%
noneOEE80.0 %Both extractors agreed
waste reprocessing eventspellet mill
Show verbatim quote (Table 2)
Number of waste reprocessing events 11.5 11.4 0.88%
Process defects (scrap and rework)Number of events11.5 events/roundBoth extractors agreed
—pelletizing line
Show verbatim quote (Table 2)
Total bags produced 360 368 2.17%
noneThroughput360 bags/roundBoth extractors agreed
defective bagspellet mill
Show verbatim quote (Table 2)
Defective bags 0.9 0.867 3.80%
Process defects (scrap and rework)Number of events0.900 bags/roundBoth extractors agreed
production stoppagespelletizing machine
Show verbatim quote (Introduction, p.1)
A diagnostic analysis revealed that 83.2% of the lost productive time is associated with production stoppages, mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%).
Not classifiable from the reportShare of lost time83.2 %Single extractor

Observation units

  • Pellet mill (pelletizing line) · Forming, moulding and depositing · Baseline