Included study
Enhancing Operational Efficiency in an Animal Feed Pelleting Line Using Preventive Maintenance and Standard Work
1Bibliographic record
- Authors
- Fabiana Alva-Gayoso, Piero Germana-Cavero, Carlos Urbina-Rivera, Manuel Fernando Montoya Ramírez
- Year
- 2025
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Animal feed and pet food
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
In the company analyzed, the pelletizing machine operates with an Overall Equipment Effectiveness (OEE) of 80%, which is below the international benchmark of approximately 85%.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
dosing deviationspelletizing machineShow verbatim quote (Introduction, p.1)mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%) | Process defects (scrap and rework) | Share of lost time | 3.40 % | Adjudicated |
high levels of waste reprocessingpelletizing machineShow verbatim quote (Introduction, p.1)mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%) | Process defects (scrap and rework) | Share of lost time | 31.4 % | Both extractors agreed |
mechanical failures due to the lack of preventive maintenancepelletizing machineShow verbatim quote (Introduction, p.1)mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%) | Equipment failure (breakdowns) | Share of lost time | 48.4 % | Both extractors agreed |
—pelletizing machineShow verbatim quote (Introduction, p.1)the pelletizing machine operates with an Overall Equipment Effectiveness (OEE) of 80%, which is below the international benchmark of approximately 85% | none | OEE | 80.0 % | Both extractors agreed |
waste reprocessing eventspellet millShow verbatim quote (Table 2)Number of waste reprocessing events 11.5 11.4 0.88% | Process defects (scrap and rework) | Number of events | 11.5 events/round | Both extractors agreed |
—pelletizing lineShow verbatim quote (Table 2)Total bags produced 360 368 2.17% | none | Throughput | 360 bags/round | Both extractors agreed |
defective bagspellet millShow verbatim quote (Table 2)Defective bags 0.9 0.867 3.80% | Process defects (scrap and rework) | Number of events | 0.900 bags/round | Both extractors agreed |
production stoppagespelletizing machineShow verbatim quote (Introduction, p.1)A diagnostic analysis revealed that 83.2% of the lost productive time is associated with production stoppages, mainly caused by mechanical failures due to the lack of preventive maintenance (48.4%), high levels of waste reprocessing (31.4%), and dosing deviations (3.4%). | Not classifiable from the report | Share of lost time | 83.2 % | Single extractor |
Observation units
- Pellet mill (pelletizing line) · Forming, moulding and depositing · Baseline